![Page 1: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/1.jpg)
CAMBODIACAMBODIACAMBODIA
![Page 2: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/2.jpg)
The Asian Forum on Disaster Management and Climate Change
Adaptation Hyogo, Kobe, Japan, April 21-26, 2009
The Asian Forum on Disaster The Asian Forum on Disaster Management and Climate Change Management and Climate Change
Adaptation Adaptation Hyogo, Kobe, Japan, April 21Hyogo, Kobe, Japan, April 21--26, 200926, 2009
Vannareth SETHMinistry of Water Resources and Meteorology
Department of Meteorology
Email : [email protected]
Vannareth SETHMinistry of Water Resources and Meteorology
Department of Meteorology
Email : [email protected]
DOM / MOWRAM
![Page 3: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/3.jpg)
3
OutlineOutlineOutline Feature of Natural Disaster in Cambodia
National Disaster Management Organization and Coordination System
Improvement of National Disaster Management Capacity in Communities and Local Societies
Climate Change Adaptation in Natural Disaster Management
DOM / MOWRAM
![Page 4: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/4.jpg)
4
OutlineOutlineOutline Feature of Natural Disaster in Cambodia
National Disaster Management Organization and Coordination System
Improvement of National Disaster Management Capacity in Communities and Local Societies
Climate Change Adaptation in Natural Disaster Management
DOM / MOWRAM
![Page 5: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/5.jpg)
5
Country informationCountry information
- Total area: 181,035 km²- Population: 13,388,910
(Female 52%, Male 48%) - 85 % of population are farmers.- Density: 74.7 person/ km².- Average growth: 2.4%.- GDP per capita US$600- Rice is the most important crop.- Rice yield is 2.8 tons/ha.
Thailand
Viet Nam
Laos PDRGu
lf of
Tha
iland
![Page 6: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/6.jpg)
6
• Possible Natural Disasters : Flood, Drought, Forest fire, Landslide, Tropical Cyclone, Thunderstorm, Lightning, Heavy rain and Storm surge.
• Recent flood : Flash flood (2000, 2006, 2007 and 2008), Flood plan (almost every year), River flood (1984, 1986, 1999, 2000, 2001 and 2002).
• Recent drought : Agriculture drought (almost every year), Hydrological drought (1997, 1998, 2003, 2004 and 2005), Climate drought (almost every year).
The Natural Disasters in Cambodia (1)
The Natural Disasters in The Natural Disasters in Cambodia (1)Cambodia (1)
DOM / MOWRAM
![Page 7: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/7.jpg)
7
Bridge on the National Road 6A was collapsed by year 2001 Mekong River
Flood, in Kompong Cham Province
Collapse of embankment of national road No 1 by overland flow from right bank side of Mekong river during the flood in year 2000
Flooding Issues
DOM / MOWRAM
![Page 8: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/8.jpg)
8
Flooding Issue
DOM / MOWRAM
![Page 9: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/9.jpg)
9
Issues of draught
Draught in 2004
Irrigation system protectedby draught
DOM / MOWRAM
![Page 10: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/10.jpg)
10
• Recent forest fire : Forest fire (1997 and 1998) in the Kirirum mountain as the small scale disaster.
• Recent Landslide : Landslide (2000, 2002, 2007 and 2008).
• Recent Tropical Cyclone : Typhoon Lida (1998)
• Recent Thunderstorm : Thunderstorm (almost every year)
The Natural Disasters in Cambodia (2)
The Natural Disasters in The Natural Disasters in Cambodia (2)Cambodia (2)
DOM / MOWRAM
![Page 11: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/11.jpg)
DOM / MOWRAM
• Tornado effected on April 19, 2006
• At Kompong Sam
Issues of thunderstorm and strong wind
![Page 12: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/12.jpg)
12
Issues of Strong Wind
Strong Wind on April 19, 2006
DOM / MOWRAM
Water Spout on August 29, 2006
![Page 13: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/13.jpg)
13
• Recent Lightning : Lightning (every year)
• Recent Heavy Rain : Heavy rain (every year)
• Recent Storm surge : Storm surge (2000, 2001 and 2008)
The Natural Disasters in Cambodia (3)
The Natural Disasters in The Natural Disasters in Cambodia (3)Cambodia (3)
DOM / MOWRAM
![Page 14: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/14.jpg)
14
OutlineOutlineOutline Feature of Natural Disaster in Cambodia
National Disaster Management Organization and Coordination System
Improvement of National Disaster Management Capacity in Communities and Local Societies
Climate Change Adaptation in Natural Disaster Management
DOM / MOWRAM
![Page 15: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/15.jpg)
15
-Prime Ministers of the Kingdom of Cambodia (PMO) Co-Presidents-Ministry of Interior (MINT) Co-Vice Presidents-Council of Ministers Office (CMO) Co-Members-Ministry of National Defence (MND) Co-Members-Ministry of Environment (MOE) Member-Ministry of Economy. and Finance (MEF) Member-Ministry of Social Welfare, Labour and Veterans (MSWLV)
Member-Ministry of Public Works and Transport (MPWT) Member-Ministry of Agriculture, Foress and Fisheries (MAFF) Member-Ministry of Foreign Affairs and International Co-operation
(MYAIC) Member
National Cambodian Disaster Management Consist (1)
National Cambodian Disaster National Cambodian Disaster Management Consist (1)Management Consist (1)
DOM / MOWRAM
![Page 16: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/16.jpg)
16
-Ministry of Health (MOH) Member-Ministry of Planning (MOP) Member-Ministry of Information (MINF) Member-Ministry of Education, Youth and Sport (MEYS) Member-Ministry of Cults and Religious Affairs (MCRA) Member-Ministry of Rural Development(MRD) Member-Ministry of Industry, Mines and Energy (MIME) Member-Cambodian Development Council (COD) Member-Secretary of State, Women’s Affairs (SSWA) Member-Cambodian Red Cross (CRC) Member-Permanent Secretary NCDM (PS) Secretary
National Cambodian Disaster Management Consist (2)
National Cambodian Disaster National Cambodian Disaster Management Consist (2)Management Consist (2)
DOM / MOWRAM
![Page 17: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/17.jpg)
17
● Department of Emergency Co-ordination and Rehabilitation (ECR)● Department of Emergency Preparedness and Training (EPT)● Department of Administration and Finance (AdF)● Department of Search and Rescue (SAR)
National Cambodian Disaster Management –General Secretariat
National Cambodian Disaster National Cambodian Disaster Management Management ––General SecretariatGeneral Secretariat
DOM / MOWRAM
![Page 18: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/18.jpg)
18
Organization Structure of NCDMOrganization Structure of NCDM
Council of Minister
ECR
General Secretariat
EPTEDF
SAR
DOM / MOWRAM
![Page 19: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/19.jpg)
19
● An institutional philosophy based on understanding and using the terms of hazards analysis, vulnerability analysis, emergency management and disaster reduction.
● Emphasis on linking emergency management to the national development strategy
● Promotion of support for and implementation of the IDNDR Yokohama Strategy and Plan of Action for a Safer World.
● Emphasis on the coordination function of NCDM.● Adoption of a partnership approach with other actors in the
field, including government Ministers, Departments, Authorities and Agencies, technical and academic institutions (local and international), inter-governmental bodies, donors, local and international NGOs and UN agencies.
Strategy of NCDM (1)Strategy of NCDM (1)Strategy of NCDM (1)
DOM / MOWRAM
![Page 20: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/20.jpg)
20
● Intensification of collaborating relations between CRC and NCDM in terms of disaster reduction and emergency response operation.
●Development of network of collaborating academic center.●Focus on key issues as identified by the members of NCDM.●Adoption of a role for NCDM in general safety promotion.●Adoption of a role for NCDM in advocacy for the protection
of victims, emergency response personnel and infrastructure in emergency situations.
●Promotion and encouragement of a spirit of self-reliance and mutual benefit in government agencies and local communities.
Strategy of NCDM (2)Strategy of NCDM (2)Strategy of NCDM (2)
DOM / MOWRAM
![Page 21: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/21.jpg)
21
• An institutional philosophy based on understanding and using theterms of hazards analysis are limited.
• Emphasis on linking emergency management to the national development strategy is not clearly defined.
• System of information flow, coordination concerned during disaster are not clearly established in advance.
• Less connection and cooperation between NCDM within Ministries.
• Early warning announcement system and information distribution system are under Ministry of Water Resources and Meteorology. And all information or announcement giving two ways MOWRAM direct to mass media and to NCDM and NCDM is not well established.
ChallengesChallengesChallenges
DOM / MOWRAM
![Page 22: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/22.jpg)
• Training on Search and Rescue in Singapor.• Study and Visiting on Natural Disaster
Management in Korea.• Training on Search and Rescue in Cambodia.
DOM / MOWRAM
Resources in Cambodia for the Asian Country
Resources in Cambodia for the Asian Country
![Page 23: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/23.jpg)
23
OutlineOutlineOutline Feature of Natural Disaster in Cambodia
National Disaster Management Organization and Coordination System
Improvement of National Disaster Management Capacity in Communities and Local Societies
Climate Change Adaptation in Natural Disaster Management
DOM / MOWRAM
![Page 24: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/24.jpg)
24
Sub-National Disaster Structure Sub-National Disaster Structure
Provincial Communities
District Communities
![Page 25: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/25.jpg)
25
● Work primarily through the Provincial and Municipal CDM.
● Ensure that the provision of emergency and humanitarian relief is timely, relevant and well coordinated.
● Co-operate with local community organizations,● Encourage national programs for emergency management to
support local initiatives,● Ensure that emergency response can be used to promote
long-term development,● Provide support for rehabilitating damaged infrastructure,
Strategy of Sub-National Disaster (1)Strategy of SubStrategy of Sub--National Disaster (1)National Disaster (1)
DOM / MOWRAM
![Page 26: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/26.jpg)
26
● Use all available resources in the local area before asking forassistance from higher authority,
● Broaden activities to include sectors other than government m disaster reduction activities,
● Assess and analyse vulnerability of communities, their environment and their infrastructure to specific hazards,
● Strengthen and streamline procurement, supply and personal procedures,
● Promote local purchasing and employment of local expertise.
Strategy of Sub-National Disaster(2)Strategy of SubStrategy of Sub--National Disaster(2)National Disaster(2)
DOM / MOWRAM
![Page 27: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/27.jpg)
27
• An institutional philosophy based on understanding and using theterms of hazards analysis are limited.
• Emphasis on linking emergency management to the local level development strategy is not clearly defined.
• System of information flow, coordination concerned during disaster are not clearly established in advance.
• Early warning announcement system and information distribution system are not respond.
ChallengesChallengesChallenges
DOM / MOWRAM
![Page 28: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/28.jpg)
Provincial Disaster Committee
Local District Disaster Committee
DOM / MOWRAM
National Committee Disaster Management
DOM
Connection District Committee Level
Connection District Committee Connection District Committee LevelLevel
![Page 29: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/29.jpg)
DOM / MOWRAM
• Local Provincial Disaster Committee (2006)
• District Disaster Committee (2006)
After disaster from DoM are getting all information from local communities
After disaster from After disaster from DoMDoM are getting all information are getting all information from local communitiesfrom local communities
![Page 30: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/30.jpg)
• Training on Natural Disaster Management in Communities and local area in Philippine.
• Training on Natural Disaster Management in Communities and Local Area in Thailand.
DOM / MOWRAM
Resources in Cambodia for the Asian Country
Resources in Cambodia for the Asian Country
![Page 31: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/31.jpg)
31
OutlineOutlineOutline Feature of Natural Disaster in Cambodia
National Disaster Management Organization and Coordination System
Improvement of National Disaster Management Capacity in Communities and Local Societies
Climate Change Adaptation in Natural Disaster Management
DOM / MOWRAM
![Page 32: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/32.jpg)
32
Water and Climate in Cambodia
DOM / MOWRAM
![Page 33: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/33.jpg)
33
• Annual Max & Min temperature has increased about 0.5oC over the past fifty years
• Max & Min temperature of the last 24 years is higher than that of previous period
Climate Change in Cambodia (1)Climate Change in Cambodia (1)Climate Change in Cambodia (1)
30.0
30.5
31.0
31.5
32.0
32.5
33.0
33.5
34.0
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Years
Valu
e of
Max
Tem
p.
Yearly Mean
22.0
22.5
23.0
23.5
24.0
24.5
25.0
25.5
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Years
Valu
e of
Min
Tem
p.
Yearly Mean
DOM / MOWRAM
![Page 34: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/34.jpg)
34
• Rainfall increases in rainy season (Sep. to Octo.), decreases in dry season.
• More heavy rainfalls causing severe floods.
• Droughts happen every year in most regions of the country.
Climate Change in Cambodia (2)Climate Change in Cambodia (2)Climate Change in Cambodia (2)
DOM / MOWRAM
![Page 35: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/35.jpg)
35
Monthly Precipitation at Phnom Penh
1911-2006
Monthly Precipitation at Phnom Penh
1911-2006
MEAN MONTHLY PRECIPITATION AT POCHENTONG STATION (1911-2006)
0.0
50.0
100.0
150.0
200.0
250.0
300.0
Jan Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.
Months
Prec
ipita
tion
(mm
)
MEAN
DOM / MOWRAM
0.0
1000.0
2000.0
3000.0
4000.0
5000.0
6000.0
7000.0
Jan Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.
monthsVa
lue
of ra
infa
llMonthly total
Monthly mean
Monthly Precipitation at Phnom Penh
1985-2008
Monthly Precipitation at Phnom Penh
1985-2008
![Page 36: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/36.jpg)
36
Precipitation at Phnom Penh from 1911-2006 Precipitation at Phnom Penh from 1911-2006
DOM / MOWRAM
YEARLY PRECIPITATION AT POCHENTONG STATION (1911-2006)
0.0
500.0
1000.0
1500.0
2000.0
2500.0
1911
1914
1917
1920
1923
1926
1929
1932
1935
1938
1941
1944
1947
1950
1953
1956
1959
1962
1965
1968
1971
1974
1977
1980
1983
1986
1989
1992
1995
1998
2001
2004
Years
Precipitation (mm)
Yearly total
![Page 37: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/37.jpg)
37
The average of annual rainfall varies from 1100mm to more than 4000mm
Distribution of Annual Rainfall
Flat region : 1000-2000mm Northeastern : 1800-3000mm Costal region : 2600-4000mm Bokor mountain : 4650mm
DOM / MOWRAM
![Page 38: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/38.jpg)
38
•Typhoons occur more frequently, with higher intensity. •Typhoon trajectory moves southward, typhoon season shifts to later months of the year.
Climate Change in Cambodia (3)Climate Change in Cambodia (3)Climate Change in Cambodia (3)
![Page 39: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/39.jpg)
39
Water Resource Potential in CambodiaWater Resource Potential in Cambodia Referring to the previous study, the promising of Water
Resources Project has a potential as follows:
Water Resource Power in MW Irrigated Area in ha
Main Stream 10,800 734,000 Mekong Tributaries 2,727 253,000 Mekong Flooded Area - 179,000 Tonle Sap Tributaries 306 358,900 Outside Mekong Basin 1,146 142,000 Total 14,979 1,667,300
The total potential of water resource in Cambodia is estimated with minimizing risk of environmental problem, at 3,200 MW.
DOM / MOWRAM
![Page 40: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/40.jpg)
40
IMPACTS OF CLIMATE CHANGE
Agriculture;Water Sector;Forestry;Fisheries;Coastal Zone;EcosystemsWet land systems
DOM / MOWRAM
![Page 41: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/41.jpg)
41
ORGANIZATION STRUCTURE OF MOWRAMORGANIZATION STRUCTURE OF MOWRAM
MINISTER AND
SECRETARIES OF STATE
Cabinet of the MinisterUNDER SECRETARIES OF STATE
Directorate General of Administration Affaires
Department of Administration and Human Resource Development
Department of Planning and International Cooperation
Department of Finance
Directorate General of Technical Affaires
Department of Water Resource Management and Conservation
Department of Hydrology and River Works
Department of Irrigated Agriculture
Department of Engineering
Department of Water Supply
Department of Meteorology
Provincial and Municipality Bureaus of Water Resources and Meteorology
Directorate General of Inspection
Technical Service Center for Irrigation Meteorology
Department of Farmers Water User Community
Department of Audit
![Page 42: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/42.jpg)
Structure of Department of Meteorology
Dept. of Meteorology
Ad. Office Obser. Office Equi. Office Fore. Office Clim. Office
Ad. Section
Plan. Section
Ob. Section
Agro. Section
Inst. Section
Rep.. Section
Weath. Section
Trop. Section
Gat. Section
Inf. Section
Hydro-Meteorological Office
(Provincial Station)
ResearchAvia.Meteo.
