calin negret

42
CALIN NEGRET CV | PORTFOLIO

Upload: negret-calin

Post on 04-Apr-2016

285 views

Category:

Documents


0 download

DESCRIPTION

CV | PORTFOLIO

TRANSCRIPT

Page 1: CALIN NEGRET

CALIN NEGRET

CV | PORTFOLIO

Page 2: CALIN NEGRET

1

Name Calin Negret Email [email protected] Birth Date 16.10.1989 Bucharest, Romania Phone +40 724 259 457

TOOLS

EDUCATION

10/2012 - 07/2014 Master of Science in Architecture Tehnical University of Cluj Napoca - Faculty of Architecture and Urbanism

10/2008 - 07/2012 Bachelor of Science in Architecture Tehnical University of Cluj Napoca - Faculty of Architecture and Urbanism 09/2004 - 07/2008 “Decebal” European College, Deva, Romania Mathematics, Informatics, English Baccalaureate degree, High school English Certi�cate, IELTS

WORK EXPERIENCE | WORKSHOPS | VOLUNTEER WORK

Student summer internship at a number of small Architecture of�ces in Cluj Napoca and Deva, Romania.

Architecture Days - ZA2009 Volunteer | Cluj Napoca, Romania - 2009

CVArchitecture Days - ZA2011 - Parametric workshop - Parametric pavillion build team | Cluj Napoca, Romania - 2011

Lacuste In Eter - Parametric Workshop | Timisoara, Romania - 2012

Venice Architecture Bienalle - Romanian pavillion - Illustrator design work | Bucharest - 2012

Architecture Days - ZA2013 - Parametric pavillion competition 3’rd place - Branding image ZA2013 | Cluj Napoca - 2013

TIFF - Transylvania International Film Festival - volunteer - Cluj Napoca - 2013

RevitArchitectureAutoCAD ArchitectureRhinocerosGrasshopper3dsMax+VRayPhotoshopIllustratorInDesign

EnglishGermanFrench

LANGUAGE

Page 3: CALIN NEGRET

2

Name Calin Negret Email [email protected] Birth Date 16.10.1989 Bucharest, Romania Phone +40 724 259 457

TOOLS

WORK EXPERIENCE | WORKSHOPS | VOLUNTEER WORK

Student summer internship at a number of small Architecture of�ces in Cluj Napoca and Deva, Romania.

Architecture Days - ZA2009 Volunteer | Cluj Napoca, Romania - 2009

PortfolioArchitecture Days - ZA2011 - Parametric workshop - Parametric pavillion build team | Cluj Napoca, Romania - 2011

Lacuste In Eter - Parametric Workshop | Timisoara, Romania - 2012

Venice Architecture Bienalle - Romanian pavillion - Illustrator design work | Bucharest - 2012

Architecture Days - ZA2013 - Parametric pavillion competition 3’rd place - Branding image ZA2013 | Cluj Napoca - 2013

TIFF - Transylvania International Film Festival - volunteer - Cluj Napoca - 2013

INTERESTS | HOBBIES

Curious, social, team oriented.

Interested in: art, architecture, tehnology and science, downhill/dirt biking, snowboard/ski, photography, basketball, ping-pong, stand-up comedy .

[M.Sc.] Sport Facility 3

[B.Sc.]

House in Bucharest 11

Apartment House Crooked 15

Seniors Retreat 19

Puppet Theatre 23

Community Centre 29

VARIOUS PROJECTS

Light vs Water 35

Flap 37

Workshop 39

Page 4: CALIN NEGRET

1

3

The MSc project represents a step forward, aiding the development of local economy through tourism and providing athletes top conditions for practice and professional racing. The overall concept began at the thought that fragmentation and organic development are the main ingredients to provide sustainability at an urban level. This concept transposed at the project level resulted in a system of flexible spaces, that have the possibility of growing or shrinking thus offering the advantage of sustainable and efficient use.

Sport Facility [M.Sc.] project

Page 5: CALIN NEGRET

2

4

[M.Sc.] Sport Facility 3

[B.Sc.]

