cairns shipping development projecteisdocs.dsdip.qld.gov.au/cairns shipping development/revised...
TRANSCRIPT
CAIRNS SHIPPING DEVELOPMENT PROJECT
Revised Draft Environmental Impact Statement
APPENDIX J: Assessment of Materials Proposed for Dredging Report (2016)
16 January 2017
ADDITIONAL STUDIES - DREDGED MATERIALS
Cairns Shipping Development Project
RE
PO
RT
Report Number. 1546223-008-R-Rev2
Distribution:
1 Electronic Copy - Flanagan Consulting Group
16 January 2017 Report No. 1546223-008-R-Rev2 i
Table of Contents
1.0 INTRODUCTION ........................................................................................................................................................ 1
2.0 GROUND MODEL ..................................................................................................................................................... 1
3.0 VOLUMES AND DISTRIBUTION OF MATERIALS .................................................................................................. 2
4.0 ACID SULFATE SOILS (ASS) .................................................................................................................................. 3
5.0 STIFF CLAYS ............................................................................................................................................................ 3
6.0 SANDS....................................................................................................................................................................... 3
7.0 IMPORTANT INFORMATION .................................................................................................................................... 4
FIGURES
Figure F001 – Plan of Channel - Sheet 1
Figure F002 – Plan of Channel - Sheet 2
Figures F003 to F012 – Channel Cross Sections
APPENDICES
APPENDIX A Important information relating to this report
16 January 2017 Report No. 1546223-008-R-Rev2 1
1.0 INTRODUCTION
Flanagan Consulting Group (FCG) previously commissioned Golder Associates Pty Ltd (Golder) to provide
geotechnical advice as part of the Revised Draft Environmental Impact Statement for the Cairns Shipping
Development (CSD) Project. Geotechnical input related to the assessment of the values and constraints
associated with the materials proposed to be dredged included the following:
Assessment of subsurface conditions likely to be encountered in the proposed dredging;
Assessment of the geotechnical properties of the materials to be dredged;
Assessment of the ASS properties of the materials to be dredged.