Section
DOM / MOWRAM
![Page 43: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/43.jpg)
DOM / MOWRAM
• To Prepare the plan for rehabilitation and development the meteorology, oceanographic and seismic throughout the country.
• To establish and manage the meteorological, oceanographic and seismic stations.
• To observe the weather condition for the purpose to serve for all concerning sectors.
• To forecast for the need of various organizations and inform in advance the natural disaster.
• Provide consulting services on meteorology, ocean-ographic and seismic.
Main Activities of Department of Meteorology
![Page 44: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/44.jpg)
DOM / MOWRAM
• Undertake studies of scientific researches on meteorology, oceanographic and seismic.
• Undertake studies for the applied advanced science and technology, development and transfer technologies in meteorology, oceano-graphic and seismic.
• Take in the preparation of rule, procedure and technology standards of meteorology, ocean-ographic and seismic.
Main Activities of Department of Meteorology
![Page 45: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/45.jpg)
45
. Additional Automatic Weather Station (AWS)
. Automatic Data Collection System
. Dissemination of meteorological and other data
. Numerical Weather Prediction System
. To install weather radar station
. Weather Radar Network
. Upper Air Observation System
. To install Sonde or Windprofiler network;
Strategic Plan of DOMStrategic Plan of DOM
DOM / MOWRAM
![Page 46: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/46.jpg)
• Our system do not have modernized equipment. • Problems
* need local warning to the people & farmers * no upper air observation
• There is an urgent need for institutional strengthening, include seismology and oceanography.
• Lack of budget for the development of station network.
• No funding for climate change adaptation.• Lack of people involvement for climate change
adaptation.
DOM / MOWRAM
Challenge on Climate Change AdoptationChallenge on Climate Change Adoptation
![Page 47: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/47.jpg)
• Training on Numerical Weather Prediction in Thailand.
• Training on Climate Forecasting in Vietnam.• Seminar on tsunami understanding in Singapor.• Training on tsunami modeling in Thailand.• Seminar on Climate Change impact into irrigation
system in Thailand.
DOM / MOWRAM
Resources in Cambodia for the Asian Country
Resources in Cambodia for the Asian Country
![Page 48: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/48.jpg)
Thank you for your attention
Thank you for your Thank you for your attentionattention
DOM / MOWRAM
![Page 49: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/49.jpg)
DOM / MOWRAM
![Page 50: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/50.jpg)
Dr. SYAMSUL MAARIFChief
NATIONAL AGENCY FOR DISASTER MANAGEMENT(BNPB)- INDONESIA
DISASTER MANAGEMENT AND CLIMATE CHANGE ADAPTATION
IN INDONESIA
![Page 51: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/51.jpg)
Content1. Features of Disasters in Indonesia2. Disaster Management Organization Systems
1. Current Situation2. Challenges3. Efforts and Trial being made4. Resources for other countries
3. Improvement of Disaster Management Capacity in Communities and Local Societies1. Current Situation2. Challenges3. Effort and Trial being made4. Resources for other countries
4. Climate Change Adaptation in Disaster Management1. Organization concerned in Indonesia2. Challenges and Efforts3. Resources for other countries
2
![Page 52: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/52.jpg)
1. Features of Disaster in Indonesia (2002-2008)
3
Death Number
Disaster Occurrences
Climate related disasters in Indonesia• drought, flood, landslides, wild fires and
wind storm count for 50.3% of the number of events,
• contributing to total losses from disaster:– 68.3% of the total number of affected people,– 7.9 % of total death,– 25.1% of total property damage
![Page 53: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/53.jpg)
Disaster Management Organization System in
Indonesia
4
![Page 54: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/54.jpg)
2.1 Disaster Management Organization System
5
PRESIDENT RI
Ministries/ Departments
GOVERNOR
BNPB
Non Departments Institution
BUPATI/MAYOR
BPBD
Agencies
CAMAT
BPBD
Agencies
Head of Village
COMMUNITY
National
Provincial
District/Municipal
Sub District
Village
![Page 55: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/55.jpg)
2.2 Challenges for Establishing and Managing Effective Disaster Management Organization
• Shifting of paradigm in disaster management, from response to disaster risk reduction.
