Medipass in short
• Medipass supplies turnkey advanced solutions of design, development and management for complex medical equipment in outsourcing to hospitals and private/ public healthcare facilities
• Medipass’ major focus is on innovative technologies, including:
- Diagnostic Imaging (RX, CT, MRI) - Nuclear Medicine (Radiopharmacy,
PET/CT) - Radiotherapy (Photons, Protons)
• Founded in 1996, in 2006 Medipass has become part of KOS-CIR Group
• In 2011 Medipass has activated a process of international development in UK (Medipass Healthcare) India (Clearmedi)
RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK 2
Key activities
• Design of the layout and planning of the site that will host the service
• Acquisition of the technical equipment from primary manufacturers also as part of project financing initiatives
• Installation of the equipment, though this is performed by the supplier • Authorization and start-up of operation • Full-risk maintenance management • Life cycle management (i.e. periodical replacement / upgrade of medical
equipment) • Training of the client’s personnel
• Provision of specialized personnel (i.e. clinicians, radiopharm., physicists, …)
3 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
Medipass has gained relevant experience in the management of advanced technologies applied to healthcare across Italy for both private and public hospitals
Italian Experiences
PET-CT (5 diagnostic units)
Radiopharmacy & Cyclotron (3 units)
M.E.S.
MRI, CT start-up
Radiation Therapy
Radiation Therapy start up
Diagnostic Outpatient Imaging Center
Lithotripsy
Ongoing bids
4 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
Medipass’ managed services operate for
5 PET-CT Diagnostic Units
3 Radiopharmacy with cyclotron
with a total of 74 dedicated professionals involved:
8 Nuc. Med. Physicians
4 Physicists
14 Diagn. Technicians
15 Radiopharmacists
12 Chem. Technicians
1 Nuclear Engineer
12 Admin. and Support
9 Hub staff & Logistic
Medipass professional contributions - Nuclear Medicine in Italy
to give assistance to approximately 22.000 PET patients yearly
5 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
UK active contracts
6
St. James Institute (Leeds)
MES (9 Linac and diagnostic equipment)
Belfast City Hosp. (Belfast)
MES (9 Linac and diagnostic equipment)
6 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
Valentis, Meerut
Linac Jindal, Hisar
Linac
Muni Seva Ashram,
Vadodara 2 Linacs
Radiant, Mysore
Linac
Sushrut, Mumbai -
PET CT
Hamdard, New Delhi
MRI, CT, Diagnostic Imaging
Paras, Patna
Linac, PET CT, Brachy
Sanjiban, Kolkata
Linac, MRI
Birla, Gwalior
Linac
Synergy, Indore
MRI, CT
Suretech, Nagpur -
Linac
Nanded Medical, Nanded
Linac
Ashwin, Coimbatore
Linac
Mission, Durgapur
Linac
Guru, Madurai
Linac
India Presence
7 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
Azienda ULSS 8 – Asolo
is a public Local Health Unit directly managing two hospitals
in the north east of Italy - one settled in Castelfranco Veneto -
and other healthcare and social service outlets
Castelfranco Veneto Hospital
in 1996 was the first public hospital in Italy
to have a Radiopharmacy-cyclotron unit
directed by Prof. G. Ferlin, one of EANM founders
Azienda ULSS 8 Asolo and Castelfranco Veneto Hospital
REGIONE VENETO
8 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
In 2001
medipass signed a collaboration agreement with
Azienda ULSS 8 – Asolo
to distribute [F-18]fluoride produced by the RD-111
cyclotron installed in Castelfranco Veneto hospital
to other regional Nuclear Medicines
apporting production personnel and logistic coordination
REGIONE VENETO
Medipass agreements with Azienda ULSS 8 Asolo
9 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
REGIONE VENETO
In 2007
medipass signed a collaboration agreement with
Azienda ULSS 8 – Asolo
for the
design and development of a new
radiopharmacy-cyclotron unit
and a managed service from 2009 to 2021
Medipass agreements with Azienda ULSS 8 Asolo
10 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
… to the new GMP-compliance site
ECLIPSE RD : two F-18, two C-11, one N-13, one O-15 targets
13 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
- September - October 2009 : RD/RD October 2009 : 1st UPGRADE BL2 - November 2009 – May 2011 : RD/HP May 2011 : 2nd UPGRADE BL1 - June 2011 – up to now : HP/HP
CASTELFRANCO ECLIPSE CONFIGURATION HISTORY
13 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
- 2nd UPGRADE : in order to satisfy the [F-18]FDG requests from satellite hospitals (discontinuation of own FDG preparation due to a «GMP like» new legislation coming into operation in July 2011),
need to overcome
• F-18 RD target reliability (yields, endurance) • low FDG yields using the first F-18 RD run • Ion Source instability
REASONS OF ECLIPSE UPGRADES
14 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
- 1st UPGRADE : acceptance tests yields lower than those expected as per technical references formally reported by Siemens in the public bid (F-18 targets: 1600 mCi instead of 2400 mCi)
REASONS OF 2nd UPGRADE : ION SOURCE INSTABILITY
31 rebuilts in 31 months, 10 PMs
Once close to 50 A_hrs, but usually no more than 25 A_hrs in between two rebuilts
IS REBUILTS AFTER 2nd UPGRADE
15 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
IS REBUILTS BEFORE 2nd UPGRADE
Maximum 21 A_hrs in between two rebuilts
ION SOURCE INSTABILITY : SOLVED
DECISIVE INTERVENTION ON DECEMBER 2013
SINCE DECEMBER 2013 ONLY TWO REBUILTS
FEBRUARY PM - 25.8 A_hrs MAY PM - 45.7 A_hrs
NEXT PM ON AUGUST
37.9 A_hrs
60/60 2 hrs dual beam IS current : 0.23- 0.28 A
16 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
ION SOURCE INSTABILITY : HIGHLIGTHED…
CLARIFICATION
NOT A QUESTION OF THE SINGLE PERSON, OF THE SINGLE TECHNICIAN OR ENGINEER CAME,
ALWAYS TRYING TO DO THEIR BEST FOR THE CUSTOMER
SIEMENS’ MAINTENANCE WAY OF FACING THE PROBLEM FOR DUE SUPPORT
LACK OF SIEMENS COORDINATION
17 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
3 TECHNICAL SUPPORT SOURCES
- RSC SUPPORT (since Sept. 2009)
- ITALIAN SUPPORT (since Aug. 2010)
- KNOXVILLE SUPPORT (7 I&S in 4 years)
ION SOURCE INSTABILITY : LACK OF SIEMENS COORDINATION
18 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
NOONE APPOINTED TO BE «SITE REFERENCE EXPERT» (knowing the story of the machine and in charge to coordinate interventions)
3 DIFFERENT TECHNICAL SUPPORTS
No evidence of
- COMMON PROCEDURES - COMMON DOCUMENTS
- REAL COMMUNICATION AMONG THEM
4 YEARS TO SOLVE THE PROBLEM
DESPITE THE 2nd UPGRADE
DESPITE THE INTENSE MONITORING PUT IN PLACE AND MAINTAINED BY THE CUSTOMER
WITH DATA ALWAYS AVAILABLE AND SHARED IN ORDER TO COLLABORATE WITH SIEMENS
FOR HELPING TO IDENTIFY THE SOLUTIONS ASAP AND FOR REDUCING THE DOWNTIME OF THE MACHINE
ION SOURCE INSTABILITY : LACK OF SIEMENS COORDINATION
19 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
3 DIFFERENT NATIONALITIES
- REGULATORY, eg. no common safety legislation
- TECHNICAL ISSUES, eg. different cylinder-regulator connections
THE RESULT
• HEAVY WASTE of TIME and RESOURCES/MATERIALS
• MISSMATCH with:
the TIMING and PERFORMANCE OBLIGATIONS
the (EXPENSIVE) TOP PLUS MAINTENANCE
CONTRACT
SIEMENS
20 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
THE RESULT
• HEAVY WASTE of TIME and RESOURCES+MATERIALS
• MISSMATCH with:
the TIMING and PERFORMANCE OBLIGATIONS toward
HOSPITALS (new projects delivery)
BUSINESS PLAN
MEDIPASS
21 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
DECEMBER 2010 started to realize that also BL2 F-18 HP target yields
were often under Siemens specs
F-18 RD RELIABILITY
THE UPGRADE TO HP/HP SHOULD HAVE SOLVED THE MATTER
JANUARY 2011 meeting in Milan to agree the second upgrade planned for May 2011
REASONS OF 2nd UPGRADE : F-18 RD TARGET RELIABILITY
22 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
FEBRUARY - MARCH 2011 noted to Siemens that HP F-18 target yields were lowering day by day, especially considering long runs, with a marked “first run – first effect”
2011
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
FEBRUARY – APRIL 2011
interventions on BL2 F-18 HP target
February 2011 : installation of a target body discarded in October 2009
March 2011 : installation of the target body removed on February
April 2011 : new target body and
new cleaning procedure
2011
F-18 HP TARGETS : OPEN QUESTION
23 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
F-18 HP TARGETS: OPEN QUESTION
Procedure A: from November 2009 to April 2011 chloroform/acetone/methanol/water Procedure B: from April 2011 to May 2011 diluted nitric acid
DIFFERENT CLEANING PROCEDURES
24 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2011
