Page 1: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Camp Return StrategySHELTER CLUSTER – LEOGANE

Page 2: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

CCCM Pilot Programme

Page 3: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Identification of Beneficiaries

•Global registration•Call for return•Advantage for CM agency

Page 4: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Return Package

•Shelter•Livelihoods (CFW, etc.)•WASH, NFIs, etc.

Page 5: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Shelter

•Organization of family information Name Size Locality of Return Contact information

Page 6: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Shelter

•Coordination with Shelter Cluster/Shelter Agency according to map

Page 7: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Evaluation of other needs

•Livelihoods▫CFW▫FFW▫Agriculture▫Fishery

•WASH•Health•Education•NFI

Page 8: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Final Product

Nb NoAbri Name Family Size Tel IP Current

LocationLocalite

of Return

Corresponding

Shelter Agency

Needs Upon Return (Y/N)

Shelter WASH CFW/FFW

1 131 LOUIS Erlande 4 3622-8116 ACTEDParc Gerard Christophe Chatuley ACTED N Y Y

2 105JACQUES Rose

Daniel 8 3662-1329 SASHParc Gerard Christophe

Rue d'Autant CARE N N Y

3 104 EXILAS Sirilia 7 3768-2103 IntersosParc Gerard Christophe Cada ? Y Y Y

Page 9: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

ACTED Case Study

•Parc Gerard Christophe•Imol Camp•Marche Chatuley

Page 10: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Chatuley

• Partnership in Chatuley with Samaritan’s Purse because of material pipeline challenges

Nb NoAbri Name Family Size Tel IP Current

LocationLocalite

of Return

Corresponding

Shelter Agency

Needs Upon Return (Y/N)

Shelter WASH CFW/FFW

1 131 LOUIS Erlande 4 3622-8116 ACTEDParc Gerard Christophe Chatuley ACTED N Y Y

2 105JACQUES Rose

Daniel 8 3662-1329 SASHParc Gerard Christophe

Rue d'Autant CARE N N Y

3 104 EXILAS Sirilia 7 3768-2103 IntersosParc Gerard Christophe Cada ? Y Y Y

Page 11: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Process

•Evaluation•Delivery•Construction•Post-construction evaluation

Page 12: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Evaluation

•Terrain of origin•T-shelter criteria•Land Title

▫ Landowner information▫ Explanation▫ Neighbors▫ ASEC▫ CASEC▫ Mayor’s Office

Page 13: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Delivery/Construction•Beneficiaries sign contract

Agreement to leave the camp 48 hrs after installation

Volunteer to work for the day Preparation of terrain

•ACTED truck picks up materials at SP warehouse

•Camp volunteers unload, SP teams build T-shelter

•Reception receipt•Sensitization on anchors

Page 14: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Post-construction evaluation

•SP questionnaire•Anchors•T-shelter constructed•T-shelter inhabited•Camp site evacuated

Page 15: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Challenges

•Aid activities focused within camps•Families refuse to leave camp site

▫Camp still serves as a pull factor for families

▫Need to direct interventions towards localities of return Inter-cluster support critical

•Global subscription to return strategy•Hurricane season

Page 16: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Way forward• Coordination with local government to

understand and contribute to return strategy while strengthening capacity at return sites▫ Land titles, evaluations, camp decongestion support

• Advocacy at inter-cluster level▫ CCCM Agencies, IOM, OCHA

• Support from IPs• Realization of return of pilot population

▫ Develop lessons learnt▫ Prove the return process works

• Scale up

Page 17: Camp Return Strategy SHELTER CLUSTER – LEOGANE. CCCM Pilot Programme

Thank you