Case Study: PV system for diesel savings for a luxury hotel KRAFTWERK Renewable Power Solutions specializes in the development and implementation of intelligent solar power plant solutions. KRAFTWERK designed and constructed a photovoltaic ( PV ) plant within an off-grid diesel system for Tierra Atacama Hotel & Spa located in the Atacama Desert. The heart of the solution is an intelligent control unit which allows a stable PV-diesel supply system without the use of batteries. During the day, the PV plant generates up to 50% of the hotel’s electricity. Tierra Atacama Hotel & Spa San Pedro de Atacama, Chile July 2013 1 week 23 kWp Canadian Solar CS6P 240P PLATINUM ® R3 series PLATINUM ® HybridControl Mounting Systems “We are very excited with the results of this solar project which supports our commitment to the environment. This innovative hybrid system has been a tremendous advance for us. We hope to continue developing solar projects hand in hand with KRAFTWERK, who give us [OL JVUÄKLUJL [V PU]LZ[ PU Z\Z[HPUHISL technologies”. Miguel Purcell General Manager, Tierra Hotels Tierra Hotels Subject Location Installation Installation time PV power Components

Upload: doannhi

Post on 23-Feb-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Case Study:PV system for diesel savingsfor a luxury hotel

KRAFTWERK Renewable Power Solutions specializes in the development and implementation of intelligent solar power plant solutions.

KRAFTWERK designed and constructed a photovoltaic (PV) plant within an off-grid diesel system for Tierra Atacama Hotel & Spa located in the Atacama Desert. The heart of the solution is an intelligent control unit which allows a stable PV-diesel supply system without the use of batteries. During the day, the PV plant generates up to 50% of the hotel’s electricity.

Tierra Atacama Hotel & SpaSan Pedro de Atacama, ChileJuly 20131 week23 kWpCanadian Solar CS6P 240PPLATINUM® R3 series PLATINUM® HybridControlMounting Systems

“We are very excited with the results of this solar project which supports our commitment to the environment. This innovative hybrid system has been a tremendous advance for us. We hope to continue developing solar projects hand in hand with KRAFTWERK, who give us [OL�JVUÄKLUJL�[V�PU]LZ[�PU�Z\Z[HPUHISL�technologies”.Miguel PurcellGeneral Manager, Tierra Hotels

��͍Ti

erra

Hot

els

Subject Location Installation Installation time PV power Components

AchievementsKRAFTWERK and PLATINUM have developed an intelligent solution applicable to all PV systems from small to large scale. The PLATINUM® HybridControl makes it possible for our clients in the off-grid segment to save high fuel costs in H�MHZ[�HUK�LMÄ�JPLU[�^H �̀

ChallengesSince the solar power plant is an island system solution without the use of batteries, it was imperative to determine the optimal PV plant size in conjunction with the grid-creating diesel generator. To ensure success, the hotel’s load WYVÄ�SL�OHK�[V�IL�L_[LUZP]LS`�TLHZ\YLK�HUK�analyzed during the planning phase.

Objectives

Achieve maximum reduction of energy costs

Maximize environmental ILUL�[Z

Install a PV plant which ZH[PZ�LZ�IV[O�M\UJ[PVUHS�HUK�aesthetic criteria

)LUL�[Z

e͍���[VUZ͍�`LHY�*62 reduction on carbon footprint

>15.000 liters annual savings of fossil fuels

Hotel further enhances its commitment to environmental friendliness

Solution

Integration of a PV plant with grid inverters

PV-diesel-hybrid solution without the use of batteries

PLATINUM® HybridControl to optimize operation of PV and diesel generators

KRAFTWERK Renewable Power Solutions GmbH

Headquarters GermanyAltdorfstraße 1588250 WeingartenGermanyTel +49 (751) 579073Fax +49 (751) [email protected]

7YVQLJ[�6MÄ�JL�:VSHYDeutschherrnufer 3260594 FrankfurtGermanyTel +49 (69) 87205501Fax +49 (69) [email protected]

6MÄ�JL�3H[PU�(TLYPJHAlcántara 2006Ä�JPUH��3�3Las Condes, SantiagoChileTel +56 ( 2 ) 2952 [email protected]

www.kraftwerk-rps.comklimaneutralnatureOffice.com | DE-335-992984

gedruckt