Page 1: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

Cairo UniversityFaculty of EngineeringDepatment of Arch.Post Graduate Studies2004-2005

Presented to :

Dr. Hatem Elshafai

Presented by:

Reem Mohamad Hegazy

Page 2: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

Topic Number: 79 79

PROJECT TEAM RELIED HEAVILY ON DIGITAL COLLABORATION TO REBUILD THE

WINTER GARDEN QUICKLY

By: Victoria Rivkin With D.S Victoria Rivkin With D.S..

Date:Date: March March 2003.

Presented By:Reem Mohamad Hegazy.

Web Site: WWW.arcWWW.archrecord.construction.comrd.construction.com/features/digital/features/digital..

Other Sites:WWW.newsday.com/news/local/newyorkWWW.newsday.com/news/local/newyork WWW.lowermanhattan.info/news/wintergarden-reopensWWW.lowermanhattan.info/news/wintergarden-reopens

Page 3: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

The Event ……..

The Winter Garden suffered extensive damage following

the collapse of the World Trade Center towers on September 11, 2001.

The owner turned to Cesar Pelli & Associates, the original architect, for restoring the blg.

The Garden’s

Photos after

the attack.

Page 4: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

About The Restoration Project….

- Changing the entire character of the Winter Garden in a

short period of time.

- Creating good transitions between the new and the old details.

Duration: nine months.

Cost: 50 million dollars.

Considerations:

Page 5: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

The Restoration Project….

-Rendering Of The Winter Garden’s New Interior Was Used To Help in Selecting

Materials

1-Replacing the marble flooring using 60,000 square feet of tri-color Italian marble.

INT

ER

IOR

…..

2-Replacing nearly 70 percent of the arched ceiling.

Page 6: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

3-Replacing half of the grand staircase.

The Restoration Project….IN

TE

RIO

R…

..

4-Redesign the celebrated glass dome.

5-Replacing sixteen 43-feet tall palm trees from Florida.

Page 7: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

The Restoration Project….

6-Replacing the ruined east facade by a sheer wall of “u” glass

that spans from floor to the ceiling and overlooks West Street.

New Entrance

EX

TE

RIO

R…

..

7-Designing a new eastern entrance to the atrium instead of the destroyed bridge which was extending from the Winter Garden atrium connected Battery Park City to the World Trade Center.

Page 8: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

The Restoration Project Steps….

1-Digitizing the original contract documents from the 1980s By:

Using them as an underlay to create CAD drawings.

Scanning them.

2-Using these drawings to verify key dimensions and struc-

tural elements. Col

lect

ing

Dat

a…..

Page 9: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

The Restoration Project Steps….

3-The architect did hand sketches of proposed changes, then turned them over to dboxstudio.

4-Creating a variety of images of the Winter Garden as it underwent redesign.

Red

esig

n pr

oces

s….

5-Making a 3D frame of the project onto which were overlaid

different materials and facade designs to evaluate materials.

Page 10: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

The Used Software…..T

he U

sed

Sof

twar

e….

-The architects used softwares in the project like:

For creating visualiz- ations 3D Studio VIZ.

Photo - shop.

For rendering Dbox-studio.

For drawings Autocad.

In The Restoration Proj….

Page 11: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad

The Restoration Project result ….A

fter

The

Res

tora

tion…

.

It was reopened to the public on September 18, 2002

following an intensive yearlong restoration effort. Today the restoration is completed and the soaring glass

dome returned to its splendor.

AFTERBEFORE