caring winter 2012

36

Upload: zestnet

Post on 22-Mar-2016

214 views

Category:

Documents


0 download

DESCRIPTION

Woody Woodburn Refl ects The OLD & The NEW p. 4 No Stranger to DISASTER p.8 EMBRACING the FUTURE Electronic Medical Records p.10 da Vinci ROBOTIC SURGERY p.12 Training PHYSICIANS of the FUTURE p.14The JOY of CARING p.16 WOUND Care p.17I got MY LIFE Back p. 18 CMHS Scans for PATIENT SAFETY p.20 Planned GIVING p.22SWING into Action HEELS & Wheels p. 23CMHS Projects UPDATE p.24 Community Memorial Healthcare Foundation NEWS p.30Ojai Valley Community Hospital Foundation NEWS p.31 CMHS 2010 Annual Report .p.32COMMUNITY @ Community p. 34

TRANSCRIPT

Page 1: CARING Winter 2012
Page 2: CARING Winter 2012

2 CARING | COMMUNITY MEMORIAL HEALTH SYSTEM

Page 3: CARING Winter 2012
Page 4: CARING Winter 2012
Page 5: CARING Winter 2012
Page 6: CARING Winter 2012
Page 7: CARING Winter 2012
Page 8: CARING Winter 2012
Page 9: CARING Winter 2012
Page 10: CARING Winter 2012
Page 11: CARING Winter 2012
Page 12: CARING Winter 2012
Page 13: CARING Winter 2012
Page 14: CARING Winter 2012
Page 15: CARING Winter 2012
Page 16: CARING Winter 2012
Page 17: CARING Winter 2012
Page 18: CARING Winter 2012
Page 19: CARING Winter 2012
Page 20: CARING Winter 2012
Page 21: CARING Winter 2012
Page 22: CARING Winter 2012
Page 23: CARING Winter 2012
Page 24: CARING Winter 2012
Page 25: CARING Winter 2012
Page 26: CARING Winter 2012

2011 2012 2013 2014 2015

PRE-CONSTRUCTIONSite Preparationof New Hospital Site Site Preparation and Excavation

Buy Out / Submittals / Approvals / OSHPD Approvals Footings Foundations Work Basement Walls / 1st Floor Post Installation Verification; Backfill Structural Steel / Welding Elevated Sleds

OFOI Equipment Final Test & Balance; Final Cleaning Superintendent Punch List Punch List; Final Inspection Final Inspections; Substantial Completion Certificate of Occupancy CMHS Moves In

FOUNDATION / STRUCTURE

SITE UTILITY RELOCATIONSite Utilities

GROUND IMPROVEMENTGround Improvement & Shoring Ground Replacement

BUILDING SHELLExterior Skin / Windows Roof

CORRIDOR TIE-INSBasement & First Floor Tie-in Renovations

INTERIOR FINISHES

CLOSEOUT

M.E.P. & Fire Protection Framing Finishes

Page 27: CARING Winter 2012

2011 2012 2013 2014 2015

PRE-CONSTRUCTIONSite Preparationof New Hospital Site Site Preparation and Excavation

Buy Out / Submittals / Approvals / OSHPD Approvals Footings Foundations Work Basement Walls / 1st Floor Post Installation Verification; Backfill Structural Steel / Welding Elevated Sleds

OFOI Equipment Final Test & Balance; Final Cleaning Superintendent Punch List Punch List; Final Inspection Final Inspections; Substantial Completion Certificate of Occupancy CMHS Moves In

FOUNDATION / STRUCTURE

SITE UTILITY RELOCATIONSite Utilities

GROUND IMPROVEMENTGround Improvement & Shoring Ground Replacement

BUILDING SHELLExterior Skin / Windows Roof

CORRIDOR TIE-INSBasement & First Floor Tie-in Renovations

INTERIOR FINISHES

CLOSEOUT

M.E.P. & Fire Protection Framing Finishes

Page 28: CARING Winter 2012
Page 29: CARING Winter 2012
Page 30: CARING Winter 2012
Page 31: CARING Winter 2012
Page 32: CARING Winter 2012
Page 33: CARING Winter 2012
Page 34: CARING Winter 2012
Page 35: CARING Winter 2012
Page 36: CARING Winter 2012