CASE HISTORY DOHA RED LINE NORTH - CONTROL IN EXECUTION OF SYSTEM PERFORMANCE OF CONNECTION AND GASKET Emissione Data Approvazi one Progetto Re v. S. LUPI 27/10/20 14 G. BOMBEN DOHA RED LINE NORTH 1

Upload: stefanolupifamaspa

Post on 16-Apr-2017

57 views

Category:

Environment


1 download

TRANSCRIPT

Page 1: Case history   doha linea red line north en

CASE HISTORYDOHA RED LINE NORTH

-CONTROL IN EXECUTION OF SYSTEM PERFORMANCE OF

CONNECTION AND GASKET  Emissione Data Approvazione Progetto Rev.

S. LUPI 27/10/2014 G. BOMBEN DOHA RED LINE NORTH 1

Page 2: Case history   doha linea red line north en

CASE HISTORY

INTRODUCTION

Fama Spa is an Italian company operating since 1988 in design, certification, manufacture of products for precast lining of tunnels. Fama Spa is specialized  in  the development of sealing systems and a wide range  of  accessories  for  the  connection,  lifting  and  anchoring  systems  for the construction of tunnels with TBM. 

For  the  excavation  of  the  Red Line North di DOHA,  FAMA  SpA  provided gaskets and connection systems.

To complete a strategic path that began with the design and continued with the  certification  through  laboratory  tests,  with  a  campaign  of measurements,  it  was  possible  to document the performance of these products in exercise.

Page 3: Case history   doha linea red line north en

CASE HISTORY

DOHA METRO RED LINE NORTHDESIGN OF THE LINING

- UNIVERSAL RING 6+1- KEY 1/3 OTHER SEGMENT- EX. DIAMETER 6.770 mm- IN. DIAMETER 6.170 mm- THICKNESS OF CONCRETE 300 mm- LENGTH OF CONCRETE 1.500 mm

- ANCHORED GASKET 26 x 17 mm WITH HIDROPHYLIC STRIP

- 19 CONNECTORS FOR RING (3 FOR EACH SEGMENT , 1 FOR THE KEY)- GUIDE BAR AND BOLT ON THE

RADIAL JOINT

Page 4: Case history   doha linea red line north en

CASE HISTORY

EPDM SEALING GASKET

- UG027A

- ANCHORED GASKET 26 x 17 mm WITH HIDROPHYLIC STRIP

- PRESSURE REQUIRED TO CONTRACT 10 bar GAP 5 mm OFFSET 10 mm

Page 5: Case history   doha linea red line north en

CASE HISTORY

CONNECTION SYSTEM

- SMARTBLOCK 90-160/300-60- PULL OUT 90 KN- SHEAR STRENGTH 160 KN- LENGTH 300 mm- DIAMETER OF CENTERING 60 mm

Page 6: Case history   doha linea red line north en

CASE HISTORY

1. We want  to  calculate  the  current  state of misalignment  and  separation of  the  joints between  the segments in the gallery; 2.  The  relief  is  performed with  the use of  two measurement  gauges:  one  for  the depth, with which recalculate the offsets and one for the width of the slots for the recalculation of the gap; 3. The joints are first classified according to the orientation angle to the progress of the excavation; 4. Usually the relief is performed on a continuous succession of five joints, reached by the operator that runs through the tunnel by foot. In case of severe anomalies  the relief  can be conducted on the entire ring with the aid of suitable lifting equipment. The measuring block 5 of  joints may, at the operator's discretion, be repeated several times; 5. The sequence of measurements, if necessary, can be performed on the right side and on the left side of the tunnel with reference to the direction of advance of the excavation; 6. May be conducted in the presence of detections punctual infiltration of water, in order to evaluate if this  is  generated  by  an  excessive misalignment,  or  spreading  of  the  coupling  or,  finally,  from  other causes; 7.  If  necessary  measurements  can  be  performed  on  the  blocks,  facing  the  opposite  of  progress  to compare with those initial misalignment stabilized along the tunnel.

PROCEDURE FOR DETECTION GAP AND OFFSET BETWEEN THE JOINTS IN CONCRETE INTO THE TUNNEL

Page 7: Case history   doha linea red line north en

CASE HISTORY

PROCEDURE FOR DETECTION GAP AND OFFSET BETWEEN THE JOINTS IN CONCRETE INTO THE TUNNEL

The measurements  of  gap  and  offset  are  performed  at  approximately  20 mm from the T joint, where the deviations from nominal are maximums.

MEASUREMENTS OF GAP

MEASUREMENTS OF GAP

Page 8: Case history   doha linea red line north en

CASE HISTORY

PROCEDURE FOR DETECTION GAP AND OFFSET BETWEEN THE JOINTS IN CONCRETE

In the diagrams below are identified types of angles between segments of a same ring adjacent each other refer to the direction of excavation.

Page 9: Case history   doha linea red line north en

CASE HISTORY

PRESENTATION OF RESULTSMEASURES OF GAP IN THE CIRCUMFERENTIAL JOINTS

Page 10: Case history   doha linea red line north en

CASE HISTORY

PRESENTATION OF RESULTSMEASURES OF GAP IN THE LONGITUDINAL JOINTS

Page 11: Case history   doha linea red line north en

CASE HISTORY

PRESENTATION OF RESULTSMEASURES OF OFFSET IN THE CIRCUMFERENTIAL JOINTS

Page 12: Case history   doha linea red line north en

CASE HISTORY

PRESENTATION OF RESULTSMEASURES OF OFFSET IN THE LONGITUDINAL JOINTS

Page 13: Case history   doha linea red line north en

CASE HISTORY

PRESENTATION OF RESULTSPICTURES OF THE TUNNEL

Page 14: Case history   doha linea red line north en

CASE HISTORY

ANALYSIS OF THE RESULTSASSESSMENT OF THE EFFICIENCY OF THE CONNECTION SYSTEMThere have been 294 measurements of gap and offset. 

The average weigth gain of the gap is 0.4 mm, the offset of 1.4 mm.

The requirements of the specifications of the Doha Metro Red Line North provide a mounting tolerance of 5 mm on the opening of the  joint (gap) and 10 mm on the  misalignment  of  the  joint  (offset).  The connection system SmartBlock allowed a mounting error is much lower than expected.

The connection system SmartBlock has minimized the effect of the divergence of the longitudinal and circumferential joints generated by the thrust of the gasket.

The performance of  the pull-out and  shear of  the SmartBlock are  suited  to  the conditions of employment, ensuring the correct dimensioning of the system.

Page 15: Case history   doha linea red line north en

CASE HISTORY

ANALYSIS OF THE RESULTSASSESSMENT OF THE EFFICIENCY OF THE SEALING GASKET

The gallery of the DOHA METRO RED LINE NORTH is dry.

The gasket sealing UG027A has been tested at the University Tor Vergata for the  hydraulic  performance  requirements  in  the  specifications  of  the  project Doha Metro Red Line North.

The gasket UG022A requires a  load of 45 KN/m for its complete compression facilitating, in fact, the permanence of the closed joint.

The geometry of UG022A well balanced between width and height and angles conformed to the geometry of the concrete allow, during assembly of the ring, to remain in its seat.