Project name: Nepal-India Regional Trade And
Transport Project -MOCS
Loan: 5273-MOCS
Procurement Plan Version: 2017-1
Status: Approved
Date of Last Change of Status: 10/01/2017
Category Works: Activities ShowHide
P.P. - Executing Agency: 2017-1-MOCS -
Method: NCB (National Competitive
NIRTTP-MOCS-1-NCB-O-
NIRTTP/PCO/NITDB/W/NCB-1
Activity Cancelled
Post Review
NIRTTP-MOCS-3-NCB-O-
NIRTTP/PCO/NITDB/W/NCB-3
Contract under execution
Prior Review
NIRTTP-MOCS-5-NCB-O-
NIRTTP/PCO/W/NCB-5
Activity Cancelled
Post Review
NIRTTP-MOCS-59-NCB-O-
NIRTTP/PCO/DOTM/W/NCB-6
Expected
Post Review
Construction of Sanitary and Phyto-santary
SPS/Plant Quarantine and Regional Plant
ProtectionLaboratory
NIRTTP-MOCS-149-NCB-O-
NIRTTP/PCO/PPD/W/NCB-9
to replace Plant Protection Laboratory at
Hariharbhawan which was severely
damaged by Nepal Earthquake April, 2015
Expected
Post ReviewMethod: SH (Shopping)
NIRTTP-MOCS-112-CP-O-
NIRTTP/PCO/W/SHP-8
Contract Completed
Post ReviewMethod: DC (Direct contracting)
New Activities
Modified Activities
Canceled Activities
Activities without Modification
Construction of Extension Storage Sheds,
North side and South side blocks for ICD
Birgunj
Bagmati Zone
Description Reference # Province/State
Construction of flexible and rigid
pavements with drains for pavement
restoration at Bhairahawa ICD
Bagmati Zone
Consturction of Weighbridges for Axle Load
Control -2 Nos
Bagmati Zone
Construction of Pilot Trade-related
Laboratory
Bagmati Zone
Construction of Toilets and partition of
Rooms in existing Office Space of PCO
Bagmati Zone
Bagmati Zone
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
NIRTTP-MOCS-2-CD-O-
NIRTTP/PCO/NITDB/W/DC-2
Activity Cancelled
Prior ReviewMethod: ICB (International Competitive
NIRTTP-MOCS-4-LPI-O-
NIRTTP/PCO/NITDB/W/ICB-4
Expected
Prior Review
NIRTTP-MOCS-89-LPI-O-
NIRTTP/PCO/NITDB/W/ICB-1
Contract under execution
Post Review
NIRTTP-MOCS-118-LPI-O-
NIRTTP/PCO/NITDB/W/ICB-7
Expected
Post Review
Category Goods: Activities ShowHide
Description Reference # Province/State
P.P. - Executing Agency: 2017-1-MOCS -
Method: NCB (National Competitive
NIRTTP-MOCS-10-NCB-B-
NIRTTP/PCO/G/SHP-6
Contract Completed
Post Review
NIRTTP-MOCS-11-NCB-B-
NIRTTP/PCO/G/NCB-7
Activity Cancelled
Post Review
NIRTTP-MOCS-132-NCB-B-
NIRTTP/PCO/TEPC/G/NCB-25
Expected
Post Review
Procurement of Server, Smart Phone/Tabs,
Laptop Computers and necessary
equipment for RAIMS
NIRTTP-MOCS-145-NCB-B-
NIRTTP/PCO/DOTM/G/NCB-30
RAIMS-Road Accident Information
Management System
Expected
Post Review
Printing of various Road Safety Regulations
and Materials
NIRTTP-MOCS-148-NCB-B-
NIRTTP/PCO/DOTM/G/NCB-31
Coordinate with Indian Railways for
construction and development of existing
railway tracks into ballastless tracks
Bagmati Zone
Extension of Storage Shed at Birgunj ICD Bagmati Zone
Construction of containers frieght station
(CFS) at Kathmandu
Bagmati Zone
Construction and development of existing
railway tracks into ballastless tracks
Bagmati Zone
Procurement of Vehicle for PCO (2 Cars and
5 Motorcycles)
Bagmati Zone
Procurement of Deasktop and Laptop
Computers, and necessary equipments for
TEPC
Bagmati Zone
Procurement of Design, Supply and Build
Trade Protal
Bagmati Zone
Bagmati Zone
Bagmati Zone
to help promote Road transportation safety Expected
Post ReviewMethod: SH (Shopping)
NIRTTP-MOCS-6-CP-B-NIRTTP/PCO/G/SHP-
1
Contract Completed
Post Review
NIRTTP-MOCS-7-CP-B-NITRTTP/PCO/G/SHP-
2
Contract Completed
Post Review
NIRTTP-MOCS-8-CP-B-NIRTTP/PCO/G/SHP-
3
Contract Completed
Post Review
NIRTTP-MOCS-9-CP-B-NIRTTP/PCO/G/SHP-
4
Contract Completed
Post Review
Procurement of Sub PCO Office Furniture,
Fixture and Furnishing for DOTM
NIRTTP-MOCS-60-CP-B-
NIRTTP/PCO/DOTM/G/SHP-7
For the Entirre Project Period Contract Completed
Post Review
Procurement of Computers, Printers and IT
Backup for DOTM
NIRTTP-MOCS-61-CP-B-
NIRTTP/PCO/DOTM/G/SHP-8
For Entire Project Period Contract Completed
Post Review
Procurement of Equipment (Generator,
Photocopy Machine, Fax Machine etc.) for
DOTM
NIRTTP-MOCS-62-CP-B-
NIRTTP/PCO/DOTM/G/SHP-9
For Entire Project Period Activity Cancelled
Post Review
Procurement of Stationery, Sundries, and
Fuel etc. fof DOTM
NIRTTP-MOCS-63-CP-B-
NIRTTP/PCO/DOTM/G/SHP-10
For Entire Project Period Contract Completed
Post Review
NIRTTP-MOCS-74-CP-B-NIRTTP/PCO/G/SHP-
11
Contract Completed
Post Review
NIRTTP-MOCS-75-CP-B-NIRTTP/PCO/G/SHP-
12
Bagmati Zone
Procurement of Computers, Printers for
PCO
Bagmati Zone
Procurement of Office Furniture, Fixtures
and Furnishing for PCO
Bagmati Zone
Procurement of Stationery and Sundries,
Fuel etc for PCO
Bagmati Zone
Procurement of Equipment (Generator,
Photocopy Machine etc.) for PCO
Bagmati Zone
Bagmati Zone
Bagmati Zone
Bagmati Zone
Procurement of Office Furniture, Fixtures
and Furnishing for existing and expanded
portion of PCO office
Bagmati Zone
Bagmati Zone
Procurement of Electronic equipment like
Computer, Printer, Scanner, Camera etc.
