cast iron inventory darin burk pipeline safety program manager, il commerce commission past...

24
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

Upload: gael-evitt

Post on 15-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

CAST IRON INVENTORYDARIN BURK

PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE

COMMISSION

PAST CHAIRMAN, NATIONAL ASSOCIATION OF

PIPELINE SAFETY REPRESENTATIVES

Page 2: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

NATIONAL INVENTORY DECEMBER 2013

• CAST IRON GAS MAIN EXISTS IN 35 STATES

• 30,905 MILES

• 11,991 CAST IRON SERVICE LINES

Page 3: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

CAST IRON MAIN INVENTORY REDUCTION

Page 4: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

CAST IRON SERVICE LINE REDUCTION

Page 5: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

BARE STEEL PIPE INVENTORY DECEMBER 2013

• 56,883 MILES OF BARE STEEL MAIN NATION WIDE

• 2,361,093 INDIVIDUAL BARE STEEL SERVICE LINES NATION WIDE

Page 6: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

BARE STEEL MAIN REDUCTION

Page 7: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

BARE STEEL SERVICE LINE REDUCTION

Page 8: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

STATES WITH COST RECOVERY MECHANISMS AS OF SEPTEMBER 2012

Page 9: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

EXCAVATION DAMAGE REMAINS THE NO. 1 CAUSE OF SIGNIFICANT INCIDENTS

Page 10: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

SIGNIFICANT DISTRIBUTION INCIDENTS

Page 11: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

DISTRIBUTION INCIDENT FATALITIES

Page 12: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

GAS DISTRIBUTION INCIDENTS 2013

Page 13: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

CAST IRON REPLACEMENT CHALLENGES

• RISK BASED REPLACEMENT PROGRAMS

• QUALIFIED WORKFORCE

• SCHEDULE CONFLICTS WITH MUNICIPALITIES

• EXPANSION VS. REPLACEMENT

Page 14: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

RISK BASED REPLACEMENT PROGRAMS

• IDENTIFICATION OF HIGHEST RISK PIPE BASED ON DIMP PROGRAM

• CAST IRON MAY NOT BE THE HIGHEST RISK PIPE IN THE SYSTEM

• BARE STEEL

• COPPER

• VINTAGE PLASTICS

Page 15: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

VERIFICATION OF IMPLEMENTATION

• MUNICIPAL PROJECT DEVIATIONS

• ROAD OPENING PROHIBITIONS

• BUDGET CONSTRAINTS

• UNFORESEEN FINANCIAL ISSUES MAY DELAY PROJECTS

Page 16: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

RISK BASED PROGRAM • SHOULD IDENTIFY

• CORROSION / GRAPHITIZATION

• LEAK PRONE PIPE

• SPECIFIC RISKS TO PIPE

• THIRD PARTY DAMAGE

• OUTSIDE FORCES

• MATERIAL FAILURE

• ETC.

Page 17: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

QUALIFIED WORKFORCE LIMITATIONS• NEW CONSTRUCTION IS NOT A COVERED TASK UNDER OPERATOR

QUALIFICATION

• CONTRACTED LABOR CAN INSTALL NEW PIPE BUT CANNOT PERFORM TIE IN TO LIVE GAS

• OPERATOR QUALIFIED WORKFORCE CANNOT KEEP UP WITH CONTRACTOR CREWS

• MOVE OUT OF METER SETS

• LINE STOPPING

• MAIN TIE INS

Page 18: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

SCHEDULE CONFLICTS

• MUNICIPAL INFRASTRUCTURE REPLACEMENT PROGRAMS

• CI OFTEN REPLACED IN CONJUNCTION WITH SEWER REPLACEMENT OR ROAD RENEWAL

• MUNICIPAL PERMITTING

• EXCAVATION PERMITS

• MUNICIPAL LINE LOCATING

• TRAFFIC ROUTING ISSUES

Page 19: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

SYSTEM EXPANSION VS. REPLACEMENT

• POPULATION GROWTH IN SOME AREAS PULL RESOURCES FROM REPLACEMENT PROJECTS

• OPERATORS FOCUSED ON OBTAINING NEW REVENUE SOURCES

• EXPANSION OF NATURAL GAS AVAILABILITY

Page 20: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

INTERIM CUSTOMER AND PUBLIC PROTECTION

• PUBLIC AWARENESS PROGRAMS (PA)

• INNOVATIVE, ROBUST PA PROGRAMS TO ENSURE RISKS ARE KNOWN TO ALL STAKEHOLDERS

• ENHANCED PA EFFECTIVENESS EVALUATIONS

• USE OF NEW INTERACTIVE PROGRAMS

• AS PIPELINE WATCH TO ENGAGE PUBLIC

• GA EMERGENCY RESPONDER TRAINING PROGRAM

Page 21: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

ENHANCED DIMP CAN REDUCE RISK

• PROGRAMS THAT FULLY IMPLEMENT THE INTENT OF THE CODE

• NOT SIMPLY COMPLIANT

• ENHANCED KNOWLEDGE OF THE SYSTEM

• CAPTURING INFORMATION AT EVERY OPPORTUNITY

• ENSURING THAT THE DATA COLLECTED FOR NEW PIPING IS APPROPRIATE AND USEFUL

Page 22: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

API RP 1173 PIPELINE SAFETY MANAGEMENT SYSTEMS CAN REDUCE RISK

• ENGAGE ENTIRE WORKFORCE FROM TOP MANAGEMENT TO FRONT LINE FIELD EMPLOYEES

• COMMUNICATION OF RISKS

• IMPLEMENTATION OF OPERATIONAL CONTROLS

• INCIDENT AND NEAR MISS INVESTIGATIONS

• SAFETY CULTURE VS. COMPLIANCE CULTURE

Page 23: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES
Page 24: CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES