catalog - june 2015 en · 2018. 3. 14. · pjsc, passavant roediger srl, baneasa developments srl,...
TRANSCRIPT
Projects brochure
w w w . a y k a . r o
AYKA Construction S.R.L. has gained a strong reputation in theconstruction field. Intelligence, client focus, quality and trust are the attributesthat characterize our staff. To us, they are the basis of a successful and long termpartnership with our clients.
range of civil and industrial projects demonstrates our skill in this highly specialized field. Some of the nation's leading companies call on our professional team to meet their civil and industrial construction needs.
AYKA Construction's extensive experience as a contractor on a wide
AYKA brings quality and efficiency to every office building project. In today's competitive environment, we know that effective cost control and early occupancy are essential.
Our partners are very important companies as: Drake & Scull International PJSC, Passavant Roediger SRL, Baneasa Developments SRL, Garanti Bank, Unicredit Tiriac Bank, Anchor Group, Bahbahan Group RO, Credit Europe Bank, Rosetti Tower Invest SRL, Barter Trading, Arctic SA, Global Finance SA, Blue House Imobiliare, EMCT Romania SRL, and they all recommend us as a serious and professional company.
Company profile
AYKA Construction’s goal on each and every project is simple - we want to not only meet, but to exceed our client's expectations of a general contractor. We want and need every client to be a very satisfied customer that willingly speaks in a positive manner on behalf of our firm. The essence of our business is establishing long-term relationships by first understanding the needs and expectations of our clients and then performing above and beyond those expectations.
Gorky Gorod ParkKrasnaya Polyana, Sochi, Russia Turn key project
General contractor
Time period
Total Construction
Ayka Construction
2012-2013
45.000 m²
Gorky Gorod is a resort complex, located in Krasnaya Polyana, Sochi region, in a mountain region.
Thanks to Olympic investments, the region is developing very fast, given the fact that in 2014 will be used as Olympic Media Village.
Our company will deliver, as a turn-key project, two hotels, one fire station, and two parking areas, everything built, and finished, at highest standards.
Fire Station
Parking
Hotel 6 - Render, execution and final product
Hotel 5 - Render, execution and final product
Fire station - Render, execution and final product
Parking - 960m - Render, execution and final product
Gorky Gorod ParkKrasnaya Polyana, Sochi, Russia Turn key project
Sun Plaza is the first hypermarket-anchored shopping mall in Romania, building of 4 levels, totalizing 215.000m² construction areas, Sun Plaza will be an “All Inclusive” shopping center, an oasis for shopping andrelaxation, with green areas especially designed for lounge. The mall is anchored by a Cora hypermarket,Baumax DIY store, Mobexpert furniture store and Multiplex cinemas, while also offering an exciting two level shopping with 155 shops and an extensive choice of restaurants and leisure activities with 4 entertainmentareas. The commercial mix is carefully established to allow an optimal mix of shops, restaurants andentertainment units, open parking space for 206 cars, closed space for 1915 cars. The project is invested byImmobilien AG Sparkassen Immobilien Erste Group.
Sun PlazaBucharest, Romania Turn key project
Client
Time period
Total Construction
EMCT Romania - SDCS Romania
2007-2010
215.000 m²
Sun PlazaBucharest, Romania Turn key project
Construction of a steel structure of an office building in Cotroceni within the Plaza Romania Shopping Center.
The building consists of 14 floors with total closed area of 33.000 m².
The works consist of steel structure,composite floors and mechanic & electric works.
Anchor BuildingBucharest, Romania Turn key project
Client
Time period
Total Construction
Anchor Group SA
2004-2006
33.000 m²
Anchor BuildingBucharest, Romania Turn key project
The project comprises of a Class A office building space in the central area of Bucharest.
The total internal floor area excluding delivery area and entrance to car park is 13.000 m² consisting of 3 basements ( car park ),ground floor, mezzanine level, 9 above ground office floors and one technical floor.
The project is an investement of Bluehouse S.R.L and the project manager was Gleeds Romania.
Victoria CenterBucharest, Romania Turn key project
Client
Time period
Total Construction
Victoria Limited
2008-2009
13.000 m²
Victoria CenterBucharest, Romania Turn key project
Turn-key construction of UTI Invest building in the downtown Bucharest.
The building consists of 3 basements, ground floor and 8 upper floors i.e. it`s 12 storey building.
It`s a reinforced concrete structure with total closedarea of 11.000 m².
The footprint of the building is 1.100 m².
Uti HeadquartersBucharest, Romania Turn key project
Client
Time period
Total Construction
Uti Invest
2007-2008
11.000 m²
Uti HeadquartersBucharest, Romania Turn key project
Turn-key construction of Rosetti Tower building in the downtown Bucharest.
The building consists of 2 basements, ground floor and 9 upper floors i.e. it`s 9 storey building.
It`s a reinforced concrete structure with total closedarea of 17.500 m².
The footprint of the building is 1.300 m².
Rosetti TowerBucharest, Romania Turn key project
Client
Time period
Total Construction
Alin Niculae
2007-2008
17.500 m²
Rosetti TowerBucharest, Romania Turn key project
Villas ComplexIrak Concept
Client
Time period
Total Construction
Irakian Customer
2012-2014
417.500 m² - 1074 units (258 sqm / unit)
Villas ComplexIrak Concept
Tineretului Park ResidenceBucharest, Romania Turn key project
General Contractor
Time period
Total Construction
Ayka Construction
2011-2012
1.800 m²
Turn-key construction of Tineretului Park Residence in the downtown Bucharest.
The building consists of 1 basement, ground floor and 4 upper floors.
It`s a reinforced concrete structure with total closedarea of 1.800 m².
