Construction of the new Camp Street Bridge over Lake Forbes will start on Monday 26 August 2019. The $12.8 million project will replace the existing bridge and improve safety for road users. The project involves building a new, wider bridge across Lake Forbes with wider lanes and pedestrian and cycle paths, which will improve safety for motorists and pedestrians. The design includes landscaping suitable to the lakeside environment and the lamp posts from the existing bridge will be incorporated in the design to complement the town’s heritage aesthetics. The existing Camp Street Bridge was built in 1927 and is narrow, in poor condition and nearing the end of its life. The contract for the project has been awarded to Abergeldie Contractors Ptd Ltd. The new bridge will be completed by August 2020, weather permitting. For more information on the project including flyover footage visit rms.work/forbesbridge.
Visualisation of the new bridge looking towards Forbes.
Camp Street Bridge replacement
New pathwaysfor active transport
Working with localcommunities
Improvingsafety
New bridgeNewbridge
RMS8443_Camp_Street_Poster_A1_v6_FILM.indd 1 24/07/2019 6:48 PM