Page 1 Canada-France-Hawaii-Telescope Interview and Presentation Steven Bauman Principal Mechanical Engineer University of Arizona Steward Observatory 6-6-08

Upload: others

Post on 02-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 1

Canada-France-Hawaii-Telescope Interview and Presentation

Steven Bauman Principal Mechanical Engineer University of Arizona Steward Observatory 6-6-08

Page 2: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 2

LOTIS 6.5m Primary Mirror Coating Effort

• Need 6.5m Aluminization chamber capable of coating the LOTIS primary mirror in it’s primary cell by March of 2008 • LOTIS has reached an agreement with the Multi-Mirror Telescope (MMT) to supply the back half of the coating chamber consisting of the Rear Bell Jar which include the Filament array, pumps, valves, and power supplies needed to pump down the chamber and coat the LOTIS primary mirror. •Started the process with a concept design with analysis to support and verify the design of components and the overall chamber assembly. Created drawings, researched vendors, reviewed proposals, and awarded a bid to the selected vendor for $500K. Acted as the main contact thought the manufacturing process. Managed and organized the set-up of the chamber for testing and coating. Performed actions needed during the coating and set-up process such as a witness sample verification method, a mirror cleaning procedure, and the lifting and staging of large assemblies and components.

Page 3: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 3

6.5m Coating Chamber Concept

Page 4: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 4

Closed Chamber Section view

Page 5: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 5

Chamber GSE - Tilt Stand

Page 6: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 6

Tilt stand rotation support

Page 7: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 7

Tilt Stand Analysis

•Additional analysis examples:

•Primary Mirror Support stands. •P-Cell upright beam analysis. •Pickle fork analysis.

Page 8: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 8

Tilt Stand drawing

Page 9: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 9

Chamber GSE - Cart

Page 10: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 10

Chamber GSE - Delivered

Page 11: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 11

Chamber GSE - Cradle

Page 12: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 12

Chamber Extension

Page 13: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 13

Stand GSE

Page 14: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 14

Stand drawing

Page 15: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 15

Rear Bell Jar Arm

Page 16: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 16

Rear Bell Jar Arm

Page 17: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 17

Rear Bell Jar Fabrication

Page 18: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 18

Rear Bell Jar Fabrication Dwg.

Page 19: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 19

Rear Bell Jar Finished

Page 20: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 20

GSE and Tilt Stand Delivery

Page 21: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 21

Rear Bell Jar Delivery

Page 22: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 22

Rear Bell Jar Lift and staging

Page 23: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 23

Rear Bell Jar on Tilt Stand

Page 24: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 24

Chamber assembled and ready for Testing

Page 25: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 25

Aluminum Filament Array

Page 26: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 26

Coating Filaments

Page 27: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 27

Witness Sample Specimens • 1” x 3” Glass microscope slides

– 45 samples placed on mimicked mirror contour. – Samples measured for coating thickness

• 1” x 3” Glass microscope slides – 25 samples placed on mimicked mirror contour. – Samples places in chamber for various testing

• 18” x 18” x ¼ “Borofloat Glass plates – 8 samples placed in chamber for various testing.

• 12” x 12” x ¼” Borofloat Glass plates with Simulated Hartmann mirrors bonded (4” x 0.75” Pyrex disks). – 4 samples placed in the chamber for on going Hartman testing.

• Specimens were coated in 6.5m test shoot #2. – Improved cleaning procedures

• A Final cleaning step involving a D.I. Water and Alcohol wipe just prior to installation in the chamber.

• A last cleaning step with CO2 snow treatment just before closing the chamber for pump down.

Page 28: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 28

Coating Sample Layout

Page 29: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 29

Specimens loaded in the chamber

Page 30: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 30

Chamber opened to remove Samples

Page 31: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 31

Chamber post coating

Page 32: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 32

1” x 3” slides and other plates removed for testing

Page 33: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 33

Step thickness measurements

• Optical thickness measurement devices. – Veeco NT-9800 - Optical Profiler – Micromap Topometer – Optical topographic reader

• Optical application – Dae Wook Kim – Optical graduate student – OSC

• All 45 slides measured by S.Bauman and Dan by 9-18-07 – Michael Jacobson – Optical data Associates

• 5 Slides measured to verify above measurements.

Page 34: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 34

LOTIS 2nd Witness Sample Aluminum Coating

05

101520253035404550556065707580859095

100105110115120125

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135

Radius from center (in)

Coa

ting

thic

knes

s (n

m)

West East Vertical

Page 35: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 35

Coating Thickness Summary

• Second Test Shoot Coating - Successful – Uniform thickness overall, average overall thickness 108

nm or 1081 angstroms. • Significantly better cleaning preparation for second shoot

compared the first shoot. • Final cleaning step with D.I. water and Alcohol reduced

cloudy, white, streaky, residue. • CO2 snow cleaning treatment reduced particulates from the

coating surface for better adhesion. • Primary Mirror cleaning procedure is being modified to

incorporate new final cleaning steps. • Hartman mirror protection plan on-going.

Page 36: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 36

Rear Bell Jar moved Inside Lab

After the filament firing had been calibrated by the witness sample testing and measurements the coating chamber was disassembled and brought inside the integration lab for reassembly and the Final coating step.

Page 37: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 37

Rear Bell Jar Rigging

Wrote lifting procedures and supplied detailed drawings for lifting, staging, and rigging equipment.

Page 38: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 38

Tilt stand rigging

Page 39: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 39

Tilt stand moved inside

Page 40: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 40

Extension and Cradle Lift

Page 41: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 41

Front Bell Jar Moved Inside

Page 42: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 42

Final Component needed for Chamber Assembly

Page 43: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 43

Chamber staging needed for assembly in tight quarters

Page 44: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 44

Aluminization Chamber Assembled

•Chamber assembled inside Integration lab and ready for pump down and leak test. •Next task is to prepare the mirror for coating. •Clean Primary Mirror, tilt down to accept the primary mirror/Cell and coat.

Page 45: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 45

Preparing the Primary Mirror

•The Primary Mirror needed to be shrouded in a way that was never done before horizon pointing. •A misting system was added above the mirror to keep the entire mirror surface wet during the cleaning process. •A plug was installed in the center of the mirror to keep out all liquids.

Page 46: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 46

Mirror cleaning equipment •Multiple scissor lifts and an articulating boom lift were used to reach the entire mirror surface for the cleaning event. •Trained and Certified to operate forklifts, scissor lifts and articulating boom lifts.

Page 47: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 47

Unique Cleaning Method •A special cleaning procedure needed to be developed to address cleaning a mirror horizon pointing as well as dealing with Hartman mirrors. •Developed a cleaning procedure and chemical list with process and guidelines.

Page 48: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 48

Cleaning the Primary Mirror •Prepared a detailed schedule and checklist for cleaning the mirror.

•Organized and Managed a six (6) man team to carry out the cleaning activates.

•Worked with the team thought the process.

Page 49: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 49

Drying the Primary Mirror •After the Primary Mirror was inspected and deemed clean and dry technique needed to be developed. •Ultra pure dry nitrogen, custom blow guns, and ESD guns were used to remove the water and dust particles.

Page 50: Canada-France-Hawaii-Telescope Interview and Presentationbauman/Publications/Presentations/Overview … · Interview and Presentation Steven Bauman . Principal Mechanical Engineer

Page 50

•Chamber opened. •Coated 6.5m Mirror ready for inspection. •Rotate Rear Bell Jar down and remove the primary mirror and cell. •Coat the mirror with Opti-coat and tarp. •Disassemble the coating chamber and ship components.