capital markets day – 31 q1 financial presentation 2012 st ... 2012/2.dofs_apa… · 11 weeks...
TRANSCRIPT
• Q1 Financial Presentation 2012
DOF ASA Presentation Capital Markets Day – 31st May 2012
Asia Pacific Region
1
DOF ASA
1. Introduction to our Asia Pacific operations 2. Vessel management operations and supply 3. Subsea in Asia Pacific 4. Subsea project execution 5. Subsea projects building value 6. Regional market outlook
DOF ASA
Introduction to our Asia Pacific Operations
DOF Asia Pacific is...
Rapidly growing to be a leading provider of the complete range of integrated subsea and marine support and construction services.
With a world-class fleet of offshore vessels and subsea intervention systems ... and a dedicated team of professionals – on and off shore.
DOF ASA 4
DOF Asia Pacific has...
Delivered a strong track record in providing ‘life of field’ solutions.
A reputation of being responsive, flexible and collaborative with our clients.
With a recognised region leading performance and safety culture.
DOF ASA 5
DOF Asia Pacific is...
Leveraging off the success and client base of the subsea business to rapidly expand offshore marine operations in the region utilising regional group resources across all of our market sectors.
DOF ASA 6
DOF Asia Pacific - Delivers Life of Field Services
DOF ASA 7
Strategically Located
DOF ASA 8
7 Strategic regional locations
High Quality Professional Team
DOF ASA 9
250 Onshore engineering, operations and support staff
151
17
20
42
20 Projects
HSEQ
Business Acquisition Finance and Support Marine Operations
Capable Assets
DOF ASA 10
9 Vessels in Operation
May 2012
We provide key services
Supply and AHTS
Project Management and Engineering
Vessel Operations
Survey and Inspection
Subsea Construction
ROV Operations
Diving Operations
Life of Field Services
DOF ASA 11
Integrated marine and subsea operations
Vessel Management Operations and Supply
DOF ASA 12
Regional Marine Operations and Supply
DOF ASA 13
• Starting to generate real traction in the region with recent long term placements
• Vessel management operation in Singapore with Chartering office in Melbourne Australia
• Recently appointed Gary Kennedy to regional DOF Management EVP to be based in Perth to develop a strong presence in the Australian market
• Transitioning from 3rd party crews in Australia to DOF employed crew to improve margins and operability across both supply and subsea fleet
Regional Supply Fleet – May 2012
DOF ASA 14
AHTS Skandi Pacific
Talisman Vietnam August 2012
PSV Skandi Falcon
MacDow Australia September 2013
AHTS Skandi Atlantic
Apache Energy Australia October 2014
Excludes optional periods
Leveraging Supply and Subsea
DOF ASA 15
• With strong Supply and Subsea business units DOF is in a unique position to leverage a strong market position
• Skandi Hawk PSV owned by DOF
• Subsea business able to generate higher income
• Cross traded in Subsea and Supply market sectors to generate highest possible utilisation and return
• Now implementing closer sharing of regional resources to maximise productivity and efficiency
Subsea in Asia Pacific
DOF ASA 16
Subsea Projects
Project Management
and Engineering
Survey and Positioning
Diving Operations
HSEQ
ROV Operations
Subsea Vessel Fleet
A Genuine Integrated Service Provider
DOF ASA 17
• We provide ‘life-of-field’ services • front-end site investigation
• construction and installation
• inspection repair and maintenance
• field abandonment and decommissioning
• We integrate our services to meet client requirements with minimal use of 3rd parties
• We have a demonstrable track record across the complete ‘life of field’ timeline
Our Services are Accredited
DOF ASA 18
Global business management system accredited by DNV to: – Business Management System - ISO 9001: 2008
– Health and Safety System - OHSAS 18001:2007
– Environmental Management System - ISO 14001:2004
Underpinned by our Code of Business Conduct and our Values
2009
Values
DOF ASA 19
Our Values Define Who We Are
… And How We Operate
• INTEGRITY
• RESPECT
• TEAMWORK
• EXCELLENCE
• and above all we are… SAFE
We work with our clients to our values…
We are not and have never been a mercenary business when dealing with our clients and that has allowed us to develop
lasting business relationships.
