Request for Determination of Applicability Capital Improvement Project 19-92 Central Avenue over Neponset River Bridge Preservation Boston, Massachusetts June 24, 2020 Applicant: Boston Public Works City of Boston, MA 1 City Hall Square Room 714 Boston, Massachusetts 02201

Upload: others

Post on 10-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

Request for Determination of Applicability

Capital Improvement Project 19-92

Central Avenue over Neponset River

Bridge Preservation Boston, Massachusetts

June 24, 2020

Applicant:

Boston Public Works

City of Boston, MA

1 City Hall Square

Room 714

Boston, Massachusetts 02201

Page 2: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

Contents

WPA Form 1 – Request for Determination of Applicability .......................................................................... 1

Attachment A Project Narrative ................................................................................................................... 5

1.0 Introduction .................................................................................................................................. 5

2.0 Site Overview ................................................................................................................................ 6

Wetland Resources ............................................................................................................................... 6

Massachusetts Natural Heritage & Endangered Species Program ....................................................... 6

Stormwater Critical Areas ..................................................................................................................... 6

Federal Emergency Management Agency ............................................................................................ 8

3.0 Proposed Activities ....................................................................................................................... 9

4.0 Abutters ...................................................................................................................................... 10

Attachment B Project Plans

Attachment C Abutters List, Affidavit of Service and Abutter Notification

Page 3: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

wpaform1.doc Page 1 of 4

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands

WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40

BOSTON City/Town

A. General Information

Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.

1. Applicant:

BOSTON PUBLIC WORKS DEPARTMENTName

[email protected] E-Mail Address

1 CITY HALL SQUARE ROOM 714 Mailing Address

BOSTON City/Town

MA State

02201-2024 Zip Code

617-635-4900Phone Number Fax Number (if applicable)

2. Representative (if any):

Firm

Contact Name E-Mail Address

Mailing Address

City/Town State Zip Code

Phone Number Fax Number (if applicable)

B. Determinations

1. I request the BOSTONConservation Commission

make the following determination(s). Check any that apply:

a. whether the area depicted on plan(s) and/or map(s) referenced below is an area subject tojurisdiction of the Wetlands Protection Act.

b. whether the boundaries of resource area(s) depicted on plan(s) and/or map(s) referencedbelow are accurately delineated.

c. whether the work depicted on plan(s) referenced below is subject to the Wetlands Protection Act.

d. whether the area and/or work depicted on plan(s) referenced below is subject to the jurisdiction of any municipal wetlands ordinance or bylaw of:

Name of Municipality

e. whether the following scope of alternatives is adequate for work in the Riverfront Area asdepicted on referenced plan(s).

GILL ENGINEERING ASSOCIATES, INC.

PRESTON HUCKABEE [email protected]

63 KENDRICK STREET

NEEDHAM MA 02494

781-355-7100

Page 4: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

wpaform1.doc Page 2 of 4

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands

WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40

BOSTON City/Town

C. Project Description

1. a. Project Location (use maps and plans to identify the location of the area subject to this request):

CENTRAL AVENUE OVER NEPONSET RIVER Street Address

BOSTONCity/Town

N/A (PUBLIC WAY) Assessors Map/Plat Number

N/A (PUBLC WAY) Parcel/Lot Number

b. Area Description (use additional paper, if necessary):

SEE ATTACHED DESRIPTION (SECTION 1.0 - INTRODUCTION AND SECTIONS 2.0 - SITE OVERVIEW)

c. Plan and/or Map Reference(s):

SEE CAPITAL IMPORVEMENT PROJECT 19-92 CENTRAL AVENUE OVER NEPONSET RIVER BRIDGE PRESERVATION PERMIT PLANS

6/15/20 Date

Title Date

Title Date

2. a. Work Description (use additional paper and/or provide plan(s) of work, if necessary):

SEE ATTACHED DESCRIPTION (SECTION 3.0 - PROPOSED ACTIVITIES)

Page 5: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

wpaform1.doc Page 3 of 4

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands

WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40

BOSTON City/Town

C. Project Description (cont.)

b. Identify provisions of the Wetlands Protection Act or regulations which may exempt the applicantfrom having to file a Notice of Intent for all or part of the described work (use additional paper, ifnecessary).

SEE ATTACHED DESCRIPTION (SECTION 2.0 - SITE OVERVIEW)

3. a. If this application is a Request for Determination of Scope of Alternatives for work in theRiverfront Area, indicate the one classification below that best describes the project.

Single family house on a lot recorded on or before 8/1/96

Single family house on a lot recorded after 8/1/96

Expansion of an existing structure on a lot recorded after 8/1/96

Project, other than a single family house or public project, where the applicant owned the lot before 8/7/96

New agriculture or aquaculture project

Public project where funds were appropriated prior to 8/7/96

Project on a lot shown on an approved, definitive subdivision plan where there is a recorded deed restriction limiting total alteration of the Riverfront Area for the entire subdivision

Residential subdivision; institutional, industrial, or commercial project

Municipal project

District, county, state, or federal government project

Project required to evaluate off-site alternatives in more than one municipality in an Environmental Impact Report under MEPA or in an alternatives analysis pursuant to an application for a 404 permit from the U.S. Army Corps of Engineers or 401 Water Quality Certification from the Department of Environmental Protection.

b. Provide evidence (e.g., record of date subdivision lot was recorded) supporting the classificationabove (use additional paper and/or attach appropriate documents, if necessary.)

