第八章 消防防護計畫 目 錄 - aec.gov.tw · standards and...

50
10102 8-i 第八章 消防防護計畫 錄 ㄧ、消防工作之組織及行政管理 ............................................................................ 8.1-1 () 消防工作組織 ........................................................................................... 8.1-1 () 權責區分 ................................................................................................... 8.1-1 二、火災災害分析及影響評估 ................................................................................ 8.2-1 () ......................................................................................................... 8.2-1 () 火災模擬計算工具 ................................................................................... 8.2-4 () 火災情境所需評估方法 ......................................................................... 8.2-12 () 假想情境模擬與評估結果 ..................................................................... 8.2-13 () 結論 ......................................................................................................... 8.2-35 三、防火設計及消防設備 ........................................................................................ 8.3-1 () 防火設計 ................................................................................................... 8.3-1 () 消防設備 ................................................................................................... 8.3-1 四、火警偵測及消防能力評估 ................................................................................ 8.4-1 ()火警偵測 ..................................................................................................... 8.4-1 () 核二廠現有消防能力評估 ....................................................................... 8.4-1 五、相關單位之消防及救護支援 ............................................................................ 8.5-1 六、防火及消防有關設備之維護及管理 ................................................................ 8.6-1 七、防火及消防有關之人員訓鍊 ............................................................................ 8.7-1 八、參考文獻 ............................................................................................................ 8.8-1

Upload: others

Post on 01-Sep-2019

5 views

Category:

Documents


0 download

TRANSCRIPT

  • 10102 8-i

    ............................................................................ 8.1-1 () ........................................................................................... 8.1-1 () ................................................................................................... 8.1-1

    ................................................................................ 8.2-1 () ......................................................................................................... 8.2-1 () ................................................................................... 8.2-4 () ......................................................................... 8.2-12 () ..................................................................... 8.2-13 () ......................................................................................................... 8.2-35

    ........................................................................................ 8.3-1 () ................................................................................................... 8.3-1 () ................................................................................................... 8.3-1

    ................................................................................ 8.4-1 () ..................................................................................................... 8.4-1 () ....................................................................... 8.4-1

    ............................................................................ 8.5-1 ................................................................ 8.6-1 ............................................................................ 8.7-1 ............................................................................................................ 8.8-1

  • 10102 8-ii

    8.1.1-1 .............................................................................. 8.1-3 8.2.1-1 ...................................................... 8.2-3 8.2.2-1 (Baker, 1996)............................................ 8.2-8 8.2.2-2 Ze..................................................................... 8.2-9 8.2.4-1 ............................................ 8.2-22 8.2.4-2 50........................................................ 8.2-22 8.2.4-3 50....................................... 8.2-23 8.2.4-4 50........................................... 8.2-23 8.2.4-5 50........................................ 8.2-24 8.2.4-6 50 .................................................... 8.2-24 8.2.4-7 ............................................................ 8.2-25 8.2.4-8 150,000............................ 8.2-25 8.2.4-9 150,000....................... 8.2-26 8.2.4-10 150,000................... 8.2-26 8.2.4-11 150,000 10.5 126 .................. 8.2-27 8.2.4-12 150,000 10.5 126...... 8.2-27 8.2.4-13 150,000............................. 8.2-28 8.2.4-14 150,000 6.5m 126m....... 8.2-28 8.2.4-15 150,000 6.5m 126m........... 8.2-29 8.2.4-16 650,000................................. 8.2-29 8.2.4-17 650,000 ................................................. 8.2-30 8.2.4-18 650,000 6.5 124

    ................................................................................................................8.2-30 8.2.4-19 650,000 6.5 124 8.2-31 8.2.4-20 1~6.......................................................... 8.2-31 8.2.4-21 ........................ 8.2-32 8.2.4-22 ........................................ 8.2-33 8.2.4-23 ........................................ 8.2-33 8.2.4-24 .................................................... 8.2-33

  • 10102 8-iii

    8.2.2-1 ........................ 8.2-10 8.2.2-2 ........................................................................................ 8.2-10 8.2.2-3 .................................................................................... 8.2-11 8.2.4-1 50................................................. 8.2-34

  • 10102

    8.1-1

    ()

    8.1.1-1

    ()

    1.

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    2.

    (1)

    (2)

  • 10102

    8.1-2

    (3)

    (4)

    (5)

    (6)

    (7)

    (8)

    3.