• Decentralization in disaster management authority, there are some gap between central and local level.
• Changing of Disaster Management Organization System.
• Lack of resources for disaster management in local levels, such as:– Infrastructure– Expertise– Budget allocation
6
![Page 56: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/56.jpg)
2.3 Efforts and Trials being made to Establish and ManageEffective DM organization
• Set up New Disaster Management Systems (enactment of DM Law No.24/2007).
• Establish disaster management organizations at all levels (role an responsability)
• Develop and socialize national system for disaster management sothat DM organizations know how and what to contribute to the DMsystem.
• Assist Local DM authority by providing guidance, training, excercise, technical assistance.
• Strengthening Local Government in establishing DM infrastructure(EOC, and ICT systems)
• Capacity building for human resources and institutions related to DM, including community level
• Establish coordination mechanism among relevant stakeholders
7
![Page 57: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/57.jpg)
2.4 DM Resources in Indonesia for the Other Countries
• BNPB (National Agency for Disaster Management)– Personnel, Equipment, and Logistic
• BASARNAS (National Agency for Search and Rescue)– SAR Team and Equipment
• TNI (Indonesia Armed Forces)– Personnel, Aircrafts, ships for SAR, distribution of medical purpose
• POLRI (National Police)– Identification Team, Personnel
• Ministry of Health– Medical Team and supply
• PMI (Indonesian Red Cross)– Medical Team and supply
8
![Page 58: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/58.jpg)
Improvement of Disaster Management
Capacity in Communities and Local Societies
9
![Page 59: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/59.jpg)
3.1 Current Situation of DM in Communities and Local societies
• Significant awareness on DM/DRR at community/local level• Participatory CBDRM/CBDRR in various parts of the country• Early warning system established at community level• Local platform/forums established to strengthen coordination
and ensure integrated planning and action• Most vulnerable ones are often the poorest and lack of
capacity to invest in long-term protective preparedness measures
• Vulnerable communities are dependent on national or international institutions and formal assistance mechanism
• Provision of DRR supports are mostly planning and training exercises for response preparedness
10
![Page 60: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/60.jpg)
3.2 Challenges for Improving DM Capacity in Communities and Local Societies
• Awareness on DM/DRR at community/local level is uneven• EWS in place but lack of knowledge on how to react to the
early warning information• Lack of capacity and resources (human, financial and
infrastructure)• Emphasis more on response rather than on risk management
/reduction• Local agency for disaster management is currently in the
process of being established (in some parts of the country)• Lack of awareness on local risk and vulnerability
11
![Page 61: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/61.jpg)
3.3 Efforts being made in order to improve DM Capacity in Communities and Local Societies
• Increase knowledge and capacity of local community to identify their risks and vulnerabilities
• Increase awareness and improve preparedness that is applicable for practical action
• DRR support should also include the empowerment of communities and the provision of longer-term investment
• Stronger political commitment and financial support to build capacity of community
• Establish mechanism to scale-up community-based initiatives• Joint efforts between humanitarian and development actors to
reduce or eliminate possible over-dependency by communities
12
![Page 62: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/62.jpg)
3.4 Useful Resouces for other ASEAN countries
• LIPI (Indonesian Institute of Sciences)• PMI (Indonesian Red Cross)
– Medical Team and supply, rapid assessment, community preparedness
• Non-Government Organization– MPBI (Indonesian Society for Disaster Management)– Global Rescue Network– IDEP Foundation– Lingkar Association– Muhammadiyah Disaster Management Center– Nahdlatul Ulama CBDRM– YAKKUM– KARINA (Caritas Indonesia):– KOGAMI (community preparedness and early warning at community level)– Mer-C (medical team)– 118 Ambulance– Yayasan Air Putih– Yayasan Tanggul Bencana Indonesia