Page 6: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade
Page 7: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

5

Attachment A Project Narrative

1.0 Introduction

The City of Boston proposes to perform bridge preservation work on Central Avenue over Neponset River in

Boston, MA.

The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

their condition. The proposed work is intended to improve the current level of serviceability to extend the service

life of the existing bridge. The length of the project is approximately 135 feet.

The project area for this RDA filing is shown on the locus map (Figure 1).

Figure 1 – Project Locus Map

Bridge No. B-16-024

= M-25-003

N

Page 8: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

6

2.0 Site Overview

Using the locus and available maps, GIS data layers from the Commonwealth’s Office of Geographic Information

(MassGIS) were overlaid on the project locus to determine the presence/absence and general location of

environmental resources within, adjacent and proximate to the “Central Avenue over Neponset River” project

limits in Boston.

Wetland Resources

As shown in Figure 2 and 3, the proposed work is located mainly above, but also adjacent to, resource areas

associated with Neponset River. Specifically, repairs to the existing superstructure will occur within the 100-foot

buffer zone of Bank and the 25-foot Riverfront area. There will be no impacts within Neponset River (Land Under

Water, or LUW). The presence and types of wetlands located in the immediate surrounding region of the project

site are shown in Figure 2 and 3.

For work within riverfront:

As stated in 310 CMR 10.58(6)(a), work within riverfront is defined as: “Any excavation, structure, road,

clearing, driveway, landscaping, utility line, rail line, airport owned by a political subdivision, marine cargo

terminal owned by a political subdivision, bridge over two miles long, septic system, or parking lot within

the riverfront area in existence on August 7, 1996. Maintenance of such structures or areas is allowed

(including any activity which maintains a structure, roads (limited to repairs, resurfacing, repaving, but not

enlargement), clearing, landscaping, etc. in its existing condition) without the filing of a Notice of Intent

for work within the riverfront area, but not when such work is within other resource areas or their buffer

zones except as provided in 310 CMR 10.58(6)(b). Changes in existing conditions which will remove, fill,

dredge or alter the riverfront area are subject to 310 CMR 10.58, except that the replacement within the

same footprint of structures destroyed by fire or other casualty is not subject to 310 CMR 10.58.”

Massachusetts Natural Heritage & Endangered Species Program

According to related MassGIS data layers, the project site is not located within a Priority Habitat or Estimated

Habitat of rare species. There are 8 Certified Vernal Pools and approximately 44 Potential Vernal Pools in the

City of Boston; all of these land features, however, are distant from the project site. Work activities will not be

occurring in any territory designated as an Area of Environmental Critical Concern (ACEC), Outstanding Resource

Water (ORW), Zone II Approved Wellhead Protection Area, Interim Wellhead Protection Area (IWPA), or Barrier

Beach). Much of the information contained in this section is illustrated in figure 2 and 3.

Stormwater Critical Areas

Based on the MassGIS datalayers, the bridge superstructure to be repaired crosses Neponset River, however, no

work will be performed in the water on this project. The project consists of repairing the bridge superstructure

(steel beams, concrete deck and appurtenances) that crosses over Neponset River. The proposed repair work is

not located within any stormwater critical areas or area of critical environmental concern.

Page 9: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

7

Figure 2 - MassDEP Wetland Map

Bridge No. B-16-024

= M-25-003

Page 10: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

8

Figure 3 – Massachusetts Municipal Boundary Lines

Federal Emergency Management Agency

The online Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRM) for the City of

Boston, Massachusetts, Suffolk County, were reviewed. The project will not result in any net fill within the

floodplain. The FEMA Flood Zones located at the project site and the immediate surrounding region are shown in

Figure 4.

Bridge No. B-16-024

= M-25-003

Page 11: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

9

Figure 4 – FEMA Flood Map

3.0 Proposed Activities

Repair work will be performed on Bridge No. B-16-024 = M-25-003, Central Avenue over Neponset River.

The proposed repair work covered under this RDA filing includes removal of the existing pavement wearing surface

on the bridge, scarification of the top surface of the existing bridge deck by hydrodemolition, placement of a new

cement concrete wearing surface on the bridge deck, cleaning and painting of the existing structural steel beams

with some minor structural steel repairs, replacement of the existing bridge expansion joint seals, minor concrete

repairs to the existing bridge substructure and resurfacing the roadway approaches within 25 feet of the bridge

ends.

Page 12: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

10

The repairing of the existing superstructure will require that the Contractor perform this work in accordance with

City of Boston specifications concerning environmental protection and monitoring. The Contractor shall be

required to comply with all Federal, State and municipal laws, regulations and ordinances that require protection

of the environment, including laws and regulations whose purpose is to prevent contamination and pollution of

the air, water and soil in and surrounding the work site, where lead paint being removed from a bridge under this

contract is subject to abatement, containment, transportation and disposal. There will be no work in the river or

on the bank of the river. The contractor will provide full containment for the painting and abutment work and no

debris or materials will be permitted to fall into the water.

