capstone turbine corporation e-finity distributed generation
TRANSCRIPT
Capstone Turbine
E-Finity Distributed Generation The Power to be Independent
Authorized Capstone® Distributor
Capstone Turbine Corporation
Who is Capstone? • Develops • Manufactures • Sells & • Services MicroTurbine Technology
The MicroTurbine Leader
• Founded 1988 • 1st company to introduce a
MicroTurbine • 100% MicroTurbine focused • 7000+ units sold and shipped • Million’s of documented run
hours
50,000,000
Made in America
• “Made in America” • 75+% US Steel • USA owned and operated • >100 Patents Worldwide • ISO 9001:2000 • UL-2200 & 1741 certified
(1) Fuel (4) Benefits Out
1. Reliable Hot Water
2. Reliability Chilled Water
3. Reliable Electricity
4. Reliable Back-Up Power Clean & Green
Local Power Generation
Power When You Need It Where You Need It
E-Finity
E-Finity Distributed Generation The Power to be Independent
Mid-Atlantic & Southeastern Regions
Authorized Capstone® Distributor
E-Finity Actively Supports EPA
Active DOE Clean Energy Member
9
Trade Associations
Factory Certified and Supported
E-Finity Provides Authorized Capstone:
Conceptual Design Approval (CA) Service’s Factory Trained Installer Services (FTI) Authorized Service Provider (ASP) Long Term Maintenance (FPP)
Capstone Technology
Single Stage Jet Engine
• 1750 F Combustion • Recuperated • 3 Air Bearings • “Electronic” Gearbox • Stand-Alone Capability
Single Stage Jet Engine
• 1750 F Combustion • Recuperated • 3 Air Bearings
• 1 moving part: Turbo Generator Shaft
Patented Air Bearing Turbine
Spring
Foil
Shaft
• Air bearings No oil or grease
• Air cooled No anti-freeze or liquids
• Variable speed 45,000 to 96,000 RPM
Worry Free Operation
Lowest Maintenance Available
• Air-Cooled • One Moving Part • Air Cooled Electronics • No Lubricants or Antifreeze • No Spark Plugs / Lifters, etc • Complete Remote Monitoring & Trouble
Shooting • No post-combustion devices or chemicals
Lowest Carbon Footprint
• Low emission design • Super-low NOX
- Less than 9ppm - .14 to .16 g/hb-br
Endorsed by the SCAQMD
• No additional Catalysis requirement
Remote System Diagnostics
• Data Logging & Storage – monitors and records key system
data 24x7 • Real-Time Notification
– alert and local CST Technician notification
• Balance of Plant Interactivity
– monitoring of compressors, water flow and temperatures, etc.
Capstone Products
Capstone Turbine
•C30, C65, C200, C600, C800, C1000 •Natural Gas •Propane •Digester, Landfill and Goal Bed Methane
Simple Modular Solutions
Grid Connect Stand Alone
Dual Mode
CHP App’s
HP Natural Gas
Landfill/Digester Gas
Sour Gas
Liquid Fuel & Propane
30 – 65 kW net output Product Offerings
Simple Modular Solutions
65 kW Heat Recovery
Grid Connect Stand Alone
Dual Mode
CHP App’s
HP Natural Gas
Landfill/Digester Gas
Sour Gas
Liquid Fuel & Propane
200 – 1000 kW net output
Product Offerings
C600 expandable to C800& C1000
Capstone Solutions
Reliable Onsite Electric
Peak Shaving
Load Following
Clean Reliable Back-up Power
- Straight Line 60Hz @ 480 Volts
Integrated CHP Module
Heat Recovery Module
Model C65 MicroTurbine
Integrate with Absorption Chillers
Every C65 MicroTurbine produces 20 Tons Chilled Water Can be Exhaust Fired or Hot Water Fired
C200 with External HRM
Capstone C1000
Hot Water = 500 gpm Chilled Water = 300 Tons Steam = 3500 Mlbs/hr 1000 kW Clean Power
C1000 Series with Heat Recovery
Dual Mode System Controller
Islanding from Utility
• MT Monitors Utility Voltage • Identifies Abnormality • Opens Motorized Breaker • Isolates BLDG from Utility • DMSC verifies Island • MT Sets back to Load State