    (1)

    (2)

    (3)

    (4)

    (5)

  • 10102

    8.1-3

    8.1.1-1

    1.26 2.48

  • 10102

    8.2-1

    ()

    151

    ( 8.2.1-1)

    1.

    2.

    150,000 650,000

    6.5

    3.

    650,000

    6

  • 10102

    8.2-2

    4.

    30

  • 10102

    8.2-3

    8.2.1-1

    A B

    D

    C

    A15

    B65

    C

    D5

  • 10102

    8.2-4

    ()

    1. FDS

    FDS(Fire Dynamics Simulator) NIST (National Institute of

    Standards and Technology)

    (Conservation of Mass)

    (Conservation of Species)(Conservation of Momentum)

    (Conservation of Energy)

    1.

    0=+ u

    t

    2.

    ( ) lllll mYDuYYt+=+

    &

    3. :

    ( ) ++=+

    + fgpuu

    tu

    4. :

    ( ) lll

    lr YDhTkqDtDphuh

    t++=+

  • 10102

    8.2-5

    FDS(Large Eddy SimulationLES)

    2. ALOHA

    ALOHA (Areal Locations of Hazardous Atmospheres)

    NOAA(National Oceanic and Atmospheric Administration)

    EPA(Environmental Protection Agency)

    1000 ALOHA

    ALOHA

    A.

    ALOHA

    ALOHA ( 10

    2 1)

    B.

    ALOHA

    C.

    D.

    3. Baker-Strehlow method

    Baker-Strehlow methodBaker

    Strehlow TNO multi-energyBaker

    8.2.2-1

  • 10102

    8.2-6

    8.2.2-1 (material reactivity classification)

    TNO(Zeeuwen and Wiekema,1978)

    8.2.2-2

    point symmetry(3D)

    point symmetry planer symmetry (2D)

    line symmetry

    (1D)

    8.2.2-3

    10%(Low)

    10% 40%(Medium)

    40%

    (High)

    8.2.2-1 MW

    (flame velocity)(Mach numbers)

    Baker-Strehlow method

    (overpressure)

    3/10 )(EPrRn =

    Rn r(m) P0 E

  • 10102

    8.2-7

    4. TNT

    TNT

    TNT Ze 8.2.2-2

    R TNT

    1. TNT ( )4686( / )

    ETNT kgkJ kg

    =

    E(kJ)

    2. 3/1WRZe =

    R(m)

    W(kg)

    5. FLACS

    FLACS GexConCMR / CMI 1980

    3DFLACS

    A.

    B. FLACS

    C. FLACS

  • 10102

    8.2-8

    8.2.2-1 (Baker, 1996)

  • 10102

    8.2-9

    8.2.2-2 Ze

  • 10102

    8.2-10

    8.2.2-1

    1-D

    5.2 5.2 5.2 2.265 1.765 1.029 2.265 1.029 0.2942

    2-D

    1.765 1.029 0.588 1.235 0.662 0.118 0.662 0.471 0.079

    3-D

    0.588 0.153 0.071 0.206 0.1 0.037 0.147 0.1 0.037

    8.2.2-2

    point symmetry 3-D

    planer symmetry 2-D

    line symmetry 1-D

  • 10102

    8.2-11

    8.2.2-3

    10%

    10% 40%

    40%

  • 10102

    8.2-12

    ()

    ALOHA

    FDS

    FDS

    ALOHA

    FDS

    ALOHA FDS TNT

    1. ()

    (1) FDS

    (2) FDS

    (3) ALOHA

    2. ()

    (1) FDS

    (2) FDS

    3. ()

    (1) TNT

    4. ()

    (1) TNT

  • 10102

    8.2-13

    3 20.1892706 18.930.01

    m mm

    =

    ()

    1.