As currently proposed, all work on this project is on the bridge structure. No work will be performed directly in

the water or below existing ground level. Therefore, the need for an EPA NPDES Stormwater Construction General

Permit is not anticipated.

It is respectfully requested that the Boston Conservation Commission issue a Negative Determination with

conditions as deemed appropriate, thereby allowing the project to proceed in the absence of the preparation and

filing of a Notice of Intent.

4.0 Abutters

As shown in Figure 5 and 6, property boundaries according to the most recent information from the Assessing

Departments are shown. Abutters within 300 feet of the project property line are highlighted and will be

notified of the proposed project (Information shown in Figure 7).

Page 13: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

11

Figure 5 – City of Boston Assessing Department Map

Bridge No. B-16-024

= M-25-003

Page 14: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

12

Figure 6 – Town of Milton Assessing Department Map

Bridge No. B-16-024

= M-25-003

Page 15: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

Figure 7 – Abutter Information

Abutters List for Bridge Preservation on Central Ave

CITY OF BOSTON

PARCEL ID LOCATION LOCATION CITY LOCATION ZIPCODE OWNER MAILING ADDRESS MAILING CITY/STATE MAILING ZIPCODE

1704030000 84 100 RIVER ST MATTAPAN 02126 TRINITY RIVER ST LP/MASS LP 75 FEDERAL ST 4TH FL BOSTON MA 02110

1704030001 82 RIVER ST MATTAPAN 02126 EIGHTY-2 RIVER STREET LLC 82 RIVER ST DORCHESTER MA 02126

1704031000 CENTRAL AV MATTAPAN 02126 COMMWLTH OF MASS CENTRAL AVE MATTAPAN MA 02126

1704031010 1241 -1255 ADAMS ST DORCHESTER 02124 BAKER SQUARE CONDO TRUST 6 FANEUIL HALL MKTPLACE BOSTON MA 02109

1704037001 CENTRAL AV MATTAPAN 02126 BOSTON EDISON CO MASS PO BOX # 270 HARTFORD CT 06141

1704038000 12 CENTRAL AV MATTAPAN 02126 BOSTON EDISON CO MASS CORP PO BOX # 270 HARTFORD CT 06141

1704039000 70 RIVER ST MATTAPAN 02126 SUNOCO LLC 1900 DALROCK ROAD ROWLETT TX 75088

1704042100 52 R RIVER ST MATTAPAN 02126 LONGDEN REALTY LLC 156 HAYWARD ST BRAINTREE MA 02184

1704042010 54 R RIVER ST MATTAPAN 02126 FIFTY 4R RIVER STREET 54R RIVER ST MATTAPAN MA 02126

TOWN OF MILTON

abutters_id_fieldabutters_owner1 abutters_owner2 abutters_address abutters_town abutters_state abutters_zip abutters_bookpage abutters_location

E 21 11 ONEILL CENTRAL AVENUE LLC 46 COLUMBINE RD MILTON MA 02186 27193-64 20-34 CENTRAL AV

E 23 23 TAMULYNAS ANDREW & JESSICA L 136 ELIOT ST MILTON MA 02186 32313-240 136 ELIOT ST

E 23 24 VIN-JON LLC 260 LYMAN ROAD MILTON MA 02186 34068-392 37 CENTRAL AV

E 23 25 ISSNER AVERY L TRUSTEE DOROTHY F ISSNER 472 DUDLEY RD NEWTON MA 02459-2813 26534-52 25-29 CENTRAL AV

E 24 46 131 ELIOT STREET LLC 1859 DORCHESTER AVE DORCHESTER MA 02124 37281-493 131 ELIOT ST

E 4 1 ONEILL EDWARD T 91 ALLERTON RD MILTON MA 02186 4605-724 10 CENTRAL AV

E 4 2 95 ELIOT STREET LLC C/O JANET FALLON PLOTNER 9 HIGHLAND COURT NEEDHAM MA 02492 32245-513 93 ELIOT ST

E 8 1 KELLY JOHN M & NANCY J 7 MORTON RD MILTON MA 02186 21313-4 7 MORTON RD

E 4 3 DEPARTMENT OF CONSERVATION & RECREATION 251 CAUSEWAY ST SUITE 900 BOSTON MA 02114-2138 0 ELIOT ST

E 24 48 TOWN OF MILTON CONSERVATION 525 CANTON AV MILTON MA 02186 5435-189 ELIOT ST

Page 16: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

Attachment B Project Plans

Page 17: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

CAPITAL IMPROVEMENT PROJECT 19-92CENTRAL AVENUE OVER NEPONSET RIVER

BRIDGE PRESERVATION

PROJECT LOCATIONBR. NO. B-16-24=M-25-3

1. TITLE SHEET

2. GENERAL PLAN AND NOTES

3. STAGING

4. DECK & SIDEWALK REPAIRS

5. JOINT REPAIRS

6. SUBSTRUCTURE REPAIRS

7. BACKWALL AND BEARING REPAIR

8. TTCP (1 of 2)

9. TTCP (2 of 2)

CITY OF BOSTONPUBLIC WORKS DEPARTMENT

HONORABLE MARTIN J. WALSH - MAYORCHRIS OSGOOD - CHIEF OF STREETS, TRANSPORTATION AND SANITATION

PLAN INDEX

SHEET NO. DESCRIPTION

DATE

APPROVED:

CHIEF OF STREETS, TRANSPORTATION, AND SANITATION

Page 18: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

\\G

ILLS

ER

VE

R2\G

illE

ng\B

OS

TO

N\S

TA

TE

O

F G

OO

D R

EP

AIR

\B

oston B

16024 C

entral A

ve over N

eposet R

iver\D

WG

\B

16024 C

EN

TR

AL A

VE

NU

E.dw

g

AutoCAD SHX Text
BEARINGS SOUTH ABUTMENT
AutoCAD SHX Text
NEPONSET RIVER
AutoCAD SHX Text
CENTRAL AVENUE
AutoCAD SHX Text
BEARINGS NORTH ABUTMENT
AutoCAD SHX Text
53+00
AutoCAD SHX Text
STA. 52+50.31
AutoCAD SHX Text
STA. 53+42.81
AutoCAD SHX Text
CONSTRUCTION AND PGL
AutoCAD SHX Text
16'-0"
AutoCAD SHX Text
16'-0"
AutoCAD SHX Text
16'-0"
AutoCAD SHX Text
16'-0"
AutoCAD SHX Text
12'-0"
AutoCAD SHX Text
12'-0"
AutoCAD SHX Text
EXISTING GRANITE PAVERS
AutoCAD SHX Text
GRANITE CURB
AutoCAD SHX Text
GRANITE CURB
AutoCAD SHX Text
EXISTING FOOTING
AutoCAD SHX Text
BRIDGE EXPANSION JOINT. REMOVE EXISTING COMPRESSION SEAL AND REPLACE WITH PRE-COMPRESSED JOINT SEAL.
AutoCAD SHX Text
NEPONSET TRAIL
AutoCAD SHX Text
NEPONSET TRAIL
AutoCAD SHX Text
EXISTING HIGHWAY GUARDRAIL (TYP.)
AutoCAD SHX Text
EXISTING FOOTING
AutoCAD SHX Text
PAVEMENT SAWCUT AT END OF DECK
AutoCAD SHX Text
END POST (TYP.)
AutoCAD SHX Text
BRIDGE RAILING TYPE AL-3 POST (TYP.)
AutoCAD SHX Text
LIMIT OF WORK MILL AND PAVE STA. 53+70.65
AutoCAD SHX Text
LIMIT OF WORK MILL AND PAVE STA. 52+34.14
AutoCAD SHX Text
ASSUMED BEARING N2°30'00"E
AutoCAD SHX Text
INSTALL SILT SACK TO PROTECT BASIN DURING CONSTRUCTION
AutoCAD SHX Text
INSTALL SILT SACK TO PROTECT BASIN DURING CONSTRUCTION
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 100'-0"
AutoCAD SHX Text
APPROXIMATE 100'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 100'-0"
AutoCAD SHX Text
APPROXIMATE 100'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
CONSTRUCTION & PGL
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
APPROXIMATE WATER SURFACE
AutoCAD SHX Text
CONTRACTOR WORK PLATFORM AND CONTAINMENT
AutoCAD SHX Text
CLEAN AND PAINT EXISTING STRUCTURAL STEEL
AutoCAD SHX Text
APPROXIMATE WATER SURFACE
AutoCAD SHX Text
EXISTING NEPONSET PATH (LIMIT OF WORK)
AutoCAD SHX Text
APPROXIMATE BOTTOM OF RIVER
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 100'-0"
AutoCAD SHX Text
APPROXIMATE 100'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 25'-0"
AutoCAD SHX Text
APPROXIMATE 100'-0"
AutoCAD SHX Text
APPROXIMATE 100'-0"
AutoCAD SHX Text
CONTRACTOR WORK PLATFORM AND CONTAINMENT
AutoCAD SHX Text
APPROXIMATE CLEARANCE TO WATER SURFACE 6 FT+/- OBSERVED 04/18/2020
AutoCAD SHX Text
APPROXIMATE 25'-0" WATERFRONT AREA
AutoCAD SHX Text
APPROXIMATE 25'-0" WATERFRONT AREA
AutoCAD SHX Text
CITY OF BOSTON PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION CENTRAL AVENUE BRIDGE B-16-024=M-25-003 B-16-024=M-25-003 B-16-024=M-25-003 BRIDGE PRESERVATION
AutoCAD SHX Text
CITY ENGINEER
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text
REVIEWED FOR GENERAL DESIGN AND CONFORMITY TO CITY STANDARDS
AutoCAD SHX Text
CIP 19-92 SHEET 2 OF 92 OF 9 OF 99
AutoCAD SHX Text
DATE: JANUARY 2020 DATE: JANUARY 2020JANUARY 2020
AutoCAD SHX Text
SCALE: " = 1'-0" 18" = 1'-0"
AutoCAD SHX Text
GENERAL PLAN
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
SCALES:
AutoCAD SHX Text
SCALES NOTED ON THE PLANS ARE NOT APPLICABLE TO REDUCED SIZE PRINTS. DIVIDE SCALES BY 2 FOR HALF-SIZE PRINTS.
AutoCAD SHX Text
REINFORCEMENT:
AutoCAD SHX Text
