CAVIAR Meeting. May 2010 Liam Tallis, Keith Shine, Tom Gardiner, Marc Coleman, Igor Ptashnik. Contents. Assessment of H 2 O Line Intensities Camborne Jungfraujoch Moving Toward the Absolute Calibration Camborne Future Work. Introduction. Assessment of H 2 O Line Intensities. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CAVIAR Meeting

CAVIAR Meeting

May 2010

Liam Tallis, Keith Shine, Tom Gardiner, Marc Coleman, Igor Ptashnik

Page 2: CAVIAR Meeting

Contents

• Assessment of H2O Line Intensities– Camborne– Jungfraujoch

• Moving Toward the Absolute Calibration– Camborne

• Future Work

Page 3: CAVIAR Meeting

ASSESSMENT OF H2O LINE INTENSITIES

Introduction

Page 4: CAVIAR Meeting

Introduction

a τw + b τg + c

Page 5: CAVIAR Meeting

ASSESSMENT OF H2O LINE INTENSITIES

Camborne

Page 6: CAVIAR Meeting

Retrieved “a” parametera = 1.02 +/- 0.03

a = 1.20 +/- 0.04a = 1.01 +/- 0.06

Page 7: CAVIAR Meeting

Camborne: Retrieved ‘a’

Spectral Region (cm-1) Retrieved ‘a’

3000 – 8000 0.97 +/- 0.02

8000 – 9200 1.17 +/- 0.05

10000 - 14000 0.98 +/- 0.07

Page 8: CAVIAR Meeting

Retrieved “a” against Pseudo Strength

Page 9: CAVIAR Meeting

Retrieved “a” against Pseudo Strength

Page 10: CAVIAR Meeting

MCT Problems

Page 11: CAVIAR Meeting

MCT Problems

Page 12: CAVIAR Meeting

MCT Problems

Page 13: CAVIAR Meeting

MCT Problems

Page 14: CAVIAR Meeting

Fit Wings of Strong Lines

Page 15: CAVIAR Meeting

Fit All of Weaker Lines

Page 16: CAVIAR Meeting

Retrieved “a” parameter

Page 17: CAVIAR Meeting

MCT Retrieved “a” Numbers

Flight Date Time (U.T.)Solar Zenith Angle

Average a Value Between 820cm-1 and 920cm-1

B396 19 Aug 2008 130941 38.77 0.976131243 38.92 0.979

B400 18 Sep 2008 111459 48.98 1.025

Page 18: CAVIAR Meeting

ASSESSMENT OF H2O LINE INTENSITIES

Jungfraujoch

Page 19: CAVIAR Meeting

Retrieved “a” parametera = 1.00 +/- 0.04

a = 1.17 +/- 0.04a = 0.99 +/- 0.05

Page 20: CAVIAR Meeting

Retrieved “a” parameter

Page 21: CAVIAR Meeting

ABSOLUTE CALIBRATION

Page 22: CAVIAR Meeting

Absolute Calibration

Page 23: CAVIAR Meeting
Page 24: CAVIAR Meeting
Page 25: CAVIAR Meeting
Page 26: CAVIAR Meeting
Page 27: CAVIAR Meeting

FUTURE WORK

Page 28: CAVIAR Meeting

Future Work• Assessment of Line Intensities

– Camborne • Completed; retrieved “a” are consistent with previous work at Reading

– Jungfraujoch• Work has began; will be fairly quick with confirmed water profiles. Initial

results are quite promising to moving closer to band centres

• Absolute Calibration– Camborne

• On going work; need to think in some detail now what is causing difference between model and observations (line lists, continuum model, Kurucz , water profiles.........)

– Jungfraujoch• Calibration data now available; work to begin after Camborne