House in Bucharest 11

Apartment House Crooked 15

Seniors Retreat 19

Puppet Theatre 23

Community Centre 29

VARIOUS PROJECTS

Light vs Water 35

Flap 37

Workshop 39

Page 6: CALIN NEGRET

3

5

Construction was solved by the reuse of shipping containers for the living and closed spaces. For the open and common areas 3D printing was the best option, as it offers a large amount of customising and excellent reproduction of organic elements. Therefore the evolution scenary is basically endless provided the use of 3D printing tehnology. Starting from 3 base modules that incorporate the acces area , accommodation and training area, the options of size and space lead to infinite possibilities which will help achieve the perfect efficiency through sustainable development.

3

Construction Diagram

Page 7: CALIN NEGRET

4

6

Page 8: CALIN NEGRET

5

7

Section BB’

Construction Diagram

Page 9: CALIN NEGRET

6

8

Section BB’

Page 10: CALIN NEGRET

7

9

GS - 5 m² GS - 5 m²

Camera - 20 m² Camera - 20 m²

GS - 5 m² GS - 5 m²

Camera - 20 m² Camera - 20 m²

GS - 5 m²

GS - 5 m²

Camera - 20 m²

Camera - 20 m²

GS - 5 m²

GS - 5 m²

Camera - 20 m²

GS - 5 m²

Camera - 20 m²

Camera - 20 m²

GS - 5 m²

GS - 5 m²

Camera - 20 m²

Camera - 20 m²

GS - 5 m²

GS - 5 m²

Camera - 20 m²

GS - 5 m²

Camera - 20 m²

Camera - 20 m²

Vestiare B - 100 m²

Vestiare F - 100 m²

Cafenea - 35 m²

C

C’

- 2.60 m

- 2.60 m- 2.60 m

A

A’

B B’

Level 1 Plan Detail Section BB’

Ground Floor Plan Plan Level -1

Page 11: CALIN NEGRET

8

10

Section BB’ Section AA’

Plan Level -1

Page 12: CALIN NEGRET

9Ground Floor Plan Plan Level -1

11

The design is based on the necessity of having a relaxing environment in a very noise polluted and congested area in the center of Bucharest. The relationship between the exterior and the interior is crucial, thus the approach of the inclosed design, avoiding as much as possible the exterior and focusing on the interior development.

House in Bucharest [B.Sc.] 2’nd year project

Page 13: CALIN NEGRET

10Plan Level -1

12

Page 14: CALIN NEGRET

11

13

Page 15: CALIN NEGRET

12

14

DD

CC

BB

AA

1

1

2

2

3

3

DD

CC

BB

AA

1

1

2

2

3

3

DD

CC

BB

AA

1

1

2

2

3

3

Ground Floor Level 1 Level 2

Page 16: CALIN NEGRET

13

15

Apartment house crooked is the result of a vaguely described project theme and a urban constraint of merging a side of high rise buildings with another consisting of houses. The concept was developed keeping in mind the conditions given by the site and the functions needed by the community. The shell design was done by analysing the sun and wind factors. Furthermore the the apartment house is divided into six individual parts that leave room for pedestrian flow and maintain a connection with the offices at ground floor.

Apartment House Crooked [concept] [B.Sc.] 3’rd year project

Page 17: CALIN NEGRET

14

16

Page 18: CALIN NEGRET

15

17Data analysis Mixed use illustration Concept diagram

Page 19: CALIN NEGRET

16

18

Page 20: CALIN NEGRET

17Data analysis Mixed use illustration Concept diagram

19

One of the main features of this project are the inner courtyards that separate the interior space reating open, easily accesible, areas. This feature ensures easy acces to the exterior environment even in the cold winters or hot summers. The courtyards extend upwards to limit the wind speed and to create a visual signal. Furthermore the building incorporates all the facilities needed to be a confortable residence for the elderly.

Seniors Retreat [B.Sc.] 4’th year project

Page 21: CALIN NEGRET

18

20

Page 22: CALIN NEGRET

19

21

IJKLM H G F E D

F'G'

H'I'J'K'L'

13'12'

11'10'

9'8'

7'6'

5'4'

3'

E' D'

CC

BB

AA

13.11.'

11.10.

9.8.

7.6.

5.2.

12.

NN

4.3.