REINFORCING STEEL SHALL CONFORM TO THE REQUIREMENTS OF AASHTO M31 GRADE 60, EPOXY COATED. UNLESS OTHERWISE NOTED ON THE CONSTRUCTION DRAWINGS, ALL BARS SHALL BE LAPPED AS FOLLOWS: MODIFICATION CONDITION #4 BARS #5 BARS #6 BARS #4 BARS #5 BARS #6 BARS #5 BARS #6 BARS #6 BARS 1. NONE 16" 19" 23" NONE 16" 19" 23" 16" 19" 23" 19" 23" 23" 2. 12" OF CONCRETE BELOW BAR 20" 25" 30" 12" OF CONCRETE BELOW BAR 20" 25" 30" 20" 25" 30" 25" 30" 30" 3. COATED BARS, COVER < 3db, OR 23" 29" 34" COATED BARS, COVER < 3db, OR 23" 29" 34" 23" 29" 34" 29" 34" 34" CLEAR SPACING < 6db 4. COATED BARS, ALL OTHER CASES 18" 23" 27" COATED BARS, ALL OTHER CASES 18" 23" 27" 18" 23" 27" 23" 27" 27" 5. CONDITION 2 AND 3 26" 32" 39" CONDITION 2 AND 3 26" 32" 39" 26" 32" 39" 32" 39" 39" 6. CONDITION 2 AND 4 24" 30" 36" CONDITION 2 AND 4 24" 30" 36" 24" 30" 36" 30" 36" 36" ALL OTHER BARS SHALL BE LAPPED AS SHOWN ON THE CONSTRUCTION DRAWINGS.
AutoCAD SHX Text
EXISTING PLANS:
AutoCAD SHX Text
PLANS FOR THE EXISTING BRIDGE ARE AVAILABLE THROUGH THE CITY OF BOSTON PUBLIC WORKS DEPARTMENT.
AutoCAD SHX Text
TRAFFIC:
AutoCAD SHX Text
TEMPORARY TRAFFIC CONTROL IS REQUIRED TO PROTECT THE WORK ZONE DURING CONSTRUCTION AND SHALL BE IN ACCORDANCE WITH THE APPROVED TRAFFIC MANAGEMENT PLAN.
AutoCAD SHX Text
EXISTING CONDITIONS:
AutoCAD SHX Text
ALL DIMENSIONS AND DETAILS SHOWN FOR THE EXISTING STRUCTURE ARE NOT GUARANTEED. EXISTING BRIDGE GEOMETRY IS TAKEN FROM THE ORIGINAL DESIGN DRAWINGS AND FIELD OBSERVATION. THE CONTRACTOR SHALL DETERMINE AND ESTABLISH ALL DIMENSIONS AND DETAILS NECESSARY FOR THE COMPLETION OF ALL THE WORK BY FIELD MEASUREMENT AND SURVEY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ADEQUACY AND ACCURACY THEREOF, AND SHALL NOT ORDER ANY MATERIAL OR COMMENCE ANY FABRICATION UNTIL HE HAS VERIFIED AND COMPLETED THE REQUIRED MEASUREMENTS ON THE ACTUAL STRUCTURE AND THE EXTENT OF THE PROPOSED WORK HAS BEEN APPROVED BY THE ENGINEER.
AutoCAD SHX Text
UTILITIES:
AutoCAD SHX Text
ALL EXISTING UTILITIES SHALL BE LOCATED AND PROTECTED BY THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH UTILITY OWNERS TO COMPLETE THE PROPOSED WORK. THE INTENT OF THIS CONTRACT IS TO PERFORM THE WORK WITHOUT THE RELOCATION OF EXISTING UTILITIES.
AutoCAD SHX Text
CONCRETE:
AutoCAD SHX Text
4000 PSI, ", 660 CONCRETE FOR DECK AND SIDEWALK REPAIRS. 38", 660 CONCRETE FOR DECK AND SIDEWALK REPAIRS. LATEX MODIFIED CONCRETE (LMC) FOR WEARING SURFACE. PROPOSED LATEX MODIFIED CONCRETE MIX DESIGN SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. RAW MATERIALS SHALL MEET MASSDOT REQUIREMENTS AND SHALL BE OBTAINED FROM A MASSDOT APPROVED CONCRETE SUPPLIER. CALIBRATE MIXERS(S) FOR EACH PRODUCT (SAND, STONE, CEMENT, WATER, LATEX). TRIAL BATCH TESTING REQUIRED AND CYLINDERS SHALL BE MADE AND COMPRESSIVE STRENGTH TESTING SHALL BE PERFORMED AT 48 HOURS, 4 DAYS, 7 DAYS, AND 28 DAYS. INDEPENDENT 3RD PARTY INSPECTION REQUIRED FOR CALIBRATION, TRIAL BATCH TESTING, AND ALL FIELD PLACEMENTS OF CONCRETE.
AutoCAD SHX Text
STRUCTURAL STEEL:
AutoCAD SHX Text
MAKE PROPOSED STEEL REPAIRS AND CLEAN AND PAINT EXPOSED STRUCTURAL STEEL. THE FINISH COAT OF PAINT SHALL BE FEDERAL STANDARD COLOR 14223 (MASSDOT GREEN).
AutoCAD SHX Text
PERMIT DRAWINGS - NOT FOR CONSTRUCTION
AutoCAD SHX Text
SCALE: " = 1'-0" 18" = 1'-0"
AutoCAD SHX Text
WORK PLATFORM
AutoCAD SHX Text
SCALE: " = 1'-0" 18" = 1'-0"
AutoCAD SHX Text
BRIDGE ELEVATION OVER RIVER
Page 19: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

