case study agl energy ltd.pptx
TRANSCRIPT
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
1/16
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
2/16
AGL is Australias biggest energy retailer.
Drawing on more than 170 years of experience
Australias largest dual fuel customer base.
Diverse power generation
INTRODUCTION
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
3/16
Australias largest private owner and operator
of renewable energy assets.
Supplying energy to 2.2 million homes and
300,000 businesses throughout the state ofVictoria and capital Melbourne.
INTRODUCTION contd.
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
4/16
AGL had implemented SAP IS-U and CRM
system to support the business processes.
Company was worried about the inadequate
User Acceptance Testing (UAT).
Limited bandwidth of companys Subject
Matter Experts (SMEs).
BUSINESS SITUATION
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
5/16
Documentation was insufficient.
Defect management and reuse of test assetswas weak.
Lack of a standard testing process.
BUSINESS SITUATION contd.
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
6/16
For wholesale energy : Improved settlementreporting
For merchant energy portfolio management :
Better load forecasting, accuracy and datasegmentation with better reporting.
BUSINESS REQUIREMENTS
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
7/16
For retail energy : More accurate pricing
For billing : Improved processing
Need to improve its non-integrated, outdatedand high maintenance legacy system.
BUSINESS REQUIREMENT contd.
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
8/16
AGL look for a partner who together with AGL
team would focus on providing timely UAT forthe requested changes in production.
To brace for this, the company turned to
Tata Consultancy Services (TCS).
TCS took $16 million to improve AGL ERPsystem.
COLLABORATION
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
9/16
TCSs specific role as a system integrator and
to plan, design and build an analytics solutionfor wholesale forecasting, powerful enoughto handle massive data flow.
TCS took over the management of theexisting SAP ERP system, while supportingimplementation of SAP IS-U.
TCS ROLE
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
10/16
TCS provide a comprehensive Application
Maintenance and Outsourcing(AMO) solution.
To reduce operational expenses per customeraccount.
To reduce IT complexity and cost .
To ensure flexibility and scalability.
TCS SOLUTION
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
11/16
TCS proposed its Global Network DeliveryModel(GNDM) to offer AMO service to theclient.
TCS and AGL energy selected SAP HANAtogether with new capabilities which arebeing developed using AGILE softwaredevelopment methodology.
TCS SOLUTION contd.
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
12/16
The SAP HANA platform a combination ofmultipurpose, in-memory software andleading SAP partner hardware.
SAP HANA enables business to query multipletypes of data source in real time atunprecedented speed and volume.
SAP HANA
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
13/16
SAP HANA is reducing IT maintenance costs
Improving data accuracy
Improving AGLs real-time forecastingcapacity.
SAP HANA contd.
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
14/16
Zero-escalation transition and support.
Significant enhancement in the level of ITservices.
Increased efficiency in accessing resource antechnology services.
BENEFITS
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
15/16
Improved productivity
Reduced cost of application maintenance.
Improved operational efficiencies.
Flexibility and scalability of operations withcost proportional to business requirements.
BENEFITS contd.
-
7/29/2019 CASE STUDY AGL Energy Ltd.pptx
16/16