for PCO office
Bagmati Zone
Activity Cancelled
Post Review
NIRTTP-MOCS-76-CP-B-NIRTTP/PCO/G/SHP-
13
Activity Cancelled
Post Review
NIRTTP-MOCS-77-CP-B-NIRTTP/PCO/G/SHP-
14
Contract Completed
Post Review
NIRTTP-MOCS-78-CP-B-
NIRTTP/PCO/DOTM/G/SHP-15
Contract Completed
Post Review
NIRTTP-MOCS-79-CP-B-
NIRTTP/PCO/DOTM/G/SHP-16
Activity Cancelled
Post Review
NIRTTP-MOCS-80-CP-B-
NIRTTP/PCO/DOTM/G/SHP-17
Activity Cancelled
Post Review
NIRTTP-MOCS-99-CP-B-NIRTTP/PCO/G/SHP-
18
Contract Completed
Post Review
NIRTTP-MOCS-111-CP-B-
NIRTTP/PCO/G/SHP-19Contract Completed
Post Review
NIRTTP-MOCS-114-CP-B-
NIRTTP/PCO/TEPC/G/SHP-22
Contract Completed
Post Review
NIRTTP-MOCS-115-CP-B-
NIRTTP/PCO/DOTM/G/SHP-23
Expected
Post Review
NIRTTP-MOCS-116-CP-B-
NIRTTP/PCO/G/SHP-21
Contract Completed
Post Review
NIRTTP-MOCS-117-CP-B-
NIRTTP/PCO/G/SHP-20
Procurement of Equipment like UPS and
Battery for power backup, Photocopy
Machine etc. for PCO office
Bagmati Zone
Procurement of Electronic equipment like
Computer, Printer, Scanner, Camera etc.
for PCO office
Bagmati Zone
Procurement of Furniture, Fixture and
Furnishing for Sub-PCO office in DoTM
Bagmati Zone
Procurement of Stationery and Sundries for
PCO office
Bagmati Zone
Purchasing of Vehicle (1 Car) for PCO Bagmati Zone
Procurement of Stationery and Sundries for
Sub- PCO office in DoTM
Bagmati Zone
Procurement of Computers, Printers and
Power Backup for Sub-PCO office in DoTM
Bagmati Zone
Procurement of Office Furniture and
furnishing for TEPC
Bagmati Zone
Procurement of Electronic equipments like
Desktop and Laptop Computer, Printer,
Photocopier, Air Conditioner etc. for PCO
office
Bagmati Zone
Procurement of Stationery and Sundries for
PCO
Bagmati Zone
Procurement of Stationery and Sundries for
Sub project offices
Bagmati Zone
Procurement of Office Furniture for DoTM Bagmati Zone
Expected
Post Review
NIRTTP-MOCS-120-CP-B-
NIRTTP/PCO/DOTM/G/SHP-27
Contract Completed
Post Review
NIRTTP-MOCS-122-CP-B-
NIRTTP/PCO/TEPC/G/SHP-24
Contract Completed
Post Review
NIRTTP-MOCS-133-CP-B-
NIRTTP/PCO/TEPC/G/SHP-26
Expected
Post Review
NIRTTP-MOCS-143-CP-B-
NIRTTP/PCO/PPD/G/SHP-29
Expected
Post Review
NIRTTP-MOCS-152-CP-B-
NIRTTP/PCO/G/SHP-32
Expected
Post Review
NIRTTP-MOCS-153-CP-B-
NIRTTP/PCO/G/SHP-33
Expected
Post Review
NIRTTP-MOCS-155-CP-B-
NIRTTP/PCO/DOTM/G/SHP-34
Expected
Post Review
Supply and Installation of Solar System with
Batteries and Power Inverter
NIRTTP-MOCS-165-CP-B-
NIRTTP/PCO/G/SHP-35
for Power Backup in PCO Expected
Post Review
Procurement of Stationery and Sundries for
PCO
Bagmati Zone
Procurement of Server, Deasktop and
Laptop Computers, Multimedia Projector,
external drives etc. for TEPC
Bagmati Zone
Procurement of mobile axle load
measurement units
Bagmati Zone
Procurement of Laptop Computers, SLR
Camera etc. for Plant Protection
Directorate
Bagmati Zone
Procurement of Office Furniture and
furnishing for TEPC
Bagmati Zone
Procurement of Computers, Printers, GIS
Software and furnitures for DOTM
Bagmati Zone
Procurement of Office Furniture, Fixtures
and Furnishing for PCO
Bagmati Zone
Procurement of Computers, Printers,
Projector, Photocopier, Video camera etc.
for PCO
Bagmati Zone
Bagmati Zone
Method: DC (Direct contracting)
Procurement of LED Television Screen and
Memory Sticks
NIRTTP-MOCS-137-CD-B-
NIRTTP/PCO/DOTM/G/DC-28
Required for Displaying of Road Safety
awareness audio video materials and
slogans in Transport Management and
Traffic police offices. For this procurement,
CG Electronics is found most economical
and reliable for after sales services through
the comparison of LED Televisions of
famous and reliable brands i.e. Samsung,
LG and CG Electronics. Thus, Direct
Contracting method is proposed for
economic and effective procurement of 48
LED Televisions and 60 memory sticks.
Expected
Post Review
NIRTTP-MOCS-12-LPI-B-NIRTTP/PCO/G/ICB-
8
Activity Cancelled
Prior Review
NIRTTP-MOCS-13-LPI-B-
NIRTTP/PCO/DoC/G/ICB-11
Activity Cancelled
Prior Review
Category Non consultant services: Activities ShowHide
Description Reference # Province/State
P.P. - Executing Agency: 2017-1-MOCS -
Method: NCB (National Competitive
NIRTTP-MOCS-31-NCB-S-
NIRTTP/PCO/NS/NCB-17
Contract Completed
Post Review
NIRTTP-MOCS-32-NCB-S-
NIRTTP/PCO/NS/NCB-18
Activity Cancelled
Post Review
NIRTTP-MOCS-33-NCB-S-
NIRTTP/PCO/NS/NCB-19
Bagmati Zone
Procurement of Design, Supply and Build
Nepal Single Window (Second Stage)
Bagmati Zone
Method: ICB (International Competitive Bidding)
Procurement of Design, Supply and Build
Nepal Single Window (First Stage)
Bagmati Zone
Selection and Recruitment of Finance
Assistant for PCO
Bagmati Zone
Selection & Recruitment of Office Secretary
for PCO
Bagmati Zone
Selection & Recruitment of IT Assistant for
PCO- 2 Nos
Bagmati Zone
Contract Completed
Post Review
NIRTTP-MOCS-34-NCB-S-
NIRTTP/PCO/NS/NCB-20
Activity Cancelled
Post Review
NIRTTP-MOCS-35-NCB-S-
NIRTTP/PCO/NS/NCB-21
Activity Cancelled
Post Review
NIRTTP-MOCS-36-NCB-S-
NIRTTP/PCO/NS/NCB-22
Contract Completed
Post Review
NIRTTP-MOCS-37-NCB-S-
NIRTTP/PCO/NS/NCB-23
Contract Completed
Post Review
NIRTTP-MOCS-38-NCB-S-
NIRTTP/PCO/NS/NCB-24
Contract Completed
Post Review
NIRTTP-MOCS-39-NCB-S-
NIRTTP/PCO/NITB/NS/NCB-25
Activity Cancelled
Post Review
NIRTTP-MOCS-40-NCB-S-
NIRTTP/PCO/NITB/NS/NCB-28
Activity Cancelled
Prior Review
NIRTTP-MOCS-73-NCB-S-
NIRTTP/PCO/NS/NCB-29
Expected
Post Review
NIRTTP-MOCS-86-NCB-S-
NIRTTP/PCO/TEPC/NS/NCB-30
Activity Cancelled
Post Review
Selection and Recruitment of Assistants for
PCO
NIRTTP-MOCS-104-NCB-S-
NIRTTP/PCO/NS/SHP-31
i) Finance Assistant-1 no.; IT Assistant-1
no.; Project Secretary-1 nos., Office
Assistant-3 nos.; Light Vehicle Driver-3
nos.; and Security Guard-2 nos.