\\gillserver2\gilleng\B

OS

TO

N\state of good repair\boston b16024 central ave over neposet river\D

WG

\B

16024 C

EN

TR

AL A

VE

NU

E.dw

g

Page 20: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

\\gillserver2\gilleng\B

OS

TO

N\state of good repair\boston b16024 central ave over neposet river\D

WG

\B

16024 C

EN

TR

AL A

VE

NU

E.dw

g

Page 21: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

\\gillserver2\gilleng\B

OS

TO

N\state of good repair\boston b16024 central ave over neposet river\D

WG

\B

16024 C

EN

TR

AL A

VE

NU

E.dw

g

Page 22: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

\\gillserver2\gilleng\B

OS

TO

N\state of good repair\boston b16024 central ave over neposet river\D

WG

\B

16024 C

EN

TR

AL A

VE

NU

E.dw

g

Page 23: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

\\gillserver2\gilleng\B

OS

TO

N\state of good repair\boston b16024 central ave over neposet river\D

WG

\B

16024 C

EN

TR

AL A

VE

NU

E.dw

g

Page 24: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

WORK ZONE L/2=60'

W1-4L

36''X36''

W5-1

36''X36''

W20-1

36''X36''

L/2=60' 105' 65' 65'65'65'

W1-4R

36''X36''

W1-4L

36''X36''

W1-4R

36''X36''

W5-1

36''X36''

1

0

0

'

W20-1

36''X36''

MA-R2-10a

36''X48''

MA-R2-10e

48''X36''

CENTRAL AVE

E

L

IO

T

S

T

C

E

N

T

R

A

L

A

V

E

R

IV

E

R

S

T

MA

TT

AP

AN

T

RO

LLE

Y

12' TRAVEL LANES

DRUM OR CONE

@ 20' O.C. (TYP)

SIDEWALK TO

REMAIN OPEN

SIDEWALK TO

REMAIN OPEN

BUS STOP TO BE TEMPORARILY RELOCATED

(MBTA TO PROVIDE TEMPORARY SIGNAGE)

BUS STOP TO BE TEMPORARILY RELOCATED

(MBTA TO PROVIDE TEMPORARY SIGNAGE)

W20-1

36''X36''

W20-1

36''X36''

ROAD

WORK

AHEAD

END ROAD

WORK

DOUBLE

FINES END

ROAD

NARROWS

WORK ZONES

SPEEDING

FINES

DOUBLED

ROAD

WORK

AHEAD

ROAD

WORK

AHEAD

ROAD

NARROWS

ROAD

WORK

AHEAD

END ROAD

WORK

DOUBLE

FINES END

WORK ZONES

SPEEDING

FINES

DOUBLED

NE

PO

NS

ET

RIV

ER

TEMPORARY WHITE

EDGE LINES (TAPE)

TEMPORARY YELLOW

CENTER LINES (TAPE)

MA-R2-10e

48''X36''

MA-R2-10a

36''X48''

R

A

I

L

R

O

A

D

C

R

O

S

S

I

N

G

R15-1

48''X9''

TYPE III

BARRICADE

DO NOT

STOP

ON

TRACKS

R8-8

24''X30''

NOTE: INSTALL IF NOT PRESENT

NE

PO

NS

ET

TR

AIL

WORK ZONE

W1-4L

36''X36''

L/2=60'

W1-4R

36''X36''

ROAD

NARROWS

W5-1

36''X36''

ROAD

WORK

AHEAD

W20-1

36''X36''

WORK ZONES

SPEEDING

FINES

DOUBLED

MA-R2-10a

36''X48''

END ROAD

WORK

DOUBLE

FINES END

MA-R2-10e

48''X36''

L/2=60'

W5-1

36''X36''

ROAD

WORK

AHEAD

WORK ZONES

SPEEDING

FINES

DOUBLED

MA-R2-10a

36''X48''

END ROAD

WORK

DOUBLE

FINES END

CENTRAL AVE

C

E

N

T

R

A

L

A

V

E

105'

DRUM OR CONE

@ 20' O.C. (TYP)

65' 65'

BUS STOP TO BE TEMPORARILY RELOCATED

(MBTA TO PROVIDE TEMPORARY SIGNAGE)

W20-1

36''X36''

65'65'

W1-4R

36''X36''

W1-4L

36''X36''

ROAD

NARROWS

1

0

0

'

W20-1

36''X36''

MA-R2-10e

48''X36''

