CONTRACTOR Arrow International CLIENT Southland Health Board ENGINEER Opus International Consultants LOCATION Invercargill PRODUCT USED Bentofix® GCL NSP 4300 ADVANCED GEOSYNTHETIC SOLUTIONS TM Bentofix® NSP 4300 Geosynthetic clay liner was used successfully as a landfill cap in this project for the Southland Health Board. During the Demolition of the old Kew Hospital block, the rubble was taken to an on-site landfill for disposal. Cirtex offered Bentofix® NSP 4300 as an alternative to the original cover design which called for a compacted clay cover. The advantages for the client and the contractor were faster installation of the landfill cap, lower overall cost and a sealing layer which can achieve a permeability of 2 x 10-11 m/s. CASE STUDY INVERCARGILL HOSPITAL LANDFILL GAP BENTOFIX® GCL NSP 4300 CIRTEX INDUSTRIES LTD PHONE +64 7 868 9909 FAX +64 7 868 3435 0800 CIRTEX (247 839) | [email protected] | WWW.CIRTEX.CO.NZ

Upload: others

Post on 05-Jun-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASE STUDY INVERCARGILL HOSPITAL LANDFILL GAP · layer which can achieve a permeability of 2 x 10-11 m/s. CASE STUDY INVERCARGILL HOSPITAL LANDFILL GAP BENTOFIX® GCL NSP 4300 CIRTEX

CONTRACTOR Arrow International

CLIENT Southland Health Board

ENGINEER Opus International Consultants

LOCATION Invercargill

PRODUCT USED Bentofix® GCL NSP 4300

ADVANCEDGEOSYNTHETICSOLUTIONSTM

Bentofix® NSP 4300 Geosynthetic clay liner was used successfully as a landfill cap in this project for the Southland Health Board. During the Demolition of the old Kew Hospital block, the rubble was taken to an on-site landfill for disposal.

Cirtex offered Bentofix® NSP 4300 as an alternative to the original cover design which called for a compacted clay cover.

The advantages for the client and the contractor were faster installation of the landfill cap, lower overall cost and a sealing layer which can achieve a permeability of 2 x 10-11 m/s.

CASE STUDYINVERCARGILL HOSPITALLANDFILL GAPBENTOFIX® GCL NSP 4300

CIRTEX INDUSTRIES LTDPHONE +64 7 868 9909 FAX +64 7 868 3435