PP

OO

1.1'2'

64.05

66.68

55.80

66.689.25

1 .8 37 .9 1

7 .2 03 .7 9

5 .7 12 .3 8

5 .3 51 1. 3 6

3 .9 74 .3 2

4. 684. 07

4. 056. 04

7. 204. 10

5. 382. 74

5. 022. 80

4. 334. 25

3. 994. 33

9.882.8243.9610.47

48.477 .33

4.065.494.608.755.005.005.003.505.005.005.054.615.49

3.995.574.898.4528.805.052.807.29

3.703 .93 5.45

5.123 .60

9.62

1.53

2.11

2 .60

2.80

4.951 .98

10.00

11.761 0.52

6 .1 0

15.47

8.30

3.34

2.92

10.10

9.05

8.33

4.564.19

9.34

10.63

4.10

1.764 .18

1 .7 2

2 .6 3

1.001.00

1.00

1.002.04

2.04

1.00

0.79

IJKLM H G F E D

F'G'

H'I'J'K'L'

13'12'

11'10'

9'8'

7'6'

5'4'

3'

E' D'

CC

BB

AA

13.11.'

11.10.

9.8.

7.6.

5.2.

12.

N

4.3.

P O

1.1'2'

67.055. 74

4. 153. 97

2. 413. 63

7. 244. 15

12 .972. 96

4. 274. 29

1 8.9 97 .2 0

3 .805 .7 0

2 .3 85 .3 6

1 1. 351 1. 2 8

9.592.8143.9610.4766.83

55.96

4 8.792 .82

4 .36

66.844.015.574.644.624.145.025.005.003.505.005.005.054.615.493.875.739.723.5728.804.753.097.51

2.60

3.17

10.74

8.98

7.01

9.7510.44

4.12

4.49

10.25

7 .07

4 .8 4

1 1.2 8

4.71

2.56

1 1. 8 1

8.46

3.35

6.96

6.55

8.89

3.28

10.13

5.00

5.00

3.09

5.002.91

5.00

5.00

5.00

Ground Floor Plan 1’st Floor Plan

Page 23: CALIN NEGRET

20

22

Page 24: CALIN NEGRET

21

23

Starting from a task of combining a puppet theatre and a workshop area for children into one program, the concept developed as a unit that unfolds itself in the available space, thus creating an interior protected space from noise and traffic. One of the main challenges was to make the building seem smaller, challenge that has been paired with the necessity of a public space in front of the building. The response to this problem was to break the building into diffenrent pieces and bending it around a centre creating a shape that peels itself to the ground, creating a continous shape.

Puppet Theatre [B.Sc.] 5’th year project

Page 25: CALIN NEGRET

22

24

Page 26: CALIN NEGRET

23

25

B

B2.

2. 3.

3.

F

4.

4.

1.

1.

5'

6'

7'8'

9.

A'

A

6.

6.

E E

7.

7.

8.

8.

B'

9'

5.

5.

10.

G I

J

K

K.

L

9..10..

H

12.

12.

B''

C''D''

11.

11.

9''

10''

9... 11.. 12''

13.

14.

9'''

M

C

7"

D

61.1 m

3.98 m

9.79 m

8.76

m9.

73 m

8.64 m

10.2

3m

5.58 m

15.4

6 m

16.9

6 m

21.24 m

80.82 m

1.99m

19.09 m

4.98m

3.56

m

2.61 m

3.56

m

1.66 m 3.94 m

3.56

m

2.13m

1.76 m

16.01 m

8.52

m

4.85 m

3.97

m

4.47

m

8.62 m

12.97 m

1.24

m

3.53

m

4.25 m

6.31 m

5.05

m

6.31 m

4.78

m

7.6 m

10.8

7 m

10.8

7 m

8.31 m

5.5 m

4.34

m

1.85 m

3.28

m

6.57 m2.93 m

0.99

m

2.5 m

4.99

m

4.32 m

4.99

m

2.48 m

4.9

m

6.5 m

2.74 m

3.02 m

5.27 m

6.73m

12.22 m

2.67 m

11.32 m

14.45 m

3.52 m

4.44 m

9.34 m

9.65 m

9.63 m

6.83 m

1.83 m

5.1 m

2.04

m

4.45

m

3.83 m

4.09

m4.

04 m

4.1

m

12.2

3 m

15.67 m

16.4

8 m

4.4 m4.6 m 0.2 m3.45 m 3.06 m

2.92

m

2.25

m

2.5 m

2.89

m2.

