case studies vw parts na
TRANSCRIPT
8/6/2019 Case Studies VW Parts NA
http://slidepdf.com/reader/full/case-studies-vw-parts-na 1/2
Volkswagen – spare parts DiVisionSpare Parts Division cuts Costs and improves Efciency with Wireless Stock Management
System
© 2009 p tx ic. F m m d c ud, v www.psionteklogix.com
The Challenge
V c mu h hh-
dd h , d,
cc, d, m , b.
V h -
hud c h vu. th -
z h b v m-
m h dm v chv dd
fcc. V d m
h cud c h -m
v d huh h vu dv
h otC, d h cmb
h, d cud bc c
sap® r/3® mm m w-
bu.
The Solution
V cd p tx
bud u bcu hhc z h otC u m h
cb h ud b mv
mcc d mu xv.
p tx mmd m
bd u d quc ch
h cd hdhd d vhc
mu m h u v, d
trF mdd h mm
v.
ov 800 hdhd d vhc mu -
m u – cd, c-
d hd m h 900
v d. whu
cv m h vhc mu
m d hch c -
qud, d h c cd,
bcm d cc -
cu d duc chc m- h dv c. th vhc
mu m v d b
h fm chd h c
uh duc chc .
ech dbu vcd b h h
dm cd d bx h
dfc umb h c b cd
b h hdhd m, h h
h m dd. a uch, h c
d h d h d d
h m, duc h
c .
Cmm h cv h
m h bh hdhd d
vhc mu dd h uc-
d ud fm md.
th d hv xc d h
u , c h
ud b v.
Fuhm, c h m b
ud vm h hv-du
qum c u, ud c-
uc v.
a m hd du h -
hu c d bc h m-
m m v h trF mdd
ud c d d d m
c. wh c bcm u-
fc, mmb c cmmuch dc h sap m, u
u hc, -m .
The Benefts
V bf m c
mm m h u
v. a h d m
v h h cc h
m, u--h-cd m d
dc c b md ccd. a
uch, c h c vvd h
chc cdu c b cm
d mmd d, c h m u d h sap m
m u, h u cd ch
cdu.
th m d V
xb h . U-
d c b zd, hu
h d huh d dm-
V’ o p C (otC) k-Bu h c dv – h otC d dch
45,000 d v d c c h b. i h 130,000 qu m c, 60,000 h m cmm
dd . i h dm, v mm cc chv fcc.
“The new data transer solution has increased our productivity tremendously. The enormously time-consuming andcostly process o reporting back to the central system has been eliminated. The system is now ar more accurate,
ecient and, crucially, fexible.” – Stean Boshold, Chie Operator at the Kassel-Baunatal, Original Parts Center,
Volkswagen
Case stUDy
8/6/2019 Case Studies VW Parts NA
http://slidepdf.com/reader/full/case-studies-vw-parts-na 2/2
© 2009 p tx ic. F m m d c ud, v www.psionteklogix.com
“The new data transer solution has increased our productivity tremendously. The enormously time-
consuming and costly process o reporting back to the central system has been eliminated. The system is
now ar more accurate, ecient and, crucially, fexible.” – Stean Boshold, Chie Operator at the Kassel-
Baunatal, Original Parts Center, Volkswagen
v buucc, d hv m
umc cd c -
c h b dd.
th bf d: duc
h v c d -ud d d fcc – hch u
bf h cum hc V-
’ d m d u.
s Bhd c h b-
f h p tx d: “th
d u h cd
u ducv mdu. th -
mu m-cum d c -
c bc h c -
m h b md. th m
m ccu, fc d, cu-
c, xb.” H dd, “ou m u ud h cc, u
ud mj u u. th
qum ud b p tx
uf h qum bu, h -
x d d mu,
u. i h b b h h u
m.”
V h d bu m
m uh chc
x, h p tx fm
bhd . th V -
c m’ mmd h d o t C 2
(otC2) h dbu c, d
h otC3 d
otC4, k-Bu.
Case stUDy