Expected
Selection & Recruitment of Office Secretary
for PCO-2 Nos
Bagmati Zone
Selection & Recruitment of IT Assistant for
PCO- 2 Nos
Bagmati Zone
Selection and Recruitment of Driver for
PCO - 2 Nos
Bagmati Zone
Selection & Recruitment of Office
Secretaries for DoC, DoTM, NITDB, TEPC &
DFTQC- 5 Nos
Bagmati Zone
Selection and Recruitment of Security
Guard for PCO-2 Nos
Bagmati Zone
Selection of Office Assistant for PCO -3 Nos Bagmati Zone
Admin & Logistics costs for Birgunj and
Bhairahawa ICDs construction
Bagmati Zone
Selection & Recruitment of Finance
Assistant for NITDB
Bagmati Zone
Procurement of Design, Supply and Build
Trade Portal
Bagmati Zone
Kolkata-Kathmandu Corridor Monitoring
and Evaluation Data Management System
(CMEDMS)
Bagmati Zone
Bagmati Zone
Post Review
Selection & Recruitment of Office Secretay NIRTTP-MOCS-105-NCB-S-
NIRTTP/PCO/DOC/NS/SHP-32
For DoC-1 no. Expected
Post Review
Selection & Recruitment of Office Secretay NIRTTP-MOCS-107-NCB-S-
NIRTTP/PCO/DOTM/NS/SHP-33
For DoTM-1 no. Expected
Post ReviewMethod: DA (Direct Administration)
NIRTTP-MOCS-15-AD-S-
NIRTTP/PCO/DOTM/NS/DC-2
Activity Cancelled
Post Review
NIRTTP-MOCS-16-AD-S-
NIRTTP/PCO/DOTM/NS/DC-3Contract Completed
Post Review
NIRTTP-MOCS-17-AD-S-
NIRTTP/PCO/DOTM/NS/DC-4
Activity Cancelled
Post Review
NIRTTP-MOCS-18-AD-S-
NIRTTP/PCO/DOC/NS/DC-5
Activity Cancelled
Prior Review
NIRTTP-MOCS-19-AD-S-
NIRTTP/PCO/TEPC/NS/DC-6
Activity Cancelled
Prior Review
NIRTTP-MOCS-21-AD-S-NIRTTP/PCO/NS/DC-
9
Activity Cancelled
Post Review
NIRTTP-MOCS-22-AD-S-NIRTTP/PCO/NS/DC-
10
Activity Cancelled
Post Review
NIRTTP-MOCS-23-AD-S-NIRTTP/PCO/NS/DC-
11
Activity Cancelled
Post Review
NIRTTP-MOCS-24-AD-S-NIRTTP/PCO/NS/DC-
12
Bagmati Zone
Interaction with Stakeholder entites by
DoTM
Bagmati Zone
Bagmati Zone
Bagmati Zone
Monitoring and Evaluation expenses for
DoTM -(GON TA/DA)
Bagmati Zone
Publication and Dissemination of
Awareness raising Progarm on Road Safety
by DoTM- (through brochures, radio and
television)
Bagmati Zone
ICT Capacity Enhancement of IT Personnel
at TEPC
Bagmati Zone
ICT Capacity Enhancement of IT Personnel
at DoC
Bagmati Zone
PCO Vehicle Maintenance, Fuel and POL
etc.
Bagmati Zone
Office Expenses for PCO Bagmati Zone
Operation & Maintenance Bagmati Zone
Other Utility Services for PCO Bagmati Zone
Activity Cancelled
Post Review
NIRTTP-MOCS-25-AD-S-NIRTTP/PCO/NS/DC-
13
Activity Cancelled
Post Review
NIRTTP-MOCS-26-AD-S-NIRTTP/PCO/DC-14
Activity Cancelled
Post Review
NIRTTP-MOCS-28-AD-S-NIRTTP/PCO/NS/DC-
16
Activity Cancelled
Post Review
NIRTTP-MOCS-29-AD-S-NIRTTP/PCO/NS/DC-
17
Activity Cancelled
Post Review
Meeting Allwance for DOTM NIRTTP-MOCS-58-AD-S-
NIRTTP/PCO/DOTM/NS/DC-5
Over the Project Period Activity Cancelled
Post Review
NIRTTP-MOCS-68-AD-S-NIRTTP/PCO/NS/DC-
8
Contract Completed
Post Review
NIRTTP-MOCS-121-AD-S-
NIRTTP/PCO/DOTM/NS/NCB-35Expected
Post ReviewMethod: SH (Shopping)
NIRTTP-MOCS-20-CP-S-
NIRTTP/PCO/NS/SHP-8
Activity Cancelled
Post Review
NIRTTP-MOCS-27-CP-S-
NIRTTP/PCO/NS/SHP-15
Activity Cancelled
Prior Review
NIRTTP-MOCS-30-CP-S-
NIRTTP/PCO/NS/SHP-16
Contract Completed
Post Review
Operation & Maintenance Bagmati Zone
Miscellaneous Expenses Bagmati Zone
Books & Materials Bagmati Zone
Meeting and Other Allowance (GON) Bagmati Zone
Monitoring and Evaluation by MoCs
personnel (GON TA/DA)
Bagmati Zone
Developing web based Road Accident
Management Information System (RAMIS)
and piloting in Kathmandu valley and along
the Birgunj-Kathmandu corridor
Bagmati Zone
Study Travel by MoCS officials of Sea Port
in India on Transshipment
Bagmati Zone
Bagmati Zone
Training for Project Staff and other
stakeholders to be identified before
Implementation
Bagmati Zone
PCO Office Lease- Rental Bagmati Zone
Other Programs (Web Page design,
Accounting Software, Inventory Software
and others)
Bagmati Zone
NIRTTP-MOCS-81-CP-S-
NIRTTP/PCO/DOTM/NS/SHP-27Contract Completed
Post Review
NIRTTP-MOCS-82-CP-S-
NIRTTP/PCO/NS/SHP-26
Expected
Post Review
Selection & Recruitment of Office Secretay NIRTTP-MOCS-113-CP-S-
NIRTTP/PCO/TEPC/NS/SHP-34
For TEPC-1 no. Contract under execution
Post Review
Procurement of Supply and Installation of
Online UPS backup with software and LAN
networking of computer systems for TEPC
NIRTTP-MOCS-124-CP-S-
NIRTTP/PCO/TEPC/NS/SHP-36
With external battery in metallic box, port
switches, Software and anti-virus for
Server, Computers and printers along with
LAN Networking of the system and
necessary electrification including all
accessories.