49 m

10.7

5 m

3.05

m

5.68 m

4.09

m

5.68 m

5.68 m

5.68 m6.01 m5.56

m

12.01 m

13.3

1 m

12.01 m

2.9

m

4.51 m

4.76 m

5.48 m

3.9 m

4.6 m0.08 m 4.11 m1.58 m

3.38 m

1.66 m

5.53

m

5.85 m

3.57

m

5.85 m

5.95 m

4.13

m

5.1

m

3.75 m

15.1

4 m

4.35

m

3.74 m

4.35

m

4.93 m

5.99 m

6.01 m

5.68 m

3.15

m4.

87 m

5.21

m5.

57 m

m 5.0m 5.2m 86.5m 10.6m 99.5

14.91 m 15.65 m

m 82.6m 19.5m 75.6m 39.2m 5.2

5.81 m

3.56 m

15.09 m

9.13 m

3.82

m9.

73 m

3.72 m 3.43 m

8.06

m4.

03 m

3.82

m

11.47 m

5.26 m

4.35 m

6.33m

12.47 m

+/-0 m

+/-0 m

+/-0 m

+/-0 m

-1 m

+/-0 m

+/-0 m

+/-0 m

+ 2.06 m

+/-0 m

+/-0 m +/-0 m

+/-0 m

+/-0 m

+ 2.38 m

+/-0 m

+/-0 m -4 m

-2.38 m

+/-0 m

N"

N"N.

N.

N...

N".N.."

N..

30..

30..

13..

13..

O

O.

14..

14..

15..

15..

16..

16..

17..

17..

18..

18..

19..20..

20..

21..

21..

22..

22..

23..

23..

25..

25..

26..

26..

27..

27..

28..

28..

29..

29..

NN

P P

P'

P'

24..

24..

14.84 m22.25 m

3.62 m

11.7

8m

15.49 m

2.3 m

15.44

m

13.32 m

5.86

m

7.22

m

18.76 m

6.9

m

9.33 m

6.9

m

7.64 m 4.47 m

4.6m

16.86 m

4.6m

7.17 m

23.59 m

2.23

m4.

98 m

6.23 m 4.09 m 3.94 m

5.12 m 4.2 m

7.59 m

9.27 m

2.25 m

6.45 m

5.25 m

2.3 m

4.53 m

5.06 m

6.23 m 4.09 m 3.94 m m 46.7m 2.4m 21.5m 5.42.25 m 6.1

8 m

5.55 m

3.73 m

6.54 m6.78 m

2.58 m

2.23

m

2.23

m

20.66 m

9.29 m

4.65m

3.44 m

4.65m

4.25 m

3.65 m 4.09 m 3.94 m 4.5 m 5.13 m 4.2 m

6.64

m 7.82

m 8.96

m

7.82

m

6.48

m

5.39

m

7.59 m5.39

m

4.75 m 4.58 m

6.95

m

10.0

7 m

15.6 m

7.77m

5.89 m

3.67 m

2.15 m

+ 3.00 m+ 3.00 m

+ 3.00m

+ 3.00 m

+ 3.00m

+ 2.40 m

+ 3.00 m

+ 3.00 m

+ 3.00 m

+ 3.00 m

+ 3.00 m

Ateliere

46

78

9 1110

12

12

13

14

15

53

1

4

2

B

B’

Theatre Floor Plan

Workshop Floor Plan

Page 27: CALIN NEGRET

24

26

Page 28: CALIN NEGRET

25

27

2.10

3.60

3.20

3.20

7.20

0.70

2.20

Invelitoare Tabla 2mmTermoizolatie Vata Minerala 150mmBariera VaporiTabla Cutata 45mmStructura Spatiala Sustinere Intvelitoare 700mm

Beton Elicopterizat Strat de poza (adeziv)Sapa de EgalizareFolie PVCTermoizolatie (polistiren extrudat 10cm)Placa BA 15cmHidroizolatieSapa Suport Folie PolietilenaBalast compactat natural 20cmPamant

Beton Elicopterizat Strat de poza (adeziv)Sapa de EgalizareFolie PVCTermoizolatie (polistiren extrudat 10cm)Placa BA 15cmHidroizolatieSapa Suport Folie PolietilenaBalast compactat natural 20cmPamant

Parchet Lemn StratificatStrat de poza (adeziv)Sapa de EgalizareFolie PVCTermoizolatie (polistiren extrudat 10cm)Placa BA 15cmHidroizolatieSapa Suport Folie PolietilenaBalast compactat natural 20cmPamant

