capacity building for mar on tropical forests (itto c&i ...international tropical timber...
TRANSCRIPT
-
Capacity building for MAR on tropical forests
(ITTO C&I training WS)
Organization-Led Initiative in support of the UNFF
28-30 November 2016, Rome, Italy
Takeshi Goto, Assistant Director
International Tropical Timber Organization (ITTO)
-
Background:
•ITTO developed “Guidelines for SFM in Tropical
Forests” in 1990.
•First set of Criteria published in 1992 to monitor the
Guidelines.
•A set of C&I was developed in 1998 and revised in
2005 and 2015.
•All ITTO producer member countries are requested to
report progress toward SFM using C&I.
•Harmonization of C&I was done
with ATO and ACTO.
Capacity building for MAR on tropical forests
(ITTO C&I training WS)
-
Capacity building for MAR on tropical forests
(ITTO C&I training WS and projects)
Training WS:
• ITTO carried out 28 national training workshops
since 2002 to assist ITTO producer member
countries in:
• Understanding and implementing C&I;
• Generating or checking national reports; and
• Involve all stakeholders in the process.
• Over 1,200 stakeholders have participated in these
training workshops.
• Nearly US$ 800 thousand has
been mobilized to organize
these workshops.
-
Capacity building for MAR on tropical forests
(ITTO C&I training WS and projects)
Projects:
• ITTO has implemented more than 20 projects to
support ITTO producer member countries in:
• Developing national level C&I;
• Implementing national C&I; and
• Building capacity to conduct MAR
• Nearly US$ 15 million has been mobilized to
implement these projects.
-
Capacity building for MAR on tropical forests
(ITTO C&I training WS and projects)
Reducing reporting burden:
• Reporting Formats ware developed in 2000 to
facilitate monitoring and reporting.
• Harmonization of C&I was undertaken with African
Timber Organization (ATO) and Amazon
Cooperation Treaty Organization (ACTO).
• Participated in the Collaborative Forest Resources
Questionnaire (CFRQ).
-
Capacity building for MAR on tropical forests
(ITTO C&I training WS and projects)
Status of reporting:
Steady progress has been observed in many ITTO
producer member countries in reporting.
Number of countries submitted report Score
2005 2010 2005 2010
23 32 1.5 1.9
0 : no information submitted
1 : information given was not of use for reporting
2 : information given was partly of use for reporting
3 : information given was useful for reporting
-
Capacity building for MAR on tropical forests
(ITTO C&I training WS and projects)
Region Area of forests
Production
PFE
Production PFE under
management plans
Certified
forests
Production PFE
under SFM
Africa
A/P
LAC
All
tropics
Summary of trends (Production PFE):
-
Capacity building for MAR on tropical forests
(ITTO C&I training WS and projects)
Region Area of forests
Protection
PFE
Protection PFE under
management plans
Protection PFE
under SFM
Africa
A/P
LAC
All tropics
Summary of trends (Protection PFE):
-
Capacity building for MAR on tropical forests
(ITTO C&I training WS and projects)
Conclusions:
• Eight countries prepared their reports without
assistance from ITTO;
• Capacity is growing in generating and supplying data
as part of routine work;
• Considerable problems still exist in data availability
and quality for many indicators; and
• Capacity building continues to be required in many
ITTO producer member countries,
including new ITTO members.
-
Thank you for your attention!
www.itto.int
www.cpfweb.org
http://www.itto.int/http://www.cpfweb.org/