Contract Completed
Post Review
Procurement of firm for Determination of
Border crossing and transportation time of
Cargo
NIRTTP-MOCS-136-CP-S-
NIRTTP/PCO/NITDB/NS/SHP-37
Originating at Kolkata to reach Kathmandu
and vice versa for the both Road and
Railway mode of transportation
Contract under execution
Post Review
Developmentof National Pest Surveillance
Management Information System
NIRTTP-MOCS-139-CP-S-
NIRTTP/PCO/PPD/NS/SHP-38
Both software and web based system
development
Expected
Post Review
ICT System Development for both the
Ministry of Commerce and Department of
Commerce
NIRTTP-MOCS-154-CP-S-
NIRTTP/PCO/NS/SHP-34
Publication and Dissemination of
Awareness raising Progarm on Road Safety
by Sub-PCO in DoTM- (through brochures,
radio and television)
Bagmati Zone
Bagmati Zone
Computer software design, installation
helpful in improvement of operation and
management of the Project
Bagmati Zone
Bagmati Zone
Bagmati Zone
Bagmati Zone
Bagmati Zone
In lot1Technical requirements, in lot 2
software development and in lot 3 Supply
of hardwares and installation of softwares
for system implementation
Activity Cancelled
Post ReviewMethod: DC (Direct contracting)
NIRTTP-MOCS-144-CD-S-
NIRTTP/PCO/TEPC/NS/DC-40
Contract under execution
Post ReviewMethod: ICB (International Competitive
NIRTTP-MOCS-87-LPI-S-
NIRTTP/PCO/DOC/NS/ICB-1
Ongoing Activity
Prior Review
Category Consultants - Firms: Activities ShowHide
Description Reference # Province/State
P.P. - Executing Agency: 2017-1-MOCS -
Method: LCS (Least Cost Selection)
Consulting Servieces to support DOTM for
bus routes, vehicle standard survey and for
preparing standard criteria for route
permits
NIRTTP-MOCS-146-SBMC-CF-
NIRTTP/PCO/DOTM/S/LCS-47
in Western, Central and Eastern regions of
Nepal
Expected
Post ReviewMethod: QCBS (Quality and Cost Based
NIRTTP-MOCS-125-SBCC-CF-
NIRTTP/PCO/S/QCBS-35Activity Cancelled
Post Review
NIRTTP-MOCS-126-SBCC-CF-
NIRTTP/PCO/S/QCBS-36
Activity Cancelled
Post ReviewMethod: CQS (Selection based on
Bagmati Zone
Procurement of Design, Supply and Build
National Single Window IT system in Nepal
Bagmati Zone
Nepal Trade Portal Data Migration and
Hosting Service
Bagmati Zone
Bagmati Zone
Consulting Services for a Study on
Improvement of Nepal India Trading
Regime
Bagmati Zone
Consulting Services for Preparation of
Medium Term Strategies and Action Plan
for Strengthening the Ministry of
Commerce (MoC)
Bagmati Zone
NIRTTP-MOCS-128-SCC-CF-
NIRTTP/PCO/S/CQS-37
Activity Cancelled
Post Review
NIRTTP-MOCS-129-SCC-CF-
NIRTTP/PCO/S/CQS-38Activity Cancelled
Post Review
NIRTTP-MOCS-131-SCC-CF-
NIRTTP/PCO/MOAD/S/CQS-40
Ongoing Activity
Post ReviewP.P. - Executing Agency: 2017-1-MOCS -
Method: LCS (Least Cost Selection)
NIRTTP-MOCS-93-SBMC-CF-
NIRTTP/PCO/NITDB/S/LCS-25
Ongoing Activity
Post Review
NIRTTP-MOCS-119-SBMC-CF-
NIRTTP/PCO/DOTM/S/LCS-26Contract under execution
Post ReviewMethod: QCBS (Quality and Cost Based
NIRTTP-MOCS-45-SBCC-CF-
NIRTTP/PCO/DOTM/S/QCBS-5
Activity Cancelled
Prior Review
NIRTTP-MOCS-46-SBCC-CF-
NIRTTP/PCO/DOTM/S/QCBS-6Activity Cancelled
Prior Review
NIRTTP-MOCS-47-SBCC-CF-
NIRTTP/PCO/DOC/S/QCBS-9
Contract under execution
Prior Review
NIRTTP-MOCS-56-SBCC-CF-
NIRTTP/PCO/NITB/S/QCBS-17Contract under execution
Prior Review
NIRTTP-MOCS-70-SBCC-CF-
NIRTTP/PCO/DOTM/S/QCBS-18
Consulting Services for a study on Prospect
of Concluding Free Trade Agreement (FTA)
between Nepal and People's Republic of
China
Bagmati Zone
Consulting Services for Study of Review of
Transit and Rail Service Agreement of Nepal
Bagmati Zone
Selection of firm for preparing Master Plan
and Detailed Design/Drawing of
Referral/SPS and Regional Plant Protection
Laboratory including Supervision of
Constriction Works
Bagmati Zone
Consulting Servieces to support DOTM for
bus routes, vehicle standard survey and for
preparing standard criteria for route
permits
Bagmati Zone
Kolkata-Kathmandu Corridor Monitoring,
Border Crossing Study
Bagmati Zone
Consulting Services to Support DOTM for
implementation of axle load control
measures/policies (National)
Bagmati Zone
Selection of Project
Implementation/Supervision Consultant for
NITDB (Birgunj and Bhairahawa ICD
Improvement works)
Bagmati Zone
Selection of Firm for Nepal National Single
Window and Trade Portal
Implementation"Quality Assurance and
Advisory Services(including Bid document
prepartion)(International)
Bagmati Zone
Consulting Servieces to support DOTM for
implementation of road safety
measures/policies from the transport
regulation perspective (National)
Bagmati Zone
"Consulting Services for Road Transport
Safety and Axle Load Control Study in
Nepal"
Bagmati Zone
Contract Completed
Post Review
NIRTTP-MOCS-72-SBCC-CF-
NIRTTP/PCO/NITDB/S/QCBS-22
Activity Cancelled
Post Review
NIRTTP-MOCS-88-SBCC-CF-
NIRTTP/PCO/NITDB/S/QCBS-23
Re-bidding/Second round
Post Review
NIRTTP-MOCS-91-SBCC-CF-
NIRTTP/PCO/NITDB/S/QCBS-24
Contract under execution