Less than 5 Seconds
Dual Mode System Controller
Return to Utility
• Upon Utility Return the DMSC • Sends Signal to MT to Start System Timer for
Reconnection (Customer Specified, Generally 5 Minutes)
• MT Disconnects & DMSC Closes Breaker • System Resumes Normal Operation • MT Begins Recharge Mode
MT Never Shuts Down
Factory Support Services
PROPRIETARY AND CONFIDENTIAL Capstone Turbine Corporation 33
Capstone FPP Benefits
• 24 Hour Technical Support
• Response time within 24 hours
• 24 Hour remote monitor and alarming to Capstone and Customer
34
Capstone Remote Monitoring
• Web access to sites • Data Logging • Alarming • Remote trouble shooting • Less windshield time
Capstone Preventative Maintenance
Servicing injectors at 20,000 hrs on a BP platform Capstone MicroTurbine
8,000 Hours
Air Filters Clean/Replace Fuel Filter Replace Igniter Replace
20,000 Hours
Injectors Replace Battery Pack Replace Thermocouple Replace
40,000 Hours
Engine Exchange
• Typical Maintenance cost of $1.00 MTRH • Average of 6 Hours of Planned mtn/Yr • Capstone will guarantee cost of planned
and unplanned maintenance
Simple Overhaul in Minutes
Four Bolts Disconnections Generally (2) 2 hours
Back on Line!
CHP Plus & Minus
Reasons to Encourage CHP
• Lower carbon footprint (EPA) • Power independence (DOE) • Help meet Renewable Energy Portfolio Standard (States) • Funds infrastructure upgrades & improvements • Encourages the use of energy efficiency technologies • Lowers energy costs • Helps keep the door open • Create new Green Job
Barriers inhibiting CHP • Utility standby charges or ratchet penalties • Electric utility discouragement (Cogen Killers) • Incentives with “Open & Close “ window programs • Onerous submission process • 3rd party implementers add layers and costs • Lack of value for net metering (export to grid) • Looses to “Low Hanging Fruit” • Lack of awareness (changing)
Additional Barriers ?? • Interconnection • Permitting • Financing
The biggest one
Lack of Parody for ITC’s
Solar / Wind = 30%
CHP = 10%
70-90% efficient yet the lowest ITC ????
E-Finity Applications
Viking Yacht (NJ Manufacturer)
•NJ Incentive •New Equipment •100% Heating & AC •40% Self Electric Generation •Slashed Carbon Foot Print Barrier > Incentive Challenges
York Sewer Authority (PA WWTF)
• PA DEP Incentive • New Equipment • Renewal Energy Project • $300,000 Savings / Yr • Significant Carbon Savings • 100% US Made Products Plus > Incentive Challenges
Gas Storage Site
Stand-A-Lone Site
•100% Site 3 Phase Power •100% Building Heat & Fuel Gas Heating • (4) C65 ICHP & (5) C65 •1st Commissioned 2006
Industrial Gas Plant
Electric & Hot Water
Combined Heat & Power Fours Seasons Philadelphia
Combined Heat & Power Fours Seasons Philadelphia
• 100% Hot Water • 25% Building Electric • 15% Building Heat
Emphasis was on:
•Controlling Energy Costs •Reduce Greenhouse-Gas
Emissions
Tri-Generation Philadelphia Gas Works
• Capstone C200 Turbine
• Hot Water Heat Exchanger
• 40 Ton Hot Water Absorber
• Capstone Logic Controller
Electric Load Following UGI Headquarters
PPL Utility Meter set at 0kW Capstone Makes 100% of Building Electric
Combined Heat & Power Bristol Bridge
•100% Building Electricity •100% Building Hydronic Heat •Future 90Tons Absorption Chilling
Islanding Capable Dedicated Back Up Power
for Exhaust Hood Containing Dangers
Fumes
Heating / Cooling/ Islanding CHP Salem College, New Jersey
Red Cross Disaster Relief Facility
•195kW Electric Load Following •100% Hot Water •100% Chilled Water •Island / Stand Alone Site
Questions & Answers