case study_omax autos
TRANSCRIPT
Overview
� Amongst top three companies in Automotive Stamping and two wheeler & Commercial vehicle Chassis manufacturing-(Process 85k Tons Steel pa)
� Largest Sprocket manufacturing capacity (11 Million pa) in South East Asia.
Facilities
� Largest Tri Nickel Chrome Plating facility (120 Million DM2)
� Largest & full spectrum welding facility in India with robots & 800 MIG welding sets (100 Km welding capacity per day)
� Largest consolidated Piston Rod manufacturing facility with super finishing capability catering to Europe & United States.
� Designing
� Automotive Stampings
� Two Wheel & Commercial Vehicle Chassis manufacturing
ONE STOP SOLUTION:
Process Capability � Machined Parts – Sprockets/ Piston Rods/ Oil Pumps/
Transmission Shafts
� Full spectrum welding process- Robotic MIG, spot and friction
� Powder Coating & Liquid Painting
� Zn Plating, Tri Nickel Chrome Painting & Hard Chrome Plating
– To protect Earth– To reduce costs and be competitive– To survive power and fuel unavailability and cost increase
Why conserve Energy?
15
20
25
30
35
NG Price
17% 61%
30
40
50
HSD Price
9% 25%
0
5
10
15
FY 10-11 FY 11-12 FY 12-13
Till Nov'12
17%
0
10
20
FY 10-11 FY 11-12 FY 12-13
Till Nov'12
0
1
2
3
4
5
6
7
FY 10-11 FY 11-12 FY 12-13…
Grid Power
13% 38%
Why conserve energy?
FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13…
Actual
If unattended
Power & Fuel Cost Power & Fuel Cost would be
almost double!!
FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13…
0
2
4
6
8
10
12
14
Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12
Daily Average Power Cut Hours
Daily Average Power
Cut Hours
~ 6 hrs of power cut
everyday (25%)
Energy Saving Strategy
PHASE I
Reduce Energy
PHASE II
Reduce Energy
PHASE III
Move towards Renewable
Energy Conservation Strategy
Reduce Energy Consumption
Energy Audits and Optimization
Waste Heat RecoveryFuel Saver Devices
Monitoring and Management
Reduce Energy Cost
Reduction in Contract Demand
Power TradingCheaper Alternate
Fuels (Pet coke, Rice
husk, briquettesetc.)
Renewable Energy
Rooftop Solar
Future Plan1 MW Rooftop Solar for
Captive Power
Power Factor• P is the Active power (kW)
• S is the apparent power (kVA)
• Q is the reactive power
• Reactive power is necessary to generate the magnetic
field needed to run certain types of loads like lighting,
induction motors, electric furnacesinduction motors, electric furnaces
• But it also tends to increase the difference between P
and S.
If PF is not close to 1, we will be paying for more power than we actually use.
Dharuhera 0.99
Speedomax 0.98
Binola 0.99
Manesar 0.99
Conventional vs Waste Heat Recovery
Exhaust
Exhaust
Steam generation
Air Conditioning
HRU
DG SET
Cooling Tower
FUEL
Jacket Water
DG SETFUEL
Jacket WaterAir
Conditioning
Waste Heat Recovery at OMAX
• Omax Dharuhera :
• 1.5 MW Gas Genset
• HRU installed
• Replaces Hot water generator at powder coating facility
• 400 SCM/day savings in PNG
• ~Rs. 2.5 Lac/month savings
• Omax Manesar:
• 1.5 MW Gas Genset
• HRU under planning
• Exhaust heat will be used to heat ovens at powder coating
• Jacket water heat will be used for Air conditioning using VAM
HAREDA provides subsidy for waste heat recovery projects.
Both the above projects have been selected
Fuel Saving Techniques
Catalytic Fuel Saver device
• Installed at the diesel line inlet of DG, burners
• Simple catalytic device
• Results in savings of about 6 - 9% in fuel consumption
Diesel Additive
• 250 ml of additive for every 1000 ltr of Diesel
• Improves the fuel properties
• Results in savings of 5 -10%
• Modular type IGBT rectifier to replace old
technology rectifiers in Electroplating
• Approx 20% higher efficiency
• Easy to maintain and upgrade
Technology Upgrade
• Innovative method to utilize Sun’s visible light indoors
• No heat addition
• project in process
Innovative Day-lighting system
WATERLESS URINAL
• Water and Energy are inter linked
• Saving water saves energy and reduces cost
• Savings by means of reduction in:
• Pumping power
• Treatment cost
Omax Renewable Energy• 2 x 100 kWp rooftop solar power plants have been installed for captive use
• 2 x 1.25 MW Grid Connected, Wind Turbine Generators have been commissioned at Jaisalmer, Rajasthan in 2012.
• Further 1 MW Rooftop Solar has been planned in FY 13-14 for captive use across our manufacturing units.
Mega Watt scale Solar Projects
• Omax is venturing into the Solar EPC sector
• Installation of MW scale rooftop Solar Power Plants for
Captive use
• Easy to adapt financial model
CLEAN ENERGY GREEN ENERGY
• Long term hedging against power cost increase
• Added benefits through Renewable Energy Certificates (REC).