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
MAY 2011
BL1 UPGRADE
and new cleaning procedure
2011
F-18 HP TARGETS: OPEN QUESTION
25 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
F-18 HP TARGETS: OPEN QUESTION
Procedure A: from November 2009 to April 2011 chloroform/acetone/methanol/water Procedure B: from April 2011 to May 2011 diluted nitric acid Procedure C: from May 2011 to February 2012 concentrate nitric acid / concentrate hydrogen peroxide
DIFFERENT CLEANING PROCEDURES
26 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2011
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
F-18 HP TARGETS: OPEN QUESTION
HP TARGETS FROM THE 2nd UPGRADE TO DECEMBER 2011
F-18 target saturation yields (dose calibrator) :
- in blue BL1 target installed on May 2011 cleaned with procedure C
- in red 4 different targets installed/reistalled on BL2 cleaned with procedure C
2011
27 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2011
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
F-18 HP TARGETS: OPEN QUESTION
“nitric acid and hydrogen peroxide treatment on F-18 targets has been useful to avoid the problem of “long run [F-18]fluoride low yields”, but in the case of “old targets” (target previously used and then treated with the mixture) the [F-18]fluoride yields start to decrease again in a more or less short period. (…) Like if, for “old target”, the “passivation” due to oxidant treatment would easily degrade over time leaving impurities responsible of [F-18]fluoride yield decrease to diffuse to the outer surface.”
DECEMBER 2011: note to Siemens
28 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2011 2011
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
F-18 HP TARGETS: OPEN QUESTION
“The matter is that from six months (after the cyclotron up-grade),
when we started to produce FDG with [F-18]fluoride from day by day longer 60/60 uAmps dual beams,
we are suffering of a high dispersion on FDG yields
(in the range 18-65%).
Moreover, the FDG yields worsened from July up to now (….)
We investigated the possible reasons of such trend, evaluating synthesis modules, transfer lines, starting materials, gases and
everything else involved in FDG syntheses.”
DECEMBER 2011: note to Siemens
29 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2011 2011
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
F-18 HP TARGETS: OPEN QUESTION
“However, if we can be confident that the second treatment with the
“etchant” will guarantee an improvement in [F-18]fluoride yields,
you can understand that we are really and really afraid about how the tantalum of all the targets we
are using can affect the FDG yields.
You would agree with us that for a cyclotron it is important to give not only “on spec” [F-18]fluoride yields,
but “on spec” yields of high quality [F-18]fluoride”
DECEMBER 2011: note to Siemens
30 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2011 2011
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
F-18 HP TARGETS: OPEN QUESTION
FEBRUARY 2012 : NEW TARGET FOR BL2 AND A NEW CLEANING PROCEDURE
Procedure A: from November 2009 to April 2011 chloroform/acetone/methanol/water Procedure B: from April 2011 to May 2011 diluted nitric acid Procedure C: from May 2011 to February 2012 concentrate nitric acid / concentrate hydrogen peroxide
Procedure D: from February 2012 chloroform/acetone/methanol/water and 8 hr oven backing at 120° C
DIFFERENT CLEANING PROCEDURES
2012
31 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2011
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
F-18 HP TARGETS: OPEN QUESTION
F-18 target saturation yields : in blue BL1 target installed on May 2011 ; in red BL2 target installed on February 2012
HP TARGETS FROM FEBRUARY 2012 TO JUNE 2012
32 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2012 2011
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
JUNE 2012: medipass CFV Radiopharmacy & Cyclotron Unit – June 2012 report
1. INTRODUCTION
2. MATERIALS AND METHODS
2.1. Modules and hot cells
2.2. Connections among cyclotron, modules and hot cells
2.3. FDG synthesis
2.4. [F-18]Fluoride: delivery from cyclotron to modules and activity measurements
2.5. [F-18]Fluoride: yields and [F-18]fluoride vial GM calibration
2.6. [F-18]Fluoride: loss of volume during delivery
