case study on economic impact of broadband implementation · case study on economic impact of...

12
1 ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Session 8_IS - 1 Session Session 8 Case study on Economic impact Case study on Economic impact of Broadband Implementation of Broadband Implementation Ignat Stanev Ignat Stanev ITC, Bulgaria ITC, Bulgaria ITU ITU- D Regional Development Forum D Regional Development Forum for the for the EUR and CIS EUR and CIS Region: Region: NGN and Broadband, Opportunities and Challenges NGN and Broadband, Opportunities and Challenges” ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Session 8_IS - 2 Content of the presentation : Content of the presentation : Used for the case study planning tools Problem 1 – Economic Impact of Service bandwidth upgrade on xDSL broadband access network on FTTH broadband access network Problem 2 – Economic selection of broadband access technology xDSL vs. FTTH for brownfield FTTH vs. WiMAX for greenfield xDSL vs. WiMAX for rural area

Upload: others

Post on 22-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

1

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 1

SessionSession 88

Case study on Economic impact Case study on Economic impact

of Broadband Implementationof Broadband Implementation

Ignat StanevIgnat StanevITC, BulgariaITC, Bulgaria

ITUITU --D Regional Development Forum D Regional Development Forum for the for the EUR and CISEUR and CIS Region:Region:

““ NGN and Broadband, Opportunities and ChallengesNGN and Broadband, Opportunities and Challenges””

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 2

Content of the presentation :Content of the presentation :

� Used for the case study planning tools

� Problem 1 – Economic Impact of Service bandwidth upgrade

� on xDSL broadband access network

� on FTTH broadband access network

� Problem 2 – Economic selection of broadband access technology

� xDSL vs. FTTH for brownfield

� FTTH vs. WiMAX for greenfield

� xDSL vs. WiMAX for rural area

Page 2: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

2

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 3

Case study toolsCase study tools

Market definition

Evolution forecasting

Demand mapping

Technology modeling

Network design optimization

Economy analysis

VPIsystemsVPIsystemsOnePlanOnePlanAccessAccess

MULTIlink is a complete solution

for fast microwave link

engineering and designing of

PMP/WLL/LMDS networks.

LStelcomLStelcom MULTIlinkMULTIlink

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 4

Problem 1 – “Service upgrade”

There is a need to model the impact of upgrading the service bandwidth, the service take rate, and the service mix on the accessnetwork.

For a given market, the access network planners want to perform Bandwidth Upgrade Scenarios, Uptake Growth Scenarios, and Service Mix Scenarios

The access network planners have to dimension the required capacity of the access nodes, to optimize the access network and to calculate related costs to upgrade it.

Page 3: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

3

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 5

Problem 1 – “service upgrade” – example I

<- Normal

Upgraded:

Upgraded

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 6

Problem 1 – “service upgrade” – example IAverage Bandw idth per Service (for 10/1/2008)

0

20

40

60

80

100

120

CC_01

CC_02

CC_03

CC_04

CC_05

CC_06

CC_07

CC_08

CC_09

CC_10

Service Areas and Sites

in M

bit/s

Data connectivity

Internet-bus

Internet-res

IPTV

POTS

POTS (ADSL)

VoIP

Average Bandwidth per Service (for 10/1/2008)

0

50

100

150

200

250

300

350

400

450

500

CC_01

CC_02

CC_03

CC_04

CC_05

CC_06

CC_07

CC_08

CC_09

CC_10

Service Areas and Sites

in M

bit/s

Data connectivity

Data connectivity upgradex 2

Internet-bus

Internet-res

IPTV

IPTV Upgrade x 2

POTS

POTS (ADSL)

VoIP

<- Normal

Upgraded:

Page 4: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

4

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 7

Problem 1 – “service upgrade” - example I

1.4792.13354.2585401.6200.878.3104.4Total :