E

L

IO

T

S

T

R

IV

E

R

S

T

MA

TT

AP

AN

T

RO

LLE

Y

12' TRAVEL LANES

SIDEWALK TO

REMAIN OPEN

SIDEWALK TO

REMAIN OPEN

BUS STOP TO BE TEMPORARILY RELOCATED

(MBTA TO PROVIDE TEMPORARY SIGNAGE)

ROAD

WORK

AHEAD

ROAD

WORK

AHEAD

W20-1

36''X36''

NE

PO

NS

ET

RIV

ER

TEMPORARY WHITE

EDGE LINES (TAPE)

TEMPORARY YELLOW

CENTER LINES (TAPE)

TYPE III

BARRICADE

R

A

I

L

R

O

A

D

C

R

O

S

S

I

N

G

R15-1

(EXISTING)

48''X9''

R8-8

24''X30''

NOTE: INSTALL IF NOT PRESENT

DO NOT

STOP

ON

TRACKS

NE

PO

NS

ET

TR

AIL

\\G

ILLS

ER

VE

R2\G

illE

ng\B

OS

TO

N\S

TA

TE

O

F G

OO

D R

EP

AIR

\B

oston B

16024 C

entral A

ve over N

eposet R

iver\D

WG

\B

16024 C

EN

TR

AL A

VE

NU

E T

TC

P.dw

g

LEGEND:

NOTES:

NN

30

SCALE: 1" = 30'

0 60 100

30

SCALE: 1" = 30'

0 60 100

Page 25: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

WORK ZONE L/2=60'

W1-4R

36''X36''

W5-1

36''X36''

W20-1

36''X36''

L/2=60' 105' 65' 65'65'65'

W1-4R

36''X36''

W5-1

36''X36''

1

0

0

'

W20-1

36''X36''

MA-R2-10a

36''X48''

MA-R2-10e

48''X36''

CENTRAL AVE

E

L

IO

T

S

T

C

E

N

T

R

A

L

A

V

E

R

IV

E

R

S

T

MA

TT

AP

AN

T

RO

LLE

Y

12' TRAVEL LANES

DRUM OR CONE

@ 20' O.C. (TYP)

SIDEWALK TO

REMAIN OPEN

SIDEWALK TO

REMAIN OPEN

BUS STOP TO BE TEMPORARILY RELOCATED

(MBTA TO PROVIDE TEMPORARY SIGNAGE)

BUS STOP TO BE TEMPORARILY RELOCATED

(MBTA TO PROVIDE TEMPORARY SIGNAGE)

W20-1

36''X36''

W20-1

36''X36''

ROAD

WORK

AHEAD

END ROAD

WORK

DOUBLE

FINES END

ROAD

NARROWS

WORK ZONES

SPEEDING

FINES

DOUBLED

ROAD

WORK

AHEAD

ROAD

WORK

AHEAD

ROAD

NARROWS

ROAD

WORK

AHEAD

END ROAD

WORK

DOUBLE

FINES END

WORK ZONES

SPEEDING

FINES

DOUBLED

NE

PO

NS

ET

RIV

ER

TEMPORARY WHITE

EDGE LINES (TAPE)

TEMPORARY YELLOW

CENTER LINES (TAPE)

MA-R2-10e

48''X36''

MA-R2-10a

36''X48''

R4-7

24''X30''

R4-7

24''X30''

R

A

I

L

R

O

A

D

C

R

O

S

S

I

N

G

R15-1

(EXISTING)

48''X9''

R8-8

24''X30''

NOTE: INSTALL IF NOT PRESENT

DO NOT

STOP

ON

TRACKS

TYPE III

BARRICADE (TYP)

NE

PO

NS

ET

TR

AIL

\\G

ILLS

ER

VE

R2\G

illE

ng\B

OS

TO

N\S

TA

TE

O

F G

OO

D R

EP

AIR

\B

oston B

16024 C

entral A

ve over N

eposet R

iver\D

WG

\B

16024 C

EN

TR

AL A

VE

NU

E T

TC

P.dw

g

NOTES:

N

30

SCALE: 1" = 30'

0 60 100

LEGEND:

Page 26: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

Abutters List for Bridge Preservation on Central Ave

CITY OF BOSTON

PARCEL ID LOCATION LOCATION CITY LOCATION ZIPCODE OWNER MAILING ADDRESS MAILING CITY/STATE MAILING ZIPCODE

1704030000 84 100 RIVER ST MATTAPAN 02126 TRINITY RIVER ST LP/MASS LP 75 FEDERAL ST 4TH FL BOSTON MA 02110

1704030001 82 RIVER ST MATTAPAN 02126 EIGHTY-2 RIVER STREET LLC 82 RIVER ST DORCHESTER MA 02126

1704031000 CENTRAL AV MATTAPAN 02126 COMMWLTH OF MASS CENTRAL AVE MATTAPAN MA 02126

1704031010 1241 -1255 ADAMS ST DORCHESTER 02124 BAKER SQUARE CONDO TRUST 6 FANEUIL HALL MKTPLACE BOSTON MA 02109

1704037001 CENTRAL AV MATTAPAN 02126 BOSTON EDISON CO MASS PO BOX # 270 HARTFORD CT 06141

1704038000 12 CENTRAL AV MATTAPAN 02126 BOSTON EDISON CO MASS CORP PO BOX # 270 HARTFORD CT 06141

1704039000 70 RIVER ST MATTAPAN 02126 SUNOCO LLC 1900 DALROCK ROAD ROWLETT TX 75088

1704042100 52 R RIVER ST MATTAPAN 02126 LONGDEN REALTY LLC 156 HAYWARD ST BRAINTREE MA 02184

1704042010 54 R RIVER ST MATTAPAN 02126 FIFTY 4R RIVER STREET 54R RIVER ST MATTAPAN MA 02126

TOWN OF MILTON

abutters_id_fieldabutters_owner1 abutters_owner2 abutters_address abutters_town abutters_state abutters_zip abutters_bookpage abutters_location

E 21 11 ONEILL CENTRAL AVENUE LLC 46 COLUMBINE RD MILTON MA 02186 27193-64 20-34 CENTRAL AV

E 23 23 TAMULYNAS ANDREW & JESSICA L 136 ELIOT ST MILTON MA 02186 32313-240 136 ELIOT ST

E 23 24 VIN-JON LLC 260 LYMAN ROAD MILTON MA 02186 34068-392 37 CENTRAL AV

E 23 25 ISSNER AVERY L TRUSTEE DOROTHY F ISSNER 472 DUDLEY RD NEWTON MA 02459-2813 26534-52 25-29 CENTRAL AV

E 24 46 131 ELIOT STREET LLC 1859 DORCHESTER AVE DORCHESTER MA 02124 37281-493 131 ELIOT ST

E 4 1 ONEILL EDWARD T 91 ALLERTON RD MILTON MA 02186 4605-724 10 CENTRAL AV

E 4 2 95 ELIOT STREET LLC C/O JANET FALLON PLOTNER 9 HIGHLAND COURT NEEDHAM MA 02492 32245-513 93 ELIOT ST

E 8 1 KELLY JOHN M & NANCY J 7 MORTON RD MILTON MA 02186 21313-4 7 MORTON RD

E 4 3 DEPARTMENT OF CONSERVATION & RECREATION 251 CAUSEWAY ST SUITE 900 BOSTON MA 02114-2138 0 ELIOT ST

E 24 48 TOWN OF MILTON CONSERVATION 525 CANTON AV MILTON MA 02186 5435-189 ELIOT ST

Page 27: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

Attachment C Abutters List, Affidavit of Service and Abutter Notification

Page 28: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade
Page 29: Capital Improvement Project 19-92 Central Avenue over ... Central A… · The purpose of this Bridge Preservation Project is to repair the deteriorated portions of the bridge to upgrade

Gill Engineering Associates, Inc. 63 Kendrick Street

Needham, MA 02494 www.gill-eng.com

781-355-7100

NOTIFICATION TO ABUTTERS BOSTON CONSERVATION COMMISSION

In accordance with the Massachusetts Wetlands Protection Act, Massachusetts General Laws Chapter 131,

Section 40, and the Boston Wetlands Ordinance, you are hereby notified as an abutter to a project filed with the

Boston Conservation Commission.

A. Gill Engineering Associates, Inc., representing City of Boston Public Works Department has filed a

Request for Determination of Applicability with the Boston Conservation Commission seeking permission to

alter an Area Subject to Protection under the Wetlands Protection Act (General Laws Chapter 131, section 40)

and Boston Wetlands Ordinance.

B. The address of the lot where the activity is proposed is Central Avenue over Neponset River.

C. The project involves bridge preservation work.

D. Copies of the Request for Determination of Applicability may be obtained by contacting the Boston

Conservation Commission at [email protected].

E. Copies of the Request for Determination of Applicability may be obtained from Preston Huckabee, Gill

Engineering Associates, Inc., at [email protected], between the hours of 9 AM to 5 PM, Monday

through Friday.

F. In accordance with the Commonwealth of Massachusetts Executive Order Suspending Certain Provisions of

the Open Meeting Law, the public hearing will take place virtually at https://zoom.us/j/6864582044. If you

are unable to access the internet, you can call 1-929-205-6099, enter Meeting ID 686 458 2044 # and use # as

your participant ID.

G. Information regarding the date and time of the public hearing may be obtained from the Boston

Conservation Commission by emailing [email protected] or calling (617) 635-3850 between the hours of 9

AM to 5 PM, Monday through Friday.

NOTE: Notice of the public hearing, including its date, time, and place, will be published at least five (5) days in

advance in the Boston Herald.

NOTE: Notice of the public hearing, including its date, tine, and place, will be posted on

www.boston.gov/public-notices and in Boston City Hall not less than forty-eight (48) hours in advance.

NOTE: If you would like to provide comments, you may attend the public hearing or send written comments to

[email protected] or Boston City Hall, Environment Department, Room 709, 1 City Hall Square, Boston, MA 02201

NOTE: You also may contact the Boston Conservation Commission or the Department of Environmental

Protection Northeast Regional Office for more information about this application or the Wetlands Protection

Act. To contact DEP, call: the Northeast Region: (978) 694-3200.