2.7. FDG: delivery from modules to hot cell “B” and vial dispensing
2.8. FDG: yields and FDG collecting vial GM calibration
2.9. Corrected FDG yields
2.10. Activity balance
2.11. Target maintenances and substitutions in the last year
2.12. Target wash-dry procedure
2.13. Synthesis module maintenance
2.14. Dose calibrator constancy and linearity
2.15. [F-18]fluoride daily production plans
2.16. Discarded data
3. RESULTS AND DISCUSSION
3.1. Saturation target yields from July 2011 to July 2012
3.2. Target yields: maintenances, target substitutions and different cleaning procedures
3.3. FDG yields from July 2011 to July 2012
3.4. FDG activity balance
4. CONCLUSIONS
4.1. Target yields
4.2. FDG yields
F-18 HP TARGETS: OPEN QUESTION
33 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
JUNE 2012: medipass CFV Radiopharmacy & Cyclotron Unit – June 2012 report
F-18 HP TARGETS: OPEN QUESTION
4. CONCLUSIONS 4.1 Target yields
“From April 2011 to February 2012, based on data progressively collected, three different new cleaning procedures have been tested, confirming that a problem related to target quality really existed and needed to be solved. Target yield data also indicate that probably the last version of cleaning procedure, involving a final backing step and in use from February, can be useful to increase the goodness of targets and their performances. Moreover, the mismatch between BL1 and BL2 target behaviours is almost cancelled: since rebuilt with the backing procedure the two targets show matching yield trends. On the other hand, the trend of BL1 target yields slowly decreased in one year, and both the targets are at the moment under Siemens specs. This in contrast with other Siemens site experiences, where the same targets are employed from seven-nine years giving always very consistent yields and purity at 60 uA, although rebuilt by using the “old” cleaning procedure with chloroform/acetone/methanol/water”
34 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
JUNE 2012: medipass CFV Radiopharmacy & Cyclotron Unit – June 2012 report
F-18 HP TARGETS: OPEN QUESTION
4. CONCLUSIONS 4.2 FDG yields
“(…) impurities coming from targets interfered with nucleofilic substitution during FDG syntheses, giving raise in 2011 to really low FDG yields and to the downward yield trend observed, the backing step recently adopted is more effective in passivating the target than chemical oxidizing treatments, perhaps thanks to a deeper action. On the other side, dispersion on FDG yields is still an open question, that prompt us to consider again our previous comments about “target passivation which can degrade leaving impurities to diffuse from the outer surface””
35 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2012
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
2011
F-18 HP TARGETS: OPEN QUESTION
NOVEMBER 2012 :
TWO NEW TARGETS FROM A DIFFERENT TANTALUM BAR LOT
36 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2012
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
2011
F-18 HP TARGETS: OPEN QUESTION
BL2 target : constantly below Siemens specifications from December 21st 2012
BL1 target : almost constantly below Siemens specifications after the PM made on May 2013
However, FDG yield dispersion was markedly reduced
F-18 target saturation yields : in blue BL1 target; in red BL2 target
HP TARGETS FROM NOVEMBER 2012 TO AUGUST 2013
37 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
F-18 HP TARGETS: OPEN QUESTION
AUGUST 2013 :
A NEW ATTEMPT TO SOLVE THE PROBLEM
WORKING ON O-18 WATER LOADING LINE
38 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2012
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
2011 2013
F-18 HP TARGETS: OPEN QUESTION
F-18 target saturation yields : in blue BL1 target; in red BL2 target
HP TARGETS FROM NOVEMBER 2012 UP TO NOW
39 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
BL2 target : constantly below Siemens specifications
BL1 target : constantly below Siemens specifications
However, FDG yield dispersion still reduced
F-18 HP TARGETS: OPEN QUESTION
THE RECENT «MIRACLE» OF BL2 TARGET
ON MAY 6th BL2 TARGET BLEW UP JUST FOUR WORKING DAYS BEFORE THE PM
2014
40 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2012
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
2011 2013
F-18 HP TARGETS: OPEN QUESTION
THE RECENT «MIRACLE» OF BL2 TARGET