13
![Page 63: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/63.jpg)
Climate Change Adaptation in Disaster Management
14
![Page 64: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/64.jpg)
NATIONAL COUNCIL FOR CLIMATE CHANGE (DNPI)
Chairman : President RIVice : 1. Coordinating Minister for People Welfare,
2. Coordinating Minister for FinanceSecretary/Members : Minister of EnvironmentMembers : 1. State Secretary Cabinet Secretary
2. Minister of Environment3. Minister of Finance4. Minister of Home Affairs5. Minister of Foreign Affairs6. Minister of Energy and Mineral Resources7. Minister of Forestry8. Minister of Agriculture9. Minister of Industry
10. Minister of Public Works11. Ministter of National Planning/National Planning Board12. Minister of Marine and Fisheries13. Minister of Trade14. Minister of Research and Technology15. Minister of Transportation16. Minister of Health17. Head of Meteorological, Climatological and Geophysical Agency
15
4.1 Organizations concerned with Climate Change Adaptation
![Page 65: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/65.jpg)
4.2 Current Situation of CCA in Indonesia
• ICCOP Meeting in 2007 in Bali: Government launched the IndonesiaCountry Report: Climate Variability and Climate Change and theirImplication, and the National Action Plan Addressing Climate Change (RAN-PI/NAPACC) on Nov 2007.
• National Development Planning Agency produced a draft document in December 2007 on National Development Planning Response to Climate Change: Long-Term and Medium-Term 2004 – 2009 National Development Planning Climate Change Mitigation and Adaptations Programs.
• Joint effort between Ministry of Environment and UNDP developed the Indonesia’s Climate Change Adaptation Programme (ICCAP) which was drafted in December 2007.
• Indonesia has established National Council for Climate Change (DNPI) July 4, 2008
16
![Page 66: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/66.jpg)
4.2 Challenges in Climate Change Adaptation
Challenges:
• Harmonization of CCA & DRR (State Ministry of the Environment & National Agency for Disaster Management)
• Limited number of research activities pertinent to climate change adaptation -> needs improvement of climate modeling which cost requirement
• Unimplemented of financial instruments mechanism related to adaptation:– Agriculture insurance– Climate risk insurance– Preventive infrastructure investment for densely populated areas
17
![Page 67: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/67.jpg)
Indonesia’s Climate Change Adaptation Programme (ICCAP)Approach :• Contribute to embedding climate risk and opportunity management into development
planning within the framework of the MDG• Ensure consideration of CC and opportunities in development decisions and
investment to improve socio-economic resiliency of sectors and communities to CC and CV
ICCAP targeted the following output:1. National Consortium and Research Grant Facility for Climate Risk and Opportunity
Management (CROM)2. Guidance for climate resilient spatial planning, settlement design and infrastructure
systems in key sectors and priority geographic areas3. Education, awareness and training programs to enhance CROM in seasonal/inter-
annual and multi-decadal time scales4. Community, private and government institutional capacities strengthened to
undertake CROM5. Policy, legal and regulation framework for CROM implementation in the
seasonal/inter-annual and multi-decadal time scales6. Climate and development information exchange systems established in a number of
priority sectors and vulnerable regions 18
4.3 Efforts in Climate Change Adaptation
![Page 68: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/68.jpg)
4.4 CCA Resources for Other ASEAN Countries
• State Ministry for Environment (KLH)• Ministry of Marine and Fisheries• Ministry of Health• Ministry of Agriculture• Ministry of Forestry• Meteorology, Climatology and Geophysical Agency
(BMKG)• National Agency for Disaster Management (BNPB)• Indonesian Red Cross (PMI)• Universities (IPB, ITB, UGM etc.)
19
![Page 69: CAMBODIA - JICA · • System of information flow, coordination concerned during disaster are not clearly established in advance. • Less connection and cooperation between NCDM](https://reader033.vdocuments.mx/reader033/viewer/2022060414/5f1211080c2f9078044ef18d/html5/thumbnails/69.jpg)
NATIONAL AGENCY FOR DISASTER MANAGEMENT (BNPB)INDONESIA 20