MAGNA PARK BAODI CASE STUDY FAST FACTS COMPANY adidas group INDUSTRY Sports apparel LOCATION Baodi, Greater Beijing, China TOTAL SIZE 64,000 sq m (688,870 sq ft) Build-to-suit warehouse PROJECT TIMELINE 34 weeks HANDOVER February 2014 TENURE Development Management The building features a range of energy efficientand flexible design features which enable increased operational efficiencies including high performance roofing and cladding. NORTH CHINA DISTRIBUTION CENTRE In February 2014, Brookfield completed and delivered a new 64,000 sq m (688,870 sq ft) build to suit warehouse for adidas, a leading global fashion retailer constructed at Magna Park Boadi, Greater Beijing. The new warehouse facility was constructed on time and on budget and will serve as the major North China Distribution Centre for the customer, becoming fully operational by September 2014. www.brookfield.com

Upload: dinhhanh

Post on 16-Mar-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

MAGNA PARK BAODICASE STUDY

FAST FACTS

COMPANY adidas group

INDUSTRY Sports apparel

LOCATION Baodi, Greater Beijing, China

TOTAL SIZE 64,000 sq m (688,870 sq ft) Build-to-suit warehouse

PROJECT TIMELINE 34 weeks

HANDOVER February 2014

TENURE Development Management

The building features a range of energy efficientand flexible design features which enable increased operational efficiencies including high performance roofing and cladding.

NORTH CHINA DISTRIBUTION CENTRE

In February 2014, Brookfield completed and delivered a new 64,000 sq m (688,870 sq ft) build to suit warehouse for adidas, a leading global fashion retailer constructed at Magna Park Boadi, Greater Beijing.

The new warehouse facility was constructed on time and on budget and will serve as the major North China Distribution Centre for the customer, becoming fully operational by September 2014.

www.brookfield.com

“We should all be proud of this development. This is now one of the best facilities adidas have globally.”Doug Newnan, VP Corporate Real Estate, adidas

The building, constructed to the customer’s exacting specification and highest possible levels of quality constitutes one of the most modern facilities developed throughout China in recent years and will play a key role in the infrastructure required to support the Retailer’s supply chain network and long term growth in China.

The building features a range of energy efficient and flexible design features which enable increased operational efficiencies including high performance roofing and cladding. The building is also designed in a way to enable growth and expansion within the customers operations together with the capability to support a high level of automation.

The delivery of this project follows completion of a similar sized, high specification 60,000 sq m (650,000 sq ft) build to suit regional distribution centre also built by Brookfield for the same retail customer in Osnabruck, Germany within the past 12 months. In total Brookfield has delivered in excess of 1.3 million sq ft of high quality, distribution space for adidas globally within the past 12 months.