0.918000048.664.8CC_10

0.561000029.739.6CC_09

00.089250.178516.88.400CC_08

00.0510.097759.64.800CC_07

00.344250.688564.832.400CC_06

00.28050.56152.826.400CC_05

00.403750.80325763800CC_04

00.5781.156108.854.400CC_03

00.233750.4675442200CC_02

00.1530.30628.814.400CC_01

VoIPPOTS (ADSL)POTSIPTVInternet-resInternet-bus

Data connectivity

Service Areas and Sites

1.4792.13354.25851606.4200.878.3469.8Total :

0.918000048.6291.6CC_10

0.561000029.7178.2CC_09

00.089250.178567.28.400CC_08

00.0510.0977538.44.800CC_07

00.344250.6885259.232.400CC_06

00.28050.561211.226.400CC_05

00.403750.803253043800CC_04

00.5781.156435.254.400CC_03

00.233750.46751762200CC_02

00.1530.306115.214.400CC_01

VoIPPOTS (ADSL)POTS

IPTV Upgrade x 2Internet-resInternet-bus

Data connectivity upgrade x 2

Service Areas and SitesUpgraded:

<- Normal

Difference:

298.0%

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 8

Problem 1 – “service upgrade” - example I

<- Normal

(3 MSAN)

Upgraded:

(5 MSAN)

Page 5: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

5

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 9

Problem 1 – “service upgrade” – example I

1589527332943305334233743Maintenance

5466-410-230-730-6507486Installation

41524-4830-3250-8050-739065044Acquisition

Total:10/1/201210/1/201110/1/201010/1/200910/1/2008

Difference :

1376893276947276247275347274547273807Maintenance

53423137017601570144047283Installation

2030593130701686015070137201971873Acquisition

Total:10/1/201210/1/201110/1/201010/1/200910/1/2008

Upgraded services :

1360998274214273304272294271124270064Maintenance

47957178019902300209039797Installation

1989069179002011023120211101906829Acquisition

Total:10/1/201210/1/201110/1/201010/1/200910/1/2008

Normal services :

Costs :

Costs difference: %1.85

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 10

Problem 1 – “service upgrade” – example II

Normal :

Upgraded:

Page 6: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

6

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 11

Problem 1 – “service upgrade” – example II

<- Normal

Upgraded:

Average Bandw idth per Service (for 10/1/2010)

020004000

CC

_01

CC

_05

CC

_09

MA

3

FT

TH

2

FT

TH

6

FT

TH

_

FT

TH

_

FT

TH

_

Service Areas and Sites

in M

bit/s

Data connectivity

FTTH-Bus

FTTH-Res

Internet-bus

Internet-res

IPTV

Mobile 3G

POTS

POTS (ADSL)

Average Bandw idth per Service (for 10/1/2010)

010002000300040005000600070008000

CC_01

CC_04

CC_07

CC_10

MA3

FTTH1

FTTH4

FTTH7

FTTH_3

FTTH_6

FTTH_9

FTTH_12

Service Areas and Sites

in M

bit/s

Data connectivity

FTTH-Bus Upgraded

FTTH-Res Upgraded

Internet-bus

Internet-res

IPTV

Mobile 3G

POTS

POTS (ADSL)

VoIP

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 12

Problem 1 – “service upgrade” - example II

Upgraded:

<- Normal

Difference:

100 %

164622080

6000FTTH_12

0600FTTH_11

0400FTTH_10

3000FTTH_9

6000FTTH_8

0200FTTH_7

0400FTTH_6

6000FTTH_5

4500FTTH_4

0200FTTH_3

3000FTTH_2

1500FTTH_1

80500FTTH7

204100FTTH6

019000FTTH5

377500FTTH4

281900FTTH3

297200FTTH2

375000FTTH1

FTTH-ResFTTH-Bus

Data connectivity

Service Areas and Sites

329234160

12000FTTH_12

01200FTTH_11

0800FTTH_10

6000FTTH_9

12000FTTH_8

0400FTTH_7

0800FTTH_6

12000FTTH_5

9000FTTH_4

0400FTTH_3

6000FTTH_2

3000FTTH_1

160900FTTH7

408100FTTH6

038000FTTH5

755100FTTH4

563800FTTH3

594400FTTH2

750000FTTH1

FTTH-ResUpgraded

FTTH-Bus Upgraded

Data connectivity

Service Areas and Sites

Page 7: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

7

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 13

Problem 1 – “service upgrade” - example II<- Normal

(3 OLT, 17 Splitter 1:8 , 89 Splitter 1:4)