    50(

    50 50

    )

    FDS

    ALOHA

    FDSALOHA

    (1)

    A. FDS

    50

    FDS

    50 50 =189.2706

    =0.1892706m3 0.01

    A=18.93 m2 43,200( / )H kJ kg =

    20.039( / )m kg m s =&

    2 20.7 43,200( ) 0.039( ) 18.93( ) 22,325HRR H m A

    kJ kg kg m s m kW =

    = =

    &

  • 10102

    8.2-14

    155.2 2100.73827

    M kg sm kg s

    = =&

    50

    50

    3820kg/m 3 30.1892706 820 / 155.2m kg m kg =

    2 20.039( / ) 18.93( ) 0.73827( / )m m A kg m s m kg s= = =& &

    50

    210 210 FDS

    Zalosh

    1190-1600 F (917-1327 )

    1 0.25

    5 4

    1 m1.5 m2 m3

    m4 m5 m 6 m 8.2.4-1

    (2)

    50 8.2.4-2 FDS

    50 1082

    1 82 kW/m2 ( 8.2.4-3

    8.2.4-4) 8.2.4-5

  • 10102

    8.2-15

    2.

    (1) ALOHA

    50

    1.5 m/s

    F

    28

    (2)

    33 4 (

    )

    1.5

    1 0--1

    P PVE

    =

    -6 1032

    - - 1(1.39 10 ) ( ) ln( )0 g

    Plb mole TNT PW V R Tft BTU P P

    =

    ln( ) - (1- )EgE

    PPE R TP P

    =

    (E)

    ( )4686( / )

    ETNT kgkJ kg

    = TNT

    TNT 3/1WRZe = Ze

    8.2.2-2

    TNT

    3/1WRZe =

  • 10102

    8.2-16

    (3)

    ALOHA 8.2.4-1

    8.2.4-6 8.2.4-1 8.2.4-6 50

    ALOHA

    1~10

    22 psi 50

    2.

    2 150,000 650,000

    8.2.1-1 A B

    FDS

    (1) 150,000

    8.2.1-1 A 150,000

    6.5 126 FDS

    A. 287 m2

    150,000

    287 m2

  • 10102

    8.2-17

    2 20.7 44,600( ) 0.1( ) 287( ) 896, 014

    HRR H m A

    kJ kg kg m s m kW

    =

    = =

    &

    B.

    A=287 m2 44,600( / )H kJ kg =

    20.1( / )m kg m s =&

    C.

    10 1m

    1.5m2m3m4m5m 6m 8.2.4-7

    150,000

    8.2.4-8 8.2.4-12

    8.2.4-11 8.2.4-12 150,000

    10.5 40 126

    10.5

    58 kW/m2126

    2.05 kW/m2

    10

    1 m1.5 m2 m3 m4 m5 m 6 m 8.2.4-13

    8.2.4-14

    8.2.4-15 150,000 126

    6.5

    70 kW/m2

    (6.5 )

  • 10102

    8.2-18

    (2) 650,000

    8.2.1-1 B 6.5

    124 FDS

    A. 132.73 m2

    132.73 m2

    B.

    A=132.73 m2 44,600( / )H kJ kg =

    20.1( / )m kg m s =&

    2 20.7 44,600( ) 0.1( ) 132.73( ) 414,383HRR H m A

    kJ kg kg m s m kW =

    = =

    &

    C.

    10

    1 m1.5 m2 m3 m4 m5 m 6m

    8.2.4-16 8.2.4-17

    8.2.4-18 8.2.4-19 124

    6.5 58 kW/m2

    (6.5

    )

  • 10102

    8.2-19

    3.

    8.2.1-1 C

    6.6 kV/110-220V25 kVA 3.79 A

    TNT

    4.0 A( 3.79A)

    0.1

    ()=() ()

    ( ) ( ) ( )P W I A E V= .( 1)

    ( ) 6600( ) 4.0( ) 26400( ) 26.4( / )P W V A W kJ s= = = ..( 2)

    0.1

    26.4( / ) 0.1( ) 2.64( )kJ s s kJ = ( 3)

    TNT

    2.64( )( ) 0.000563( )4686( / ) 4686( / )

    E kJTNT kg kgkJ kg kJ kg

    = = = ( 4)

    4

    0.000563kg TNT 0.000563 kg TNT

  • 10102

    8.2-20

    3/1W

    RZe = Ze

    ( 8.2.2-2)

    6 1~6 8.2.4-20

    8.2.4-20

    22 psi

    4.