Our reputation generates significant repeat business and this is one of our most
valuable assets
January 2006 January 2011 May 2012
Subsea IRM and Construction
Geotechnical and Geophysical Survey
Coastal
Term Charter
Regional Subsea Capability Growth
DOF ASA 20
Increase in subsea fleet capacity and capability over last 12 months
The Regions Best Subsea Vessels
DOF ASA 21
Subsea Life of Field Services
DOF ASA 22
Our PM&E capability is engaged across all life of
field activities
Front End
DOF ASA 23
• Route survey
• Pre and post lay survey
• Bathymetric/Geophysical mapping
• Data processing and interpretation
• Subsea positioning / Metrology
• 3D Visualisation software
• Geotechnical coring
• Environmental services
Inspection Repair and Maintenance
DOF ASA 24
• Diving Operations
• ROV Operations
• Pipeline / Structure inspection
• Anode replacement
• Flying lead / jumper replacement
• Pipeline freespan correction
• Data gathering, reporting and management
IRM Philippines May 2012
DOF ASA 25
IRM Philippines May 2012
DOF ASA 26
Construction and Abandonment
DOF ASA 27
• FPSO/ Mooring installations
• Diver and ROV based solutions
• Installation of umbilicals, risers and flowlines (SURF)
• Subsea spool / structure installation
• Infield support vessels
Subsea Project Execution
DOF ASA
DOF Subsea undertakes technically complex fast track projects
DOF ASA 29
BHP Billiton Stybarrow H4, Remediation Project
DOF ASA 30
Problem to be solved
• North West Shelf Australia
• Blocked 8” flexible flow line requiring replacement
• Deep water 820m
• Production critical
• Environmental concerns
DOF ASA 31
Scope of work
• Project Management and Engineering
• Design and build a Horizontal Lay System
• Transport and installation of 8” flexible
• Disconnect existing 8’ flexible
• Install new flow line and jumpers
• Testing and commissioning
• Permanently abandon existing flow line
DOF ASA 32
Schedule
DOF ASA 33
Period Description
8th July 2011 Commenced pre engineering
6th September 2011 Contract award
10th November 2011 Offshore mobilisation
28th December 2011 Project complete and demobilised
Marine Spread – Skandi Hercules
DOF ASA 34
Design of a horizontal lay spread to install flexible product in 820m
DOF ASA 35
Engineering for a worlds first remote subsea disconnect of a standard API flange
DOF ASA 36
Flushing and riser cleaning of hydrates and sand deposits
DOF ASA 37
Recovery of existing riser and hang-off on deck
DOF ASA 38
Jumper transpooling on empty drum before deployment
DOF ASA 39
Tie in of new flowline to the wellhead
DOF ASA 40
Outcome
• All project objectives met
• Deepest Wellstream flexible laid by Horizontal Lay System
• Great Safety culture • “Text book example of how it
should be done”
• Horizontal lay system owned by DOF
DOF ASA 41
ConocoPhillips Belenak FSO Installation
DOF ASA 42
Scope of Work
• Natuna Sea Indonesia
• Tow Belenak FSO to site
• Reconnect FSO to moorings
• Saturation diving
• Install new risers
• Install power umbilical
• Commissioning and Testing
DOF ASA 43
Schedule
DOF ASA 44
Period Description
24th August 2011 Commenced pre engineering
4th November 2011 Offshore mobilisation
1st December 2011 Project complete and demobilised
Marine Spread – Skandi Singapore
DOF ASA 45
Riser installation system
DOF ASA 46
Mooring chain lengthening and hook-up
DOF ASA 47
Installation of risers
DOF ASA 48
Installation of power umbilical
DOF ASA 49
Outcome
• All project objectives met
• Project completed ahead of schedule
11 weeks from LOI to completion
• Great Safety outcome
“688 safety interactions with no lost time”
DOF ASA 50
Subsea Projects Building Value
DOF ASA
Subsea projects business building underlying value
Reduced engineering effort and equipment expenditure
Reduced lead times
Improved competitiveness
Improved margins
DOF ASA 52
• Development of sound processes and systems to understand and operate the business • Finance, HSEQ, Project Management and Engineering
• Retention of corporate knowledge vital to progressively improving margins • Ensuring engineering developed on a project is retained and easily accessible for use on
similar future projects
• Ensuring installation equipment designed and built for a project is “multi use” and built to last
Experience
Regional Market Outlook
DOF ASA
Regional Market Overview
DOF ASA 54
• The Australian market is strong at the moment with a large number of major LNG projects commencing or gaining approval to proceed and the drilling market strengthening. We envisage an upward demand for the larger modern AHTS, PSV and Subsea vessels that are capable of operating in the deeper and harsher waters of the region.