Tineretului Park ResidenceBucharest, Romania Turn key project
Ferdinand ResidenceBucharest, Romania Turn key project
Client
Time period
Total Construction
Hussain Maitham
2011-2012
17.000 m²
Turn-key construction of Ferdinand Residence in the downtown Bucharest.
The building consists of 1 basement, ground floor and 8 upper floors.
It`s a reinforced concrete structure with total closedarea of 17.000 m².
Ferdinand ResidenceBucharest, Romania Turn key project
Diamond ResidenceVoluntari, near Bucharest, Romania Turn key project
Client
Time period
Total Construction
MERT
2012-2013
12.000 m²
Turn-key construction of Diamond Residence in the Voluntari, near Bucharest.
The building consists in two building and one pool, with one underground parking area, ground floor and 7 upper floors.
It`s a reinforced concrete structure with total closedarea of 12.000 m².
Diamond ResidenceVoluntari, near Bucharest, Romania Turn key project
Rose ResidenceVoluntari, near Bucharest, Romania Turn key project
Client
Time period
Total Construction
Ayka Construction
2012-2013
6.000 m²
Turn-key construction of Rose Residence in the Voluntari, near Bucharest.
The building consists in one underground parking area, ground floor and 6 upper floors.
It`s a reinforced concrete structure with total closedarea of 6.000 m².
Rose ResidenceVoluntari, near Bucharest, Romania Turn key project
My Dream ResidenceVoluntari, near Bucharest, Romania Turn key project
Client
Time period
Total Construction
Plus Development
2006-2008
44.000 m²
Turn-key construction of 188 residence apartments located in Pipera.
The project consists of 3 buildings each 10 storey, closed car park, open and closed swimming pools, and a fitness center.
Total closed area is 44.000 m².
My Dream ResidenceVoluntari, near Bucharest, Romania Turn key project
Global ResidenceVoluntari, near Bucharest, Romania Turn key project
Client
Time period
Total Construction
European Property (Global Finance)
2008 - present status: suspended
72.000 m²
Turn-key construction of residence apartments located in Pipera.
The project consists of 4 buildings each 8 storey, closed car park, open and closed swimming pools, and a fitness center.
Total closed area is 72.000 m².
Global ResidenceVoluntari, near Bucharest, Romania Turn key project
Wastewater treatment plantBraila, Romania Turn key project
General Contractor
Time period
Total Construction
PASSAVANT ROEDIGER
2010-2011
1.500 m² / 27.000 m
Turn-key construction of one waste treatment plant, in Braila, Romania.
The project consists of pupming station, undercrossing a railway, and pipes for waste water.
Total area is 1.500 m² for constructions, and 27.000 of pipes and connections.
Wastewater treatment plantBraila, Romania Turn key project
GRP Pipes Mounting
Lake filling
Wastewater treatment plantBraila, Romania Turn key project
Railway works
Pipejacking - road undercrossing
Concrete Piles
Pumping station and Treatment plant - structure works
Wastewater treatment plantBraila, Romania Turn key project
Outfalls
Concrete pipes mounting
Landscaping
Wastewater treatment plantSibiu, Romania Turn key project
General Contractor
Time period
Total Construction
PASSAVANT ROEDIGER
2013-2014
4.500 m² / 2.700 m
Rehabilitation of waste treatment plant, inSibiu, Romania.
The project consists in new buildings andretention ponds, rehabilitation of old buildingsand pumping stations...
Total area is 4200 m² for constructions, and2.700 of pipes and connections.
Wastewater treatment plantSibiu, Romania Turn key project
A3 Highwaynear Cluj, Romania Turn key project
General Contractor
Time period
Total Construction
BECHTEL INTERNATIONAL INC.
2010
11 km
On the A3 project, we build bridge pillars and the path for approximately 11 km (52 to 63 km)
A3 Highwaynear Cluj, Romania Turn key project
Mert SAAfumati, near Bucharest, Romania Turn key project
General Contractor
Time period
Total Construction
s.c. MERT s.a.
2007
36.000 m²
Turn-key construction of two office buildings and three warehouses, metal structure with isolated walls.
Total surface for buildings is approx. 26.000 sqm,plus approx. 10.000 sqm of landscaping...
Mert SAAfumati, near Bucharest, Romania Turn key project
Arctic SAGaesti, Romania Turn key project
Client
Time period
Total Construction
s.c. Arctic s.a.
2007
6.000 m²
Turn-key construction of two warehouses, metal structure with isolated walls.
Total surface for buildings is approx. 6.000 sqm...
Arctic SAGaesti, Romania Turn key project
America HouseBucharest, Romania Turn key project
General Contractor
Time period
Total Construction
GTC Real Estate Investment Romania
2004
55.000 m²
Construction of the reinforced concrete skeleton structure.
It is 13 storey building with 3 basements and with a footprint of 4.400 m².
Total closed area is 55.000 m².
America HouseBucharest, Romania Turn key project
Europe HouseBucharest, Romania Turn key project
General Contractor
Time period
Total Construction
GTC Real Estate Investment Romania
2002
22.000 m²
Construction of reinforced concrete skeleton structure, and interior and exterior finishes except the facade.
It`s a building with a total closed area of 22.000 m². The works has been done as a subcontractor.
Europe HouseBucharest, Romania Turn key project
Unicredit branchesBucharest, Romania Turn key project
General Contractor
Time period
Total Construction
Unicredit Bank Romania
2002 - 2008
22.000 m²
All over Romania ...
Unicredit branchesBucharest, Romania Turn key project
Certifications
Equipments
Equipments
Equipments
Equipments
Equipments
Diesel Pump
T
el. +40743.110.032
Ilfov, RomaniaBd. Pipera nr. 72, Voluntari
CONSTRCTION S.R.L.