cce hussam 1
TRANSCRIPT
-
8/10/2019 Cce Hussam 1
1/10
Eng : HUSSAM EL HAW
-
8/10/2019 Cce Hussam 1
2/10
Association for the Advanced Cost Engineering
AACE
Since 1956, AACE International has been the leading-edgeprofessional society for cost estimators, cost engineers,schedulers project managers, and project controlspecialists.
With more than 7,000 members worldwide, AACEInternational is the largest organization serving the entirespectrum of cost management professionals.
AACE International is industry independent, and hasmembers in 78 countries and 71 local sections.
-
8/10/2019 Cce Hussam 1
3/10
CCC / CCE
- AACE International's Certified Cost Consultant / Certified Cost
Engineer (CCC/CCE) certification program is designed toestablish credentials to recognize your professional expertise.
CCE
Certified Cost
Engineers
CCC
Certified Cost
Consultants
- This certification program gives professionals a means to
validate their skills and knowledge.
- CCC/CCE certification will distinguish you as a Certified Cost
Consultant/Certified Cost Engineer who has the knowledge
and skills that impact the bottom line.
-
8/10/2019 Cce Hussam 1
4/10
Summary of CCC/CCE Certification Process
1- Experience requirements :
- At least 8 full years of professional experience, of which up to 4years may be substituted by a college/university degree.
- Related degrees include: engineering, building construction,
construction technology, business, economics, accounting,
construction management, architecture, computer science,mathematics, etc.
2. Submit application and fees :
- AACE Members US$350.00
- Non-Members US$500.00
- Submit the application, work/education verification and
fees, at least 40 days before the next exam date to be
scheduled at an exam site.
-
8/10/2019 Cce Hussam 1
5/10
Summary of CCC/CCE Certification Process
3. Submit professional paper :
-You must submit an electronic copy of a professional paper of a minimum 2,500words on a cost engineering-related subject on or before the time of the
examination.
-You must also provide the exam proctor a CD with your professional paper at
the time of your exam.
-Candidates failing to submit their professional paper on CD at the time of their
exam will not be permitted to sit for the exam.- Papers previously authored within the prior three years may be used if
they meet the specific technical and length requirements.
-Papers are graded on a pass/fail basis.
4. Pass the examination :-To become a CCC/CCE, a 70%passing grade must be achieved on the 7-hourexam as determined by the Certification Board.
professional
paper
.
-
8/10/2019 Cce Hussam 1
6/10
CCC/CCE Exam Structure The CCC/CCE examination consists of 4parts (1 hour 45 minutes each).
Part IICost Estimating
Cost Control
Part IIIProject Management
Part IVEconomic Analysis
(open book)
Part I50 multiple-choice
questions on
Supporting Skills &
Knowledge
(open book)
Parts II, III and IV consist of 2 sections each :
- The first section has 5compound questions which
contain 7 multiple-choice questions each.
You will choose to answer only 2of these compound
questions, resulting in answering only 14multiple-choice
questions for the first section of each part.
- The second section of each part consists of 20multiple-
choice questions..
-
8/10/2019 Cce Hussam 1
7/10
Study Materials Skills & Knowledge of
Cost Engineering,
5th Edition Revised
.
CCC/CCE Certification
Study Guide, 3rd Edition
-
8/10/2019 Cce Hussam 1
8/10
Study Materials Jelens Cost and
Optimization Engineering,3rd Edition
Project Management: A
Reference for Professionals
-
8/10/2019 Cce Hussam 1
9/10
What is Cost Engineering? Cost Engineering is defined as :
the area of engineering practice where engineeringjudgment and experience are used in the applicationof scientific principles and techniques to :
-problems of cost estimating,
- cost control,
-business planning and
-management science,
- profitability analysis,- project management, and
-planning and scheduling.
(
)
(
)
.
-
8/10/2019 Cce Hussam 1
10/10
What is Cost Engineering?- Key objectives of cost engineering are :
to arrive at accurate cost estimates,
and to avoid cost overruns .
- This broad array of topics represents theintersectionof the fields of :
business
management
project
management
engineering
.
.
Cost Engineering