Post Review
NIRTTP-MOCS-130-SBCC-CF-
NIRTTP/PCO/TEPC/S/QCBS-39
Ongoing Activity
Prior Review
NIRTTP-MOCS-138-SBCC-CF-
NIRTTP/PCO/NITDB/S/QCBS-46
Expected
Post Review
NIRTTP-MOCS-140-SBCC-CF-
NITDB/PCO/PPD/S/QCBS-45
Expected
Post Review
Survey and Detailed Design Weigh Bridge
Stations
NIRTTP-MOCS-150-SBCC-CF-
NIRTTP/PCO/DOTM/S/CQS-48
along Birgunj-Kathmandu Corridor Expected
Post ReviewMethod: CQS (Selection based on
NIRTTP-MOCS-71-SCC-CF-
NIRTTP/PCO/NITDB/S/CQS-21
Contract under execution
Post Review
Feasibility Study for FTA with a Country
considering long term trade benefit to
Nepal
NIRTTP-MOCS-158-SCC-CF-
NIRTTP/PCO/S/CQS-52
Consulting Firm Expected
Post Review
Preparation of Mid-term and Long-term
Strategy Plan for Trade sector including
infrastructure
NIRTTP-MOCS-159-SCC-CF-
NIRTTP/PCO/S/CQS-53
Consulting Firm Expected
"Consulting Services for Road Transport
Safety and Axle Load Control Study in
Nepal"
Bagmati Zone
Survey Environmental Study and Detailed
Design for Kathmandu CFS/ICD
Bagmati Zone
Design and Construction Supervision of
Railway Tracks Modification at BirgunjICD
Bagmati Zone
Topographical Survey of Proposed Site for
Kathmandu CFS/ICD
Bagmati Zone
Selection of Firm for Development and
Implementation of the Nepal Trade
Information Portal
Bagmati Zone
Consulting Services for Pest Surveillance in
six major crops and Pest Detection Survey
in three major medicinal Herbs
Bagmati Zone
Detailed Design Review and Supervision
Consultant for Construction of ICD,
Kathmandu
Bagmati Zone
Bagmati Zone
Data Capture Framework For Kolkata-
Kathmandu Corridor Monitoring
Bagmati Zone
Bagmati Zone
Bagmati Zone
Post Review
Category Consultants - Individuals: Activities ShowHide
Description Reference # Province/State
P.P. - Executing Agency: 2017-1-MOCS -
Method: 3CV (3CV)
Selection of Technical Adviser to DoTM
(National)
NIRTTP-MOCS-43-3CV-CI-
NIRTTP/PCO/DOTM/S/IND-3
For the Entire Project Period Contract Completed
Post Review
NIRTTP-MOCS-48-3CV-CI-
NIRTTP/PCO/DOC/S/IND-8
Activity Cancelled
Post Review
NIRTTP-MOCS-54-3CV-CI-
NIRTTP/PCO/S/IND-15
Expected
Post Review
Selection of Technical Adviser for DoTM
(National)
NIRTTP-MOCS-98-3CV-CI-
NIRTTP/PCO/DOTM/S/IND-29
For the Entire Project Period Contract under execution
Prior ReviewMethod: IND (Individual Consultants - IND)
NIRTTP-MOCS-41-IND-CI-
NIRTTP/PCO/S/IND-1
Contract Completed
Post Review
NIRTTP-MOCS-42-IND-CI-
NIRTTP/PCO/S/IND-2
Contract Completed
Post Review
Selection of Project Assistant for DOTM
(National)
NIRTTP-MOCS-44-IND-CI-
NIRTTP/PCO/DOTM/IND-4
For the Entire Project Period Contract under execution
Post Review
NIRTTP-MOCS-49-IND-CI-
NIRTTP/PCO/S/IND-10
Contract Completed
Post Review
NIRTTP-MOCS-50-IND-CI-
NIRTTP/PCO/S/IND-11
Contract Completed
Prior Review
Bagmati Zone
Bagmati Zone
Selection of Trade Facilitation and Logistics
Adviser (National)
Bagmati Zone
Bagmati Zone
Selection of Finance Specialist/Consultant Bagmati Zone
Selection of International ICT Adviser
(Procurement) for Trade Portal and Nepal
National Single Window
Bagmati Zone
Selection of full time Procurement
Specialist/Consultant
Bagmati Zone
Selection of Technical Adviser/Project
Manager for PCO
Bagmati Zone
Bagmati Zone
Selection of Non Tariff Measures (NTM)
Tracking System Analyst (National)
Bagmati Zone
NIRTTP-MOCS-51-IND-CI-
NIRTTP/PCO/S/IND-12
Activity Cancelled
Prior Review
NIRTTP-MOCS-52-IND-CI-
NIRTTP/PCO/S/IND-13
Contract under execution
Post Review
NIRTTP-MOCS-53-IND-CI-
NIRTTP/PCO/S/IND-14
Contract under execution
Post Review
NIRTTP-MOCS-55-IND-CI-
NIRTTP/PCO/NITDB/S/IND-16
Contract Completed
Post Review
NIRTTP-MOCS-57-IND-CI-
NIRTTP/PCO/NITDB/S/IND-18
Expected
Post Review
NIRTTP-MOCS-66-IND-CI-
NIRTTP/PCO/S/IND-19
Contract Completed
Prior Review
NIRTTP-MOCS-67-IND-CI-
NIRTTP/PCO/S/IND-20
Activity Cancelled
Post Review
NIRTTP-MOCS-94-IND-CI-
NIRTTP/PCO/DOC/S/IND-26
Expected
Prior Review
Selection of full time Procurement
Specialist/Consultant
NIRTTP-MOCS-95-IND-CI-
NIRTTP/PCO/S/IND-27
For Entire Period of the Project Contract Completed
Prior Review
Selection of Technical Adviser for NITDB NIRTTP-MOCS-97-IND-CI-
NIRTTP/PCO/S/IND-28
For Entire Period of the Project Contract under execution
Prior Review
Selection of Trade Facilitation Adviser
(National)
NIRTTP-MOCS-100-IND-CI-
NIRTTP/PCO/S/IND-30
For entire Period of the Project Contract under execution
Prior Review
Selection of Technical Adviser for NITDB Bagmati Zone
Selection of Social Safeguards Specialist
(Intermittent)
Bagmati Zone
Selection of Environmental Safeguards
Specialist (Intermittent)
Bagmati Zone
Selection of Procurement
Specialis/Consultant (Intermittent)
Bagmati Zone
Selection of Legal Adviser for Dept. of
Customs for advice on the proposed Single
Window System
Bagmati Zone
Selection of Technical Adviser for Trade
related Laboratory
Bagmati Zone
Selection of Expert for Study on
Transshipment
Bagmati Zone
