Strategies for RevitalizationFor an Inner-Ring Suburb
January 24, 2014
Ravi Shah, CBO, Assoc. AIA
![Page 2: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/2.jpg)
Carrollton’s Philosophy:Revitalization is key to a sustainable future
![Page 3: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/3.jpg)
Area 37 square miles
Population (Estimated as of January 2011)
122,100
Average Household Income
$81,795
Average Home Value-a variety of housing types, from single-family, townhouses and apartments
$175,000
Parks
More than 1,200 acres of park land
![Page 4: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/4.jpg)
BACKGROUND & OVERVIEWStrategies for Revitalization
1991: Urban Design Element was added to the Comprehensive Plan
1993: Council adopted the Urban Design Strategy- Citizen Committees formed
- Urban Design Elements added to City’s Development Standards &CIP projects
1994: Council adopted the Corridor Plan - Median Plantings- Traffic Signal Ornamentation- Mast Arm Signage- Entryway Monuments- Railroad Crossing Enhancements- Streetlights Banners- Median Pavers
![Page 5: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/5.jpg)
1995: Council adopted the Corridor Plan Implementation Strategy
1998: First CIP incorporating urban design elements
1999: Neighborhood Enhancement Matching Grant Program Initiated
1999: Old Downtown Intersection Improvements Began
1999: Gateway Monument Program Initiated
1999: Median Beautification Retrofit Program Initiated
2007: Tree Plantings on Corridor Medians Began
![Page 6: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/6.jpg)
2007: TOD Program Initiated
2008: Retail Redevelopment and RehabilitationFaçade Incentives
2010: Updated major aesthetic ordinances
2010: Initiated Project Raiford Vision/ OverlayDistrict
2012: Renewed emphasis on Tree Plantings and
Landscaping on Major Corridors
2012: Multi-Family Redevelopment Initiative Launched
2013: Downtown Square Redesign
2014: Trinity Mills Station Redevelopment
![Page 7: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/7.jpg)
Key components to successful Revitalization
- Clearly defined Design Guidelines and Standards
- Clearly defined Corridor Aesthetic Expectations
- Focused Retail Rehab and Redevelopment Requirements
- Public /Private Partnerships
- High Quality New Development
![Page 8: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/8.jpg)
Clearly Defined Design Guidelines and Standards
![Page 9: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/9.jpg)
Clearly Defined Corridor Aesthetic Expectations
Median Landscaping (GDS) Real Estate Signage Regulation “Sail” Sign elimination Monument Signage Regulation Driveways, Stacking and Loading Detention Pond Aesthetics Roof Top Utility Screening Requirements Exterior Façade Materials Glare Ordinance Window Signage Regulations Screening Walls Landscape Ordinance Amendments Commercial Landscape Code Enforcement Biennial Review of Ordinances
![Page 10: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/10.jpg)
CORRIDOR BEAUTIFICATION PLAN
Amended sign code to prohibit ‘sail signs’. Arterial corridors enhanced, blight removed.
Amended sign code: limits placement of freestanding can signs, improved aesthetics, allowances for performance-based signs.
Updating Article XXV (Landscaping) of the CZO
GDS amended and aesthetic standards created
![Page 11: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/11.jpg)
ELEMENTS
Screen Wall Side Walk Street
Remove small section ofConcrete side walk to allowFor landscaping Plant vines in leave out
SCENARIO 1
Screen walls adjacent to sidewalk with no landscape strip
![Page 12: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/12.jpg)
Old Denton Screening Wall: Before and After:
![Page 13: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/13.jpg)
Belt Line Road Screening Wall: Before and After
![Page 14: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/14.jpg)
Hebron Parkway at Capstone: Before & After
![Page 15: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/15.jpg)
Keller Springs Median Plantings
![Page 16: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/16.jpg)
Retail Redevelopment Projects
Case Study: Randy TwistProject Scope – Façade
Renovation 2501 N Josey Lane
• Total Cost of Exterior Improvements = $600,000
• Total Contribution from City= $123,871
![Page 17: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/17.jpg)
Before:
![Page 18: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/18.jpg)
After:
![Page 19: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/19.jpg)
Before:
![Page 20: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/20.jpg)
After:
![Page 21: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/21.jpg)
Case Study: Shops at Old DentonProject Scope –
Overall Development Rehabilitation2625 Old Denton Rd
• Total Investment = $20 Million
• Exterior Improvements + HVAC = $5.2 Million
• Total Contribution from City= $702,000
![Page 22: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/22.jpg)
Before:
![Page 23: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/23.jpg)
After:
![Page 24: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/24.jpg)
Before:
![Page 25: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/25.jpg)
After:
![Page 26: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/26.jpg)
Before:
![Page 27: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/27.jpg)
After:
![Page 28: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/28.jpg)
Case Study: Cencor ProjectProject Scope – Façade
Renovation 2201 Marsh Lane
• Total Cost of Exterior Improvements = $166,000
• Total Contribution from City = $65,000
![Page 29: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/29.jpg)
Before:
![Page 30: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/30.jpg)
After:
![Page 31: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/31.jpg)
Case Study: Carrollton ParkProject Scope – Façade Renovation Josey Ln & Belt Line Rd
• Total Cost of Exterior Improvements = $1.6 Million
• Total Contribution from City= $168,000
![Page 32: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/32.jpg)
Before:
![Page 33: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/33.jpg)
After:
![Page 34: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/34.jpg)
After:
![Page 35: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/35.jpg)
After:
![Page 36: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/36.jpg)
Case Study: Marsh Keller CrossingProject Scope – Façade Renovation Marsh Lane & Keller Springs
• Total Cost of Exterior Improvements = $530,00.00
• Total Contribution from City = $60,000.00
![Page 37: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/37.jpg)
Before:
![Page 38: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/38.jpg)
After:
![Page 39: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/39.jpg)
After:
![Page 40: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/40.jpg)
After:
![Page 41: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/41.jpg)
Case Study: Kelly PlazaProject Scope – Façade
Renovation Kelly Blvd. & Keller Springs
• Total Cost of Exterior Improvements = $69,480.00
• Total Contribution from City = $64,000.00
![Page 42: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/42.jpg)
Before:
![Page 43: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/43.jpg)
Soon:
![Page 44: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/44.jpg)
Case Study: Randy Twist #2Project Scope – Façade Renovation Josey Lane & Frankford Road
• Total Cost of Exterior Improvements = $262,540.00
• Total Contribution from City = $190,000.00
![Page 45: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/45.jpg)
Before:
![Page 46: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/46.jpg)
Soon:
![Page 47: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/47.jpg)
Retail Streetscape
Case Study: Josey Lane & Frankford Road
![Page 48: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/48.jpg)
Before:
![Page 49: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/49.jpg)
After:
![Page 50: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/50.jpg)
Before:
![Page 51: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/51.jpg)
After:
![Page 52: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/52.jpg)
After:
![Page 53: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/53.jpg)
After:
![Page 54: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/54.jpg)
After:
![Page 55: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/55.jpg)
Tra
nsit
Sys
tem
Map
Future Rail Line
Fut
ure
Rai
l Lin
e
YOUAREHERE
WEAREHERE
![Page 56: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/56.jpg)
![Page 57: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/57.jpg)
Square
IH-35E
Carroll Ave
Vandergriff Dr
Belt Line Road
Carrollton’s 1st TOD and Public/ Private Partnership
![Page 58: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/58.jpg)
![Page 59: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/59.jpg)
5/31/11
![Page 60: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/60.jpg)
8/2/12
![Page 61: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/61.jpg)
Union at Carrollton Square Phase 2
![Page 62: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/62.jpg)
Union at Carrollton Square Phase 2
![Page 63: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/63.jpg)
Frankford Road
Indian Creek G
olf Club
![Page 64: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/64.jpg)
![Page 65: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/65.jpg)
![Page 66: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/66.jpg)
![Page 67: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/67.jpg)
![Page 68: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/68.jpg)
Trinity Mills Transit District is the #1 TOD Development Opportunity in North Texas with
25.5 acres of developable land owned by the City of Carrollton and Dallas Area Rapid Transit.
![Page 69: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/69.jpg)
TRINITY MILLS
Project Raiford
![Page 70: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/70.jpg)
![Page 71: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/71.jpg)
Vision to Design Guidelines
![Page 72: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/72.jpg)
Courtyard by Marriott
![Page 73: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/73.jpg)
New Single Family Neighborhood
![Page 74: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/74.jpg)
Master Developer To Be Announced Soon!
![Page 75: Carrollton's revised strategies for revitalization](https://reader033.vdocuments.mx/reader033/viewer/2022061203/547cf93db4af9fc6188b463a/html5/thumbnails/75.jpg)
Where Connections Happen