Page 1: Case study 4   project cost management -- ppt slides

Striking the

Balance on CostPROJECT COST MANAGEMENT: A CASE STUDY

- CAANGAY, Ian – CAPARIDA, Harold -

Page 2: Case study 4   project cost management -- ppt slides

DEFINITION

PROJECT MANAGEMENT

Application of knowledge, skills,

tools and techniques to project

activities to meet project

requirements

[A Guide to the Project Management Body of Knowledge (PMBOK Guide)

2000 Edition]

2

Page 3: Case study 4   project cost management -- ppt slides

ABOUT PROJECT COST MANAGEMENT

Allotment of limited monetary and

physical resources to complete the

project

“how much will it cost the performing

organization to provide the product or

service involved?”

3

Page 4: Case study 4   project cost management -- ppt slides

MAJOR PROCESSES

Resource Planning

Cost Estimate

Cost Budget

Cost Control

4

Page 5: Case study 4   project cost management -- ppt slides

SITUATION

XYZ Studios

Software development company

specializing in:

mobile applications

Web-based systems

Database management

Software branding

5

Page 6: Case study 4   project cost management -- ppt slides

SITUATION

Project Manager tasks:

Formal meeting with clients

Define scope and goals

Prepares resource plan

6

Page 7: Case study 4   project cost management -- ppt slides

SITUATION

Development process

Agile methodology

“respond to unpredictability thru

incremental, iterative work cadences

and empirical feedback”

[The Agile Movement – www.agilemthodology.org]

7

Page 8: Case study 4   project cost management -- ppt slides

SITUATION

The Project

8-month deal to develop a

scheduling and booking system

(for a network of massage & therapeutic clinic)

Estimated P800,000 cost for

development, divided every month of

the project

8

Page 9: Case study 4   project cost management -- ppt slides

ISSUES AND CHALLENGES

Resource Plan include:

Work breakdown structure

Timeline for tasks

Member assignment

Cost definition for project phase?

9

Page 10: Case study 4   project cost management -- ppt slides

ISSUES AND CHALLENGES

Downside of Agile methodology

Constant communication with client lead to added/modified features

Deviation from original scope

Unable to progress if modification is undone

Cost on time, manpower, materials?

10

Page 11: Case study 4   project cost management -- ppt slides

ISSUES AND CHALLENGES

Tradeoffs

Stretch timeline: increased cost,

diminish revenues

Weigh-in on cost: invest much or risk

quality of product/service

11