Selection of Engineering Support to NITDB Bagmati Zone
Bagmati Zone
Bagmati Zone
Bagmati Zone
Selection of Trade Development Adviser for
PCO
NIRTTP-MOCS-101-IND-CI-
NIRTTP/PCO/S/IND-31
For entire Project Period Contract under execution
Prior Review
Selection of Chemical Laboratory Specialist NIRTTP-MOCS-102-IND-CI-
NIRTTP/PCO/DoC/S/IND-32
, Intermittent Contract Completed
Post Review
Selection of Sanitary and Phyto-Sanitary
Laboratory Specialist
NIRTTP-MOCS-103-IND-CI-
NIRTTP/PCO/MOAD/S/IND-33
International Consultant (Intermittent) Contract Completed
Post Review
NIRTTP-MOCS-108-IND-CI-
NIRTTP/PCO/S/IND-34
Expected
Post Review
Selection of Expert for updating National
Phyto-Sanitary System of Nepal
NIRTTP-MOCS-141-IND-CI-
NIRTTP/PCO/PPD/S/IND-44
International Consultant (Intermittent) Expected
Post Review
Selection of Expert for Plant Health
Management study based on Traditional
Transborder Trade
NIRTTP-MOCS-142-IND-CI-
NIRTTP/PCO/PPD/S/IND-43
National Consultant (Intermittent) Expected
Post Review
NIRTTP-MOCS-151-IND-CI-
NIRTTP/PCO/S/IND-49
Expected
Post Review
Selection of Consultant for study on
Improvement of Nepal-India Trading
Regime
NIRTTP-MOCS-156-IND-CI-
NIRTTP/PCO/S/IND-50
Individual Consultant Expected
Post Review
Selection of Consultant for study on
Requirements of Additional Facility in
Birgunj Integrated Check Point (ICP)
NIRTTP-MOCS-157-IND-CI-
NIRTTP/PCO/S/IND-51
Individual Consultant Expected
Post Review
Bagmati Zone
Bagmati Zone
Selection of MoCS Capacity Enhancement
Specialist (National)
Bagmati Zone
Bagmati Zone
Bagmati Zone
Bagmati Zone
Bagmati Zone
Selection of Non Tariff Measures (NTM)
Tracking System Analyst
Bagmati Zone
Bagmati Zone
Selection of an International Procurement
Specialist/Consultant (Intermittent)
NIRTTP-MOCS-160-IND-CI-
NIRTTP/PCO/DOC/S/IND-50
For contributions in the evaluations of NSW
Ist and IInd stage Bids
Expected
Prior Review
Selection of an International IT
Specialist/Consultant (Intermittent)
NIRTTP-MOCS-161-IND-CI-
NIRTTP/PCO/DOC/S/IND-51
For contributions in the evaluations of NSW
Ist and IInd stage Bids
Expected
Post Review
NIRTTP-MOCS-162-IND-CI-
NIRTTP/PCO/S/IND-52
Expected
Prior Review
NIRTTP-MOCS-163-IND-CI-
NIRTTP/PCO/S/IND-53
Expected
Prior Review
NIRTTP-MOCS-166-IND-CI-
NIRTTP/PCO/DOTM/S/IND-54
Expected
Post ReviewMethod: SSS (Selection based on a single
Selection of Transport Management
Consultant for DoTM
NIRTTP-MOCS-134-SSF-CI-
NIRTTP/PCO/DOTM/S/IND-41
for a period of two months Contract Completed
Post Review
NIRTTP-MOCS-135-SSF-CI-
NIRTTP/PCO/NITDB/S/SSS-42
Contract under execution
Post Review
Selection of Senior Procurement
Specialist/Consultant (Intermittent)
Bagmati Zone
Selection of full time Procurement
Adviser/Consultant
Bagmati Zone
Bagmati Zone
Bagmati Zone
Selection of Corridor Monitoring Consultant Bagmati Zone
Bagmati Zone
Selection of an International Consultant to
Support Establishment and Operation of
Vehicle Fitness Testing Center in Nepal
Bagmati Zone
29/11/13 01/01/14 17/02/14 11/03/14
New Activities
Modified Activities
Canceled Activities
Activities without Modification
N/A
No Objection Documents
Publication /
Invitation Bid Opening Evaluation of Bids
No Objection to
Evaluation Report
04/11/13 29/11/13 14/01/14 20/02/14 12/03/14
15/09/14 16/10/14 21/10/14 N/A
15/09/15 N/A
21/01/16
N/A 28/05/15 14/08/15
N/A 05/12/15 N/A
N/A 27/02/17 29/03/17 30/03/17 N/A
24/01/16 23/02/16 10/03/16 N/A
14/12/15 N/A
N/A 18/03/15 20/05/15 30/06/15 N/A
No Objection Documents Publication / Bid Opening Evaluation of Bids No Objection to
14/12/13 29/12/13 07/01/14
23/07/15 24/08/15 04/09/15 15/06/15 22/06/15
N/A 09/02/15 26/03/15
07/03/17 10/03/17 27/04/17 05/05/17 15/05/17
22/06/16 23/07/16 24/08/16 N/A
07/04/15 N/A
N/A
13/01/14 23/01/14 N/A N/A 14/12/13
22/07/16 23/07/16 N/A N/A 22/06/16
23/06/15 22/07/15 N/A N/A 07/05/15
04/04/17 10/04/17 N/A
10/04/17 N/A
03/03/17 05/03/17
03/03/17 05/03/17 04/04/17
22/05/14 06/06/14 16/06/14
22/05/14 06/06/14 20/06/14
22/05/14 06/06/14 20/06/14
22/05/14 06/06/14 17/06/14
04/04/17 10/04/17 N/A 03/03/17 05/03/17
N/A 01/12/13 N/A
N/A 26/11/13 N/A 18/12/13 N/A
N/A N/A N/A N/A N/A
02/12/13 N/A 20/12/13 N/A
18/12/13 N/A
N/A
N/A N/A
N/A N/A
N/A
N/A N/A N/A
N/A N/A N/A N/A
N/A N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A 21/08/14 N/A 28/08/14 N/A
05/10/15 N/A 07/10/15 N/A
N/A 19/05/15 N/A 27/05/15
N/A 21/08/14 N/A
N/A 21/08/14 N/A 28/08/14 N/A
N/A N/A N/A N/A N/A
11/10/15 N/A 17/10/15 N/A
28/08/14 N/A
N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A
N/A
N/A N/A N/A
07/10/15 N/A
N/A
N/A 05/10/15 N/A
18/10/15 N/A
N/A
N/A 11/10/15 N/A
N/A 05/10/15 N/A 12/10/15 N/A
22/11/15 N/A 28/11/15 N/A
11/10/15 N/A 18/10/15 N/A
N/A
N/A 22/11/15 N/A
22/02/16 24/02/16 10/03/16 17/03/16 N/A
11/10/15 N/A 18/10/15 N/A
N/A 22/11/16 N/A 28/11/16 N/A
16/07/16 23/07/16 24/07/16 N/A
28/11/15 N/A
N/A
N/A 02/12/16 09/12/16 14/12/16 N/A
26/11/16 N/A 18/12/16 N/A