BL2 F-18 target after the maintenance made on May 7th 2014 because blown up reached an yield 13% higher if compared to the average yield from August, without cleaning because of the imminent PM BL2 F-18 target after the quarterly PM made on May 12th 2014 reached an average yield 19% higher if compared to the average yield from August
41 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
F-18 HP TARGETS: OPEN QUESTION
THE RECENT «MIRACLE» OF BL2 TARGET
• A TARGET NEVER IN SPEC FOR 18 MONTHS • NOT IN SPEC NEITHER AFTER PMs
• IN SPEC WITHOUT CLEANING AND BACKING • IN SPEC WITHOUT ANY ATTEMPTS TO IMPROVE YIELDS
What done during May 7th intervention :
- CHANGE OF HAVAR WINDOW
- CHANGE OF O-RINGS - CHANGE OF GRID (old spare grid)
- CHANGE OF STRIPPING FOILS
42 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
What done during May 12th PM :
- CHANGE OF HAVAR WINDOW - CHANGE OF O-RINGS
- CHANGE OF GRID (new grid)
F-18 HP TARGETS: OPEN QUESTION
The day in which we moved from stripping foil 1 to 2 (July 7th), BL2 F-18 target yields decreased again, and now it is under Siemens specs, althought we moved to foil 1 again
THE END OF THE «MIRACLE»
43 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
F-18 HP TARGETS: OPEN QUESTION
Tantalum Targets Siemens departed from Silver to Tantalum target bodies in 2002 with great benefits:
Fewer metal ions in solution
All detected products are from Havar foil.
Less than minimum detectable activity in last two purification cartridges and final product.
Number of runs between rebuilds has increased
Silver targets typically required rebuilding at 3000 µA-hr week intervals.
Tantalum targets operate well above 10,000 µA-hr before rebuilds are necessary.
Beam on target has increased as well
Silver target was typically operated at 55 µA.
Tantalum operates at 60 µA comfortably, with room to grow.
Saturation yield increased 10%, FDG yield increased 10% and standard deviations improved.
Key Benefits Reduced cost
Lower operating expenses
Enhanced reliability
http://www.medical.siemens.com/webapp/wcs/stores/servlet/SMGenericDisplay~q_catalogId~e_-1~a_langId~e_-1~a_pageId~e_129015~a_storeId~e_10001.htm
STILL A CHANCE TO EXPERIENCE HP TARGET KEY BENEFITS
HOWEVER, IT CANNOT BE JUST AN ILLUSION
44 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
Note : 10,000 µA-hr = 166 hrs = 83 runs 120’ = 4 months
Note
WHAT DONE SINCE 2012
CHANGED TARGET POSITION from pos. 1 to pos. 2 SWAPPED TARGETS FIXED TGT COOLING
MADE PAPER BURN TESTS CHANGED O-18 WATER RESERVOIRS
CHANGED O-18 WATER LOADING LINES CHANGED O-18 WATER LOADING VOLUME
CHANGED DELIVERY LINES (PTFE-PEEK) CHANGED O-16 RINSE WATER
CHANGED TANTALUM… … WHAT ELSE?
(shape similar to a Pandora’s box…)
F-18 HP TARGETS: OPEN QUESTION
45 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
WHAT ABOUT NEXT ANNUAL PM ON AUGUST 2014 ?
WHAT ABOUT AFTER 42 MONTHS ?
F-18 HP TARGETS: OPEN QUESTION
46 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
2014 2012
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A
2011 2013
AIM OF THIS KIND OF MEETINGS
Complaining by itself in useless and collaboration is foundamental
to accelerate troubleshooting
Meetings like this should be serioulsly promoted by Siemens because the main aim of all the customers
is for sure to contribute to rapid problem answers and to give suggestions for improving solutions,
in spite of their different needs
However,
47 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
ACTUAL SITUATION
SINCE 2011
• Medipass is still waiting concrete answers
• Medipass is still wasting concrete resources and opportunities
• Medipass is still willing itself to go on for satisfying Regione Veneto requests as per formal CFV Radiopharmacy-cyclotron unit Regional role
And, considering the last point, we can do it, because in 5 years we gained the experience for dealing with the machine in a “easygoing” way However, specifications are specifications, and we cannot compromise
48 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK
medipass advanced healthcare services
www.medipass.it www.medipasshealthcare.com
a Group company
medipass s.r.l. Via Ilio Barontini, 20 40138 Bologna - ITALY tel. +39 051-42.93.011 e-mail: [email protected]
THANK YOU
51 RDS111 and Eclipse RD/HP Cyclotron User Meeting 2014, Imanova Ltd, London, UK