Office Refurbishment Corpus Christi Catholic High School Oak Flats NSW RESIDENTIAL AND COMMERCIAL BUILDING SERVICES CASE STUDY PROJECT DETAILS AJ Grant received a request for Tender from Leaf Architecture for the refurbishment of two rooms in the admin building at the Corpus Christi Catholic High School in Oak Flats. The first room involved some light demolishing works to erect new framework and walls to create the new office space. New fixed joinery and cabinetry were installed to the new office and in the existing finance office space. Final painting and clean after installation of new joinery completed prior to the end of the holidays and on time as per program to allow the staff to set up for the 2019 school year. REPAIRS MAINTENANCE RENOVATIONS MODIFICATIONS Project Manager Glenn Amies Location Industrial Road Oak Flats NSW Supervisor Doug Stokes Sector Education 01 www.ajgrantgroup.com.au If you have a creative challenge or renovation / repair project, we’d love to hear from you COMMERCIAL WORKS www.ajgrantgroup.com.au 1300 254 726 RESIDENTIAL WORKS www.homecarerepairaustralia.com.au 1800 155 166 Client Catholic Education Diocese of Wollongong

Upload: others

Post on 28-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASE STUDY · REPAIRS MAINTENANCE RENOVATIONS MODIFICATIONS the 2019 school year. Project Manager Glenn Amies Location Industrial Road Oak Flats NSW Supervisor Doug Stokes Sector

Offi ce Refurbishment Corpus Christi Catholic High SchoolOak Flats NSW

RESIDENTIAL AND COMMERCIALBUILDING SERVICES

CASE STUDY

PROJECT DETAILS

AJ Grant received a request for Tender from Leaf Architecture for the refurbishment of two rooms in the admin building at the Corpus Christi Catholic High School in Oak Flats.

The fi rst room involved some light demolishing works to erect new framework and walls to create the new offi ce space. New fi xed joinery and cabinetry were installed to the new offi ce and in the existing fi nance offi ce space.

Final painting and clean after installation of new joinery completed prior to the end of the holidays and on time as per program to allow the staff to set up for the 2019 school year.

REP

AIR

S

MA

INTE

NA

NCE

R

ENO

VATI

ON

S

MO

DIF

ICA

TIO

NS

Project ManagerGlenn Amies

LocationIndustrial Road

Oak Flats NSW

SupervisorDoug Stokes

SectorEducation

01w

ww

.ajg

rant

grou

p.co

m.a

u

Final painting and clean Final painting and clean after installation of new joinery completed prior to the end of the holidays and on time as per program to allow the staff to set up for the 2019 school year.

Final painting and clean

If you have a creative challenge or renovation / repair project, we’d love to hear from you

COMMERCIAL WORKSwww.ajgrantgroup.com.au1300 254 726

RESIDENTIAL WORKSwww.homecarerepairaustralia.com.au

1800 155 166

ClientCatholic Education

Diocese of Wollongong