18/12/16 N/A
N/A
N/A 01/12/16 N/A
N/A N/A 06/01/17 12/01/17 15/01/17
No Objection Documents Publication / Bid Opening Evaluation of Bids No Objection to
N/A N/A N/A N/A N/A
21/11/14 08/12/14 21/01/15
Method: ICB (International Competitive Bidding)
21/05/14 29/05/14 28/07/14 15/10/14 N/A
N/A N/A
12/03/15 02/04/15
N/A N/A N/A N/A N/A
N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A 13/02/14 N/A
N/A N/A N/A N/A N/A
N/A 10/02/16
10/02/16 21/02/16 N/A N/A 11/01/16
N/A N/A
14/03/16 31/03/16 N/A
N/A 02/10/15 N/A
N/A N/A N/A N/A N/A
N/A N/A N/A 15/05/15 N/A
N/A N/A N/A
N/A N/A N/A N/A N/A
N/A 15/05/15
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A 01/12/14 17/11/14 21/11/14
N/A N/A 11/12/14 25/11/14 26/11/14
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
10/07/14 N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A 26/11/15 27/12/15 05/01/16 N/A
N/A N/A N/A N/A
N/A N/A
N/A
N/A N/A N/A
N/A N/A N/A 16/09/14 N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A 12/10/15 N/A
17/11/16 18/11/16 N/A
15/06/16 N/A
N/A 10/11/16
N/A 05/11/16
N/A 07/06/16 14/06/16
N/A 30/11/15 N/A
15/12/16 N/A N/A 05/12/16 12/12/16
12/11/16 13/11/16 N/A
N/A 24/11/15
N/A N/A N/A N/A N/A
Request for Proposal No Objection to Invitation for RFP Bid Opening Technical
15/12/16 N/A N/A 05/12/16 12/12/16
11/11/15 12/11/15 27/12/15 15/01/16 25/01/16
N/A N/A N/A N/A N/A
24/12/16 N/A
24/04/16 N/A 25/04/16
25/04/16 25/05/16 30/05/16 24/04/16 N/A
12/01/17 18/02/17 01/03/17
25/05/16 30/05/16
02/05/16 N/A 05/05/16 03/06/16 19/06/16
21/11/14 26/11/14 28/11/14 16/01/15 22/02/15
04/03/14 07/03/14 07/03/14 07/04/14 02/05/14
10/04/16 N/A 11/04/16 18/04/16
18/04/16 18/04/16 10/04/16 N/A 11/04/16
31/05/16 N/A 01/06/16 01/07/16 05/07/16
18/04/16
24/12/15 N/A 12/01/16 18/02/16 01/03/16
02/05/15 18/03/15 N/A 19/03/15 20/04/15
24/04/14 16/05/14 02/06/14 18/07/14 12/08/14
30/01/14 21/02/14 28/02/14 15/04/14
05/10/14 20/10/14 25/08/14 02/09/14 05/09/14
02/06/14 18/07/14 12/08/14 24/04/14 16/05/14
30/05/14 N/A 02/07/14 19/08/14 30/08/14
15/05/14
27/06/14 N/A 06/07/14 19/08/14 22/09/14
13/02/15 N/A 18/03/15 20/04/15
N/A 02/10/15 22/12/15
31/08/14 N/A 15/09/14 21/09/14 22/10/14
30/05/14 N/A 02/07/14 19/08/14 30/08/14
17/02/15 N/A 26/02/15 29/03/15
10/12/15 24/12/15 02/11/15 N/A 06/11/15
18/04/15 18/05/15 02/06/15 15/04/15 N/A
14/07/16 14/07/16 14/07/16 14/07/16 21/07/16
15/04/15
25/11/16 N/A 27/11/16
12/12/16 16/01/17 31/01/17 05/12/16 N/A
18/04/17 N/A 19/04/17 18/05/17 25/05/17
26/12/16 10/01/17
18/11/16 N/A 19/11/16
18/07/14 N/A 19/07/14 18/08/14 19/08/14
18/11/16 N/A 19/11/16 18/12/16 25/12/16
18/12/16 25/12/16
No Objection to the TOR
Contract
Signature Date Total days of Process End Date of Activity Comment
Add Comment
24/02/14 23/02/15
Add Comment
Add Comment
Add Comment
01/01/16
Add Comment
28/08/14 27/08/15
Add Comment
26/04/16 15/07/16
Add Comment
16/06/14
Add Comment
18/08/14 31/08/15
Add Comment
12/02/14 18/02/14 16/07/15
N/A N/A 16/07/18
31/12/19
N/A 17/08/14 16/08/15
15/04/15 05/11/15
20/08/15
N/A 15/11/15 31/12/19
N/A 21/08/14
17/08/15
11/11/13 N/A 15/07/14
N/A 18/08/14
31/12/19
N/A N/A 16/07/18
01/07/15 02/11/15
Add Comment
Add Comment
21/01/16 26/04/16
Add Comment
25/07/16
Add Comment
13/02/14 16/07/15
Add Comment
Add Comment
30/04/14 04/07/14 31/05/15
Add Comment
Add Comment
Add Comment
01/06/15 17/09/15 14/01/17
Add Comment
09/12/15
Add Comment
01/06/15 23/09/15
31/12/19
N/A N/A 15/07/14
12/10/15 15/11/15
15/07/14
14/10/15 15/11/15 31/12/19
10/11/13 N/A
15/12/14
21/10/15 30/11/15 30/06/19
N/A 12/10/14
31/12/19
31/03/14 31/03/14 03/01/15
02/11/15 04/12/15
31/12/19 15/04/15 30/06/15
30/06/19
15/04/15 05/11/15 31/12/19
15/04/15 05/06/15
Add Comment
01/06/15 14/09/15
Add Comment
15/12/15 31/03/16
Add Comment
20/12/15 31/05/16
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
15/04/15 30/06/15 31/12/19
31/12/19
N/A 12/12/16 12/12/16
N/A 30/10/15
05/07/15
01/07/15 30/10/15 25/04/16
08/04/15 15/05/15
04/12/16
10/11/16 04/12/16 04/12/16
10/11/16 04/12/16
12/12/16
11/11/16 15/12/16 30/06/19
N/A 12/12/16
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
25/04/16 31/05/16 15/08/16
Add Comment
06/10/16 07/10/16
31/12/19
27/12/16 31/01/17 30/06/19
27/12/16 18/01/17
15/07/17
N/A 16/01/17 15/07/17
10/12/16 16/01/17
31/08/16 05/06/16 10/06/16
10/07/17
18/05/16 25/05/16 24/07/16
11/01/17 10/02/17
Total days of Process
(between Bid Opening and Contract
Signature Date)
Add Comment
Add Comment
22/04/14 111
Add Comment
Add Comment
Add Comment
Add Comment
04/07/16 15/07/16
Comment
14/11/15 15/11/14 30
Contract
Signature Date
End of Contract
(Completed)
15/10/15 62 13/10/17
25/03/14 70 21/10/15
17 15/07/18
24/03/17
15/04/17
25/03/16 31
14/12/15 25/04/16
Add Comment
Add Comment
Add Comment
15/09/15 118
Add Comment
Contract Total days of Process End of Contract Comment
(between Bid Opening and Contract
Signature Date)
Add Comment
14/01/14 16 30/05/14
