capital summit 2015: tirana - strategic projects
TRANSCRIPT
BASHKIA TIRANË
Municipality Tirana
STRATEGIC PROJECTS
APRIL 2015
Strategic Projects
1. Tirana Northen Boulevard and River Project
2. Multimodal Terminal
3. Light Rail System (LRS )Tram
4. Tirana Techno - Park
5. Tirana Public Lighting Project
6. Energy Efficency Project
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Description
885 Ha
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Phase I
The Southen section of the
boulevard
885 Ha
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Description
River Project
885 Ha
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Description
885 Ha
The northen section of boulevard
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Goals
2000 jobs directly
21.000 employees
43.000 habitants
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Extension of the Boulevard
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
6 Squares
2
4
6
3
5
1
6 squares
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Square connector
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Merchant Square
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Square of Justice
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Cultural Square
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Youth Square
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Square connector with the river
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Square connector with the river
TIRANA NORTHEN BOULEVARD AND RIVER PROJECT
Current status
Phaze I On september 6, 2013 with a
value of 26 mln Euro
Phaze II On January 17, 2014
with a value of 12,8 mln Euro
Blocked by central
Goverment
MULTIMODAL TERMINAL
Description
MULTIMODAL TERMINAL
Locat ion
M U L T I M O D A L T E R M I N A L
F u n c t i o n a l O r g a n i z a t i o n
1 . Rai lway s ta t ion ( t ram -t ra in )
2 . B u s T e r m i na l
3 . P a s s e n g e r T e r m i n a l
4 . Suppor t serv ices center
MULTIMODAL TERMINAL
GOALS
MULTIMODAL TERMINAL
GOALS
Integration of the public transport lines
Coverage of 75% of inter-urban traffic
Coverage of 75% of inter-urban traffic
Increasing of the public transport commodities
Road safety
Employment Opportunities
MULTIMODAL TERMINAL
Benefits
Benefits
MULTIMODAL TERMINAL
6 tone CO2 less / day
Reduction of noise pollution
3,1 km occupied space
2.500 litra/ less oil / day
psychological stress reduction
MULTIMODAL TERMINAL
Current status
M a y 2 0 1 4
Concession procedure
Diagram PPP
Va lue 40 mi l ion euro
Blocked by central
Goverment
TRAM
Description
TRAMI
2 Lines
Line 2 “East- West (Kinostudio-Kombinat)
Line1 “North- South” (Square i Nënë Tereza- city-multimodal Terminal
-length 7.2 km
-about 70,000 passenger/day.
-length 8,4 km
-about 90,000 passenger/day
T R A M
G o a l s
Increase the number o f passengers
who use pub l ik t ranspor t
Rel iable pub l ic t ransport
Rapid Transporta t ion
Bloced by centra l
goverment
TRAM
Benef i ts
Reduce a i r no ise leve l and improvement o f the leve l o f CO2 in the c i ty
To reduce opera t ing cots and reduce the number o f road acc idents
R e duc e t r a v e l t im e a nd inc r e a s e c om f or t in t r a v e l
C ons t ruc t ion o f t he l ine K inos t ud io - Kombinat , l e ng t h 9 .5 k m
Pr ov ide s t ha i t in t he f i r s t pha s e o f t r a ns por t one 9 0 .0 0 0 pa s s a nge r / da y
Description Tirana LRT
The feasibility study and project desing
dor line 2
Value 155,5 milion EUR
68,6 milion passenger / year
Blocked by central goverment
TIRANA TECHNO - PARK
Description
30.000 m2
TIRANA TECHNO - PARK
GOALS
Absorpt ion of labor and inte l lectual
The improvement o f research resources and o ther serv ices
Ma na ge m e nt o f l a r ge t r a c t s o f l a nd
Large investments c rash
S t r e n t hn ing t he loc a l e c onom y a nd in t e r na t iona l
TIRANA TECHNO - PARK
Statusi Aktual
January 2014 Feasibi l i ty study
Land for construct ion of techno park
Energy Efficency Project Benefits
45% of the road network
Energy Efficency Project Benefits
Menaging d ig i ta l l ight ing
The improvement of the quality of l ight ing
R e duc ing e ne r gy c ons um pt ion in
pub l i c l igh t ing in m e a s ur e 4 5 %
Energy cost reduction
Lowering the cost of maintenance
Ti t le to the CO 2 reduct ion
Energy Efficency Project Benefits
Energy Efficency Project
Benefits
Thank you !
BELGRADE, 23 April 2015