• The South East Asian market is now seeing a gain both in vessels operating and the rates obtained.
• The more deep water projects are seeing an increase in demand for the higher horsepower AHTS and larger PSV that suit our fleet makeup.
• Continual tightening of HESQ and technical requirements to align with global E&P company standards continues to drive demand for our Subsea services.
• Tendering is now prolific and we expect to see ongoing positive results for our efforts.
Regional Offshore CAPEX - Country
DOF ASA 55
0
5000
10000
15000
20000
25000
30000
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
PNG
New Zealand Australia
Other Asia Vietnam
Indonesia
Thailand
Currency USDm Source – Infield
Country 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 China 1853 2198 2443 2288 2645 3463 3357 2929 2214 1620 Malaysia 1466 2426 2063 2741 2692 3727 4359 3043 3246 3256 India 2069 1884 2233 2043 1751 2890 2440 2624 2748 2472 Thailand 2219 1946 1987 1246 1712 1332 1808 1794 1353 1574 Indonesia 2987 1778 1013 860 1541 1801 1991 2499 3013 3115 Vietnam 621 672 1016 1010 1756 2152 2347 2446 1904 1374 Other Asia 735 1014 884 924 1297 2379 2630 2404 1908 2912 Australia 1629 1792 1770 2388 2617 3051 3937 6885 9885 10737 New Zealand 183 512 293 34 33 33 137 167 38 0 PNG 0 0 0 0 0 38 173 795 1148 762
Regional Offshore CAPEX - Market
DOF ASA 56
Currency USDm Source – Infield
0
5000
10000
15000
20000
25000
30000
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Subsea Completion
Pipeline
Floating Platforms
Fixed Platforms
Control Line
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Control Line 323 400 305 208 319 768 848 701 811 674 Fixed Platforms 3661 4212 4266 5004 6377 6465 5982 6411 6706 6416 Floating Platforms 1541 1368 1074 1180 1691 1807 2352 3345 3884 3763 Pipeline 7723 7131 6888 6141 6868 11093 11882 12992 13472 14331 Subsea Completion 514 1111 1170 1001 789 732 2114 2140 2585 2638
In Summary
DOF ASA 57
• DOF has a clear objective to continue to build a large multi-disciplined regional business.
• We continue to implement a plan that’s all about incremental growth within the region underpinned by outstanding world class assets, employees and systems… Safely
Subsea Company of the Year 2012 - Australia
DOF ASA 58
• Awarded Friday 25 May by Subsea Energy Australia
• Sponsored by Woodside
• Acceptance Criteria
• Commercial performance
• Evidence that the company is visionary
• Evidence and quality of strategic thinking and practice
• Evidence of people development
• Evidence of a strong leadership culture
• Commitment to HSE
• Finalists – Aker Solutions, GE Oil and Gas, and DOF Subsea