Add Comment
Add Comment
Add Comment
17/09/15 56 16/03/17
31/05/17 34 30/05/19
16/03/18 17/09/16 56
30/04/15 35 29/04/16
30/01/14 17 20/02/14
31/07/16 9 31/08/16
22/07/15 29 09/09/16
27/04/17 23 26/06/17
27/04/17 23 26/06/17
Add Comment
Add Comment
18/06/14 12 08/07/14
Add Comment
24/06/14 18 08/07/14
Add Comment
23/06/14 17 04/07/14
Add Comment
20/06/14 14 04/07/14
Add Comment
01/06/14 13/07/14
Add Comment
04/06/14 13/07/14
Add Comment
Add Comment
12/06/14 12/07/14
Add Comment
23/05/16 15/07/16
27/04/17 23 26/06/17
23/12/13 15/07/14
N/A 15/07/14
15/07/14 25/12/13
23/12/13 15/07/14
N/A 16/07/18
N/A 18/07/18
N/A 16/07/18
N/A 16/07/18
07/09/14 21/10/14
16/11/15 14/10/15
Add Comment
Add Comment
Add Comment
02/07/15
Add Comment
30/11/14
Add Comment
Add Comment
Add Comment
27/05/15 24/06/15
Add Comment
Add Comment
01/06/16 15/07/16
Add Comment
Add Comment
23/05/16 15/07/16
07/09/14 21/10/14
10/10/14 16/11/14
19/10/15 19/10/15
07/09/14 21/10/14
15/07/15 N/A
10/10/14 16/11/14
07/10/15 07/10/15
10/04/15 30/04/15
14/10/15 05/11/15
20/10/15 20/10/15
31/12/15 30/11/15
20/10/15 20/10/15
Add Comment
Add Comment
14/06/16 14/10/16
Add Comment
17/06/16 15/07/16
Add Comment
Estimated
Amount Update
($11200.00)
and/or method
(Shopping)
01/01/2017
05:59
Add Comment
Add Comment
Add Comment
Add Comment
Update Internal
ID
(NIRTTP/PCO/G/S
HP-35)
05/01/2017
09:26
Add Comment
05/04/16 26 18/05/16
30/11/16 31/12/16
20/10/15 20/10/15
25/08/16 25/07/16 2
30/11/15 31/12/15
15/07/17 23/12/16
23/12/16 15/06/17
22/01/17 10 21/02/17
21/12/16 12 11/07/17
Add Comment
Add Comment
Add Comment
Contract Total days of Process End of Contract Comment
(between Bid Opening and Contract
Signature Date)
Add Comment
25/11/13 01/09/15
Add Comment
21/09/16 20/10/16
N/A 11/09/17
Method: ICB (International Competitive Bidding)
12/05/15 111 11/09/17
N/A 15/07/15
N/A 15/07/14
N/A 15/07/14
Add Comment
25/11/13 01/09/15
Add Comment
Add Comment
Add Comment
01/07/14 01/09/15
Add Comment
25/11/13 01/09/15
Add Comment
01/06/14 01/09/15
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
N/A 15/07/15
N/A 15/07/14
N/A 15/07/14
N/A 15/07/15
N/A 15/07/14
N/A 15/07/14
N/A N/A
N/A 15/07/15
04/03/16 23 30/12/16
31/10/15 31/12/19
25/04/16 42 24/04/17
Add Comment
Add Comment
Add Comment
Add Comment
01/07/14 12/07/14
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
28/06/15 30/06/19
28/06/15 30/06/19
N/A N/A
N/A N/A
N/A 15/07/14
10/12/14 15/02/15
21/12/14 13/02/15
N/A 16/07/18
N/A N/A
N/A 15/07/14
N/A 15/07/14
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
N/A 22/07/14
Add Comment
Add Comment
Add Comment
Add Comment
28/01/14 24/03/14
N/A 15/07/14
N/A 15/07/14
N/A 15/07/14
N/A 15/07/14
N/A 15/07/14
14/05/14 N/A
N/A 16/07/18
N/A 16/07/18
N/A 16/07/18
20/01/16 24 15/07/16
N/A 15/07/14
Add Comment
Add Comment
Add Comment
Add Comment
17/06/16 15/07/16
Add Comment
27/07/16
Add Comment
12/10/14 15/07/15
31/10/15 31/12/19
19/11/16 2 05/07/17
21/06/16 7 15/08/16
02/12/15 31/12/15
21/12/16 9 21/12/16
14/11/16 2 14/11/16
Add Comment
Add Comment
12/07/16
Add Comment
No Objection to Final Evaluation and Negotiation No Objection to
21/12/16 9 21/12/16
15/07/16 15/07/17
Contract
Signature Date
05/02/16 40 04/02/18
15/06/16 N/A 10/06/16 N/A
31/03/17 N/A 10/03/17 N/A
N/A 10/06/16 N/A 15/06/16
N/A 04/07/16 N/A 05/07/16
18/03/15 18/03/15 10/06/15 18/06/15
15/05/14 26/06/14 07/07/14 07/07/14
N/A 27/04/16 N/A 05/05/16
N/A 10/07/16 N/A 31/07/16
N/A 27/04/16 N/A 05/05/16
N/A 15/05/15 N/A 30/05/15
28/08/14 10/09/14 24/09/14 09/10/14
N/A 10/03/16 N/A 31/03/16
27/10/14 02/11/14 09/11/14 30/11/14
10/10/14 28/08/14 10/09/14 24/09/14
N/A 02/09/14 N/A 17/09/14
30/05/14 21/06/14 07/07/14 14/07/14
N/A 17/11/14 N/A 21/11/14
N/A N/A
N/A 12/02/16 N/A 24/02/16
N/A N/A N/A
N/A 02/09/14 N/A 17/09/14
N/A 15/01/16 N/A 05/02/16
25/06/15 N/A 05/06/15 N/A
25/07/16 15/08/16 19/08/16 30/08/16
N/A 30/04/15 N/A 20/05/15
21/02/17 N/A 14/02/17 N/A
N/A 30/05/17 N/A 02/06/17
N/A 10/01/17 N/A 12/02/17
N/A 20/08/14 N/A 21/08/14
N/A 30/12/16 N/A 02/01/17
N/A 30/12/16 N/A 02/01/17
Method: ICB (International Competitive Bidding)
Total days of Process Comment
(between Bid Opening and
Contract Signature Date)
Add Comment
Activity Cancelled
05/01/2017 Add Comment
Activity Cancelled
05/01/2017
09:48
Add Comment
End of Contract
(Completed)
21 30/09/16
41 30/06/17
21 30/09/16
Activity Cancelled
05/01/2017
09:48
Add Comment
Activity Cancelled
05/01/2017 Add Comment
Add Comment
Add Comment
Add Comment
32
Add Comment
Add Comment
Add Comment
153
Add Comment
91
17 15/07/16
30 31/12/17
15/07/16 17
30/11/15 40
83 09/03/15
42 15/07/16
56 30/11/17
84 09/03/15
29 16/04/15
07/01/16 90
Add Comment
94 20/06/15
Add Comment
Add Comment
Add Comment
145
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
Add Comment
29 16/04/15
57 05/02/17
38 24/10/15
47 31/05/19
19/05/16 52
36 30/06/19
15 01/12/17
48 12/07/17
3 20/10/15
15 01/07/17
15 01/07/17