Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Upload: lindsey-boyd

Post on 22-Dec-2015

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Case Study of a PROBE Building

Barclaycard Headquarters BuildingEngland

David Arnold

Troup Bywaters + Anders, London, England

Page 2: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Client’s Brief

Environmentally Friendly Building37,000 m2

2200 Employees1500 Automobiles Opening Windows Peak Temperature < 25 oC Naturally Ventilated and (Cooled)

Page 3: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Planning Options

Page 4: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England
Page 5: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Building Plan

Page 6: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Solution - Mixed Mode HVAC

Page 7: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Passive Features

Solar ShadingOpening WindowsControlled Natural VentsTrickle VentsExposed Building MassCooling/Balancing Pond

Page 8: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Building System Concept

Page 9: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Cooling - Passive Overnight

Page 10: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Cooling - Chilled Beams

Page 11: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Control

Pre-condition BuildingAllow temperature rise during dayThermal mass limits swingOnly use mechanical when needed Avoid conflict with occupant controlChange to A/C in extremes

Page 12: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

ControlOvernight cooling – powered roof

vents

Trickle vents - none

Displacement vent - CO2 Sensors

Perimeter radiation - compensator

Chilled beams- Local sensor

Page 13: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England
Page 14: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England
Page 15: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Euphoria to Despondency

Control and Equipment FailuresExtreme ConditionsUnplanned Building OperationsLearning curveBuilding Manager

Page 16: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

PROBE Survey Results

Chiller only Used few days per yearGas Heating 96 kWh/m2Electricity Use 234 kWh/m257% energy of Typical Heated Bldg17% less than Good Practice

Page 17: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

PROBE End use Electricity

Page 18: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

PROBE Carbon Emissions

Page 19: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Energy Use Comparison

Page 20: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

PROBE Lessons

A low energy, prestige office.

Significant factors in the exceptional performance of the building in terms of energy use were the integration of thermal storage in the building and cooling pond, solar shading and low transport energy use for the air and water systems. 75% of the ceiling slab is exposed and closely coupled to the occupied space, this seems to provide about the right balance for overnight cooling.

Page 21: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

PROBE Lessons

Life cycle costing avoids false economies.

CO2 sensors were specified originally but replaced by inferior detectors as part of a cost saving exercise to maintain the budget. With hindsight it was a mistake.

Page 22: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

PROBE Lessons

Manual versus automatic windows.

If the budget had been greater we would have used automatic windows with local controls. They were considered but omitted on cost grounds. Automatic window control would have increased control of overnight cooling but I am not certain whether it could have been justified on life cycle costs alone.

Page 23: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

PROBE Lessons

Vertical versus horizontal zoning.

This is a lesson well learnt. All buildings of this type have a problem with overheating on the upper floors. We were aware of the problem and were of the opinion that the temperature difference would be within the design limits. Generally this was the case but it led to complaints and we would use floor by floor control in future.

Page 24: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

PROBE Lessons

A success for mixed mode operation.

Mixed mode has proved successful but it has been complemented by the pro-active involvement and control of the facilities team. We need to develop more robust controls. The design strategy for chillers was that they would only be used for a few days per year in a typical summer however they also provide the client with an insurance against the effects of further climate change.

Page 25: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Conclusions

Thermal Storage reduces energy usePrestige Building without full A/CInnovative designs need more timeAnticipatory control will improve useBuilding Operator essential to success

Acknowledgement: Toni Panebianco Building Manager Barclaycard

Page 26: Case Study of a PROBE Building Barclaycard Headquarters Building England David Arnold Troup Bywaters + Anders, London, England

Update

Projected staff numbers up to 3350PCs greater than one to oneFour Call CentersChillers failedJoined emissions trading schemeMeasuring energy per person-hour