Upgraded:

(3 OLT, 28 Splitter 1:8, 93Splitter 1:4)

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 14

Problem 1 – “service upgrade” – example II

Costs :

Costs difference: %1.16

10631547188824942809Maintenance

-971-682-1210-6295650Installation

12737-2388-10189-1779100082Acquisition

10/1/201210/1/201110/1/201010/1/200910/1/2008

Difference :

1429314256142081419814172Maintenance

74100255632651Installation

23187543721655072814089Acquisition

10/1/201210/1/201110/1/201010/1/200910/1/2008

Upgraded services :

1323012709123201170411364Maintenance

1045783123568527001Installation

104507825123546851714006Acquisition

10/1/201210/1/201110/1/201010/1/200910/1/2008

Normal services :

Page 8: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

8

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 15

Problem 2 –Techno-economical Access Study

Aim is to investigate the techno-economical impact of various access technologies on the network for a given market

Multiple techno-economical studies are carrier out for the purpose to determine the optimum access technology for the network

Selection is done by comparison of the economical parameters for each access technology

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 16

Problem 2 – selection of access technology –example I

xDSL

Page 9: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

9

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 17

Problem 2 – selection of access technology–example I

FTTH

October 01,20127901

October 01,20111800

October 01,20107601

October 01,20091500

October 01,200830505Splitter 1:32 costSplitter 1:32 _3

October 01,2012900

October 01,2011900

October 01,20106701

October 01,2009600

October 01,200812202Splitter 1:32 costSplitter 1:32 _2

October 01,2012600

October 01,2011600

October 01,2010600

October 01,2009600

October 01,200812202Splitter 1:32 costSplitter 1:32 _1

October 01,20122504000

October 01,20112504000

October 01,20102504000

October 01,20092504000

October 01,200819226001OLTCO_Ubhur

Date

Total New Cost

Total Number Existing

Total Number New

DescriptionPart Number

Node DescriptionNode Name

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 18

Problem 2 – selection of access technology–example I

UC_1_9a UC_1_1-3Net Present Value

-1000000

-500000

0

500000

1000000

1500000

2000000

2500000

3000000

10/1/2008 10/1/2009 10/1/2010 10/1/2011 10/1/2012

US

D UC_1_9a

UC_1_1-3

xDSL vs. FTTH brownfield

FTTHxDSL

Page 10: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

10

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 19

Problem 2 – selection of access technology–example II

FTTH

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 20

Problem 2 – selection of access technology–example II

WiMAX

Page 11: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

11

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 21

Problem 2 – selection of access technology–example II

FTTH vs. WiMAX greenfield

UC_1_9c UC_1_9bNet Present Value

-200000

-100000

0

100000

200000

300000

400000

500000

10/1/2008 10/1/2009 10/1/2010 10/1/2011 10/1/2012

US

D UC_1_9c

UC_1_9bWiMAXFTTH

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 22

Problem 2 – selection of access technology –example III

xDSL

Page 12: Case study on Economic impact of Broadband Implementation · Case study on Economic impact of Broadband Implementation Ignat Stanev ITC, Bulgaria ITU -D Regional Development Forum

12

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 23

Problem 2 – selection of access technology –example III

WiMAX

ITU-D Forum Chisinau, Moldova, 24 – 26 August 2009 Ses sion 8_IS - 24

Problem 2 – selection of access technology–example III

xDSL vs.

WiMAX

rural area