Pavele din BetonStrat pietris pentru drenarea apeiGeotextil Membrana HidroizolantaTermoizolatie 15cmFolie bariera contra vaporilorStrat DDC (difuzie, decompresiune, compensare)Strat egalizare beton usorBeton de panta (1,7-7%)Planseu orizontal din beton armat monolitFinisaj Interior

Strat vegetalGeotextilStrat Pietris, pentrui drenarea rapida a soluluiGeotextilMembrana hidroizolantaTermoizolatie 15cmFolie bariera contra vaporilorStrat DDC (difuzie, decompresiune, compensare)Strat de egalizare din beton usorBeton de panta (panta 1,5-7%)Planseu din beton armat monolitFinisaj interior

Podea Rasina EpoxilicaSapa de EgalizareFolie PVCFonoizolatiePlaca BA 15cmTermoizolatie polistiren expandat 10cmFinisaj interior

Podea Rasina EpoxilicaSapa de EgalizareFolie PVCFonoizolatiePlaca BA 15cmTermoizolatie polistiren expandat 10cmFinisaj interior

+ 10.00m

Subsol

Parter+/- 0.00m

- 4.00m

+ 7.00m

Ateliere+ 3.00m

9 910

3 310

7

71 1

13

15

- 3.30m

- 4.00m

A A’ AA’

Beton Elicopterizat Strat de poza (adeziv)Sapa de EgalizareFolie PVCTermoizolatie (polistiren extrudat 10cm)Placa BA 15cmHidroizolatieSapa Suport Folie PolietilenaBalast compactat natural 20cmPamant

9

10

8

3

6

25

4

8

7

1

1212

14

14 15

16

+/- 0.00m

14

Section 1

Section 2

Construction Details

Page 29: CALIN NEGRET

26

28

Page 30: CALIN NEGRET

29

The programme was designed to help diminish the generation gap issues through a better understanding and common development. The diagram illustrates the gaps between the three generations: young, mid-life and the elderly. Furthermore taking consideration of the different schedule of the three categories it would be almost impossible for them to meet in random. Thus the necessity of a community centre where all could meet in a common ground to settle their differences.

Community Center [B.Sc.] 5’th year project

27

Page 31: CALIN NEGRET

30

Generation Chart

Segregation

Continuity

28

Page 32: CALIN NEGRET

29

31 Site Plan

Page 33: CALIN NEGRET

30

32Floor Plan

Page 34: CALIN NEGRET

31 Site Plan

33

Page 35: CALIN NEGRET

32Floor Plan

34

Page 36: CALIN NEGRET

33

35

“Light vs Water” is a concept pavilion which creation is based on the study of interaction between reflecting surfaces. Light is the bonding element as one reflects upon the other. The pavilion consists of a suspended walkway above the surface of the water and a number of different size prisms that split light, creating a clear and colourfull representation of the dispersion phenomenon.

Light vs Water concept pavillion

Page 37: CALIN NEGRET

34

36

Page 38: CALIN NEGRET

35

37

Architecture evolves through an array of past features to a certain point where it freezes time and space as a solid shape. It’s the weakness of not being able to continuously respond and adapt to new requirements and thus rendering it obsolete. The concept of “Green” should spell “Evolution” beyond the point of the project. It should respond to future requirements. It should in teract with the user. It should FLAP. The main feature of the project is a canvas that rises and lowers depending of the number of people gathering underneath. It defines space. The more people together the higher it goes; thus evolving from a small bump to a large space. It’s a continuously evolving space.

120 Hours - Competition Entry

Page 39: CALIN NEGRET

36

38

Page 40: CALIN NEGRET

39

Implication: logistics, model making, build teamTutors: Dimitrie Andrei Stefanescu, Patrick Bedarf

Images courtesy of tutor - Patrick Bedarf [www.a-ngine.com]

Images courtesy of organiser - AStA Cluj [Architecture Student Association]

Images courtesy of organiser - EduKube [www.edukube.org]

Implication: logistics, build teamTutor: Daniel Piker

Implication: logistics, model making, build teamTutors: Ionut Anton, Dana Tanase, Irina Bogdan Alex Cozma, Oana Simionescu

Parametric Workshop Cluj_01

Parametric Workshop Cluj_02

Parametric Workshop Timisoara

2012

2013

2011

Page 41: CALIN NEGRET

40

Page 42: CALIN NEGRET

Thank you for viewing andHave a nice day !

email [email protected] +40 724 259 457