AS/NZS 1428.4.1:2009 21 Ceylon St, Nunawading VIC 3131 Phone 1300 665 761 [email protected] Cast In Place Document Version: 1.1.2021 TGSI INSTALLATION GUIDE Repair & Renew your streetscape Replace your broken and missing Tactile Ground Surface Indicators with ESP Cast In Place Access Tiles

Upload: others

Post on 28-Jul-2021

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cast In Place - ESP Aust · 2021. 3. 15. · 03 04 ESP INSTALLATION GUIDE Cast In Place TGSI Installation Guide. 3 ESP INSTALLATION GUIDE Cast In Place TGSI Installation Guide ESP

AS/NZS 1428.4.1:2009

21 Ceylon St, Nunawading VIC 3131 Phone 1300 665 761 [email protected]

Cast In PlaceDocument Version: 1.1.2021

TGSI INSTALLATION GUIDE

Repair & Renew your streetscapeReplace your broken and missing Tactile Ground Surface Indicators with ESP Cast In Place Access Tiles

Page 2: Cast In Place - ESP Aust · 2021. 3. 15. · 03 04 ESP INSTALLATION GUIDE Cast In Place TGSI Installation Guide. 3 ESP INSTALLATION GUIDE Cast In Place TGSI Installation Guide ESP

2

www.espaust.net.au

Concrete should be placed within a 60 - 80 slump

Using a string line measure, find and mark the centre point of the new concrete ramp.

The new ESP Access Tile should be installed as per AS/NZS1428.4.1:2009.

While the concrete is still soft, the tile can be placed gently into it’s proper position.

BEGIN POURING THE CONCRETE

FIND THE CENTRE POINT OF NEW RAMP

MEASUREMENTS AS PER AS/NZS 1428.4.1:2009

PLACE THE TILE GENTLY IN WET CONCRETE

01

02

03

04

ESP

INST

ALLA

TIO

N G

UID

E

Cast In Place TGSI Installation Guide

Page 3: Cast In Place - ESP Aust · 2021. 3. 15. · 03 04 ESP INSTALLATION GUIDE Cast In Place TGSI Installation Guide. 3 ESP INSTALLATION GUIDE Cast In Place TGSI Installation Guide ESP

3

ESP

INST

ALLA

TIO

N G

UID

E

Cast In Place TGSI Installation Guide

www.espaust.net.au

ESP

INST

ALLA

TIO

N G

UID

E

Using a rubber mallet, begin to tap the tile into the concrete starting in the middle and working your way to the edges. Ensure that you continue vibrating the tile with the rubber mallet until the tile is flush & even with the surrounding concrete.

Weight should be placed on the top of the tiles to hold it in place until the concrete has been set.

Create an edge around the perimeter of the tile using a fine radius edging tool. In addition, a mag float is also used to ensure that the tiles are flush with the height of the concrete to eliminate any tripping points.

Traditional control joins should be installed. Finally, retrace your edges & joins. Once the concrete has set, remove weights & surrounding safety equipment to clean the finished product.

USE A RUBBER MALLET TO TAP THE TILE IN PLACE

USE A WEIGHT TO HOLD THE TILES IN PLACE

CREATE AN EDGE AROUND THE PERIMETER OF THE TILE

INSTALL TRADITIONAL CONTROL JOINS & RETRACE YOUR EDGES

05

06

07

08

Page 4: Cast In Place - ESP Aust · 2021. 3. 15. · 03 04 ESP INSTALLATION GUIDE Cast In Place TGSI Installation Guide. 3 ESP INSTALLATION GUIDE Cast In Place TGSI Installation Guide ESP

BE THESOLUTION

Telephone: 1300 665 761 E-mail: [email protected] Web: www.espaust.net.au

21 Ceylon Street Nunawading VIC 3131

Beyond ESP’s products and services, we conduct our business in a manner that demonstrates each project is an opportunity to be part of the solution.