    30

    10 8.2.1-1

    4.16 kV4.0 MW360 Hz1200 rpm

    0.8 PF 42,644 A

    TNT

    0.1

    1

    ( ) 4160( ) 42644( ) 177399040( ) 177399.04( / )P W V A W kJ s= = = ( 5)

    0.1

    177399.04( / ) 0.1( ) 17739.904( )kJ s s kJ = .( 6)

    TNT

    17739.904( )( ) 3.78( )4686( / ) 4686( / )

    E kJTNT kg kgkJ kg kJ kg

    = = = ..( 7)

  • 10102

    8.2-21

    7

    3.78 kg TNT 3.78 kg TNT

    3/1WRZe = Ze(

    8.2.2-2)

    30 10 30

    8.2.4-21 8.2.4-21

    30 22

    psi

    (

    8.2.4-22 8.2.4-24)

  • 10102

    8.2-22

    8.2.4-1

    8.2.4-2 50

  • 10102

    8.2-23

    8.2.4-3 50

    8.2.4-4 50

  • 10102

    8.2-24

    8.2.4-5 50

    8.2.4-6 50

  • 10102

    8.2-25

    8.2.4-7

    8.2.4-8 150,000

  • 10102

    8.2-26

    8.2.4-9 150,000

    8.2.4-10 150,000

  • 10102

    8.2-27

    8.2.4-11 150,000 10.5 126

    8.2.4-12 150,000 10.5 126

  • 10102

    8.2-28

    8.2.4-13 150,000

    8.2.4-14 150,000 6.5m 126m

  • 10102

    8.2-29

    8.2.4-15 150,000 6.5m 126m

    8.2.4-16 650,000

  • 10102

    8.2-30

    8.2.4-17 650,000

    8.2.4-18 650,000 6.5 124

  • 10102

    8.2-31

    8.2.4-19 650,000 6.5 124

    8.2.4-20 1~6

  • 10102

    8.2-32

    8.2.4-21

  • 10102

    8.2-33

    8.2.4-22

    8.2.4-23

    8.2.4-24

  • 10102

    8.2-34

    8.2.4-1 50

    ALOHA(psi) (psi) (m)

    1 6.35 2.15 5.8 2.465 14.5

    2 6.35 1.62 1.88 1.01 3.698

    3 5.91 1.29 1.16 0.681 2.03

    4 3.37 1.07 0.87 0.406 1.45

    5 2.28 0.91 0.58 0.305 1.08

    6 1.7 0.789 0.45 0.254 0.87

    7 1.34 0.695 0.42 0.22 0.652

    8 1.11 0.62 0.35 0.189 0.58

    9 0.936 0.559 0.29 0.16 0.507

    10 0.809 0.508 0.276 0.13 0.435

  • 10102

    8.2-35

    ()

    FDS

    ALOHA TNT

    (50)

    FDS

    1 82 kW/m2

    50 ALOHA

    1~10

    22 psi 50

    150,000 650,000

    126 124

    6.5 FDS

    150,000 126

    20 0 kW/m2

    6.5

    70 kW/m2

    (6.5)

  • 10102

    8.2-36

    650,000 124

    20 0 kW/m2

    6.5

    58 kW/m2

    (6.5)

    6

    6.6 kV/110 -220V25 kVA

    3.79 A

    TNT

    1 6 1 6

    1.16 psi 0.13 psi 22 psi 6

    30

    4.16

    kV4.0 MW360 Hz1200 rpm0.8PF 42,644 A

    TNT

    TNT

    5 30 9.43 psi 0.71 psi 22

    psi

  • 10102

    8.3-1

    ()

    (

    ()

    1.

    790()

    2.

    107

    3.

    (1) 617.5.4.1

    (2) 617.5.4.2 18

    (3) 617.5.4.3

    (4) 617.5.5.1

    4.

    1 1/2 371

    2 1/2 131

  • 10102

    8.3-2

    5.

    ABA 19,508B

    23,858 43,366 78 7.5 kg/cm2

  • 10102

    8.4-1

    ()

    CCTV

    ()

    1. /

    (1) 24 6

    (2) 48

    2.

    (1) 10,000 L

    (2) 120 L 2,000 L

    (3)

    (4)

    (5)

  • 10102

    8.5-1

    96 10 1

    --

    --

    --

    --

    --

  • 10102

    8.6-1

  • 10102

    8.7-1

    1.

    2.

    3.

    (1) 1425 3

    (2) 7914

    4.

  • 10102

    8.8-1

    1. 151

    2. 790()

    3. 107

    4. 617.5.4.1

    5. 617.5.4.2 18

    6. 617.5.4.3

    7. 617.5.5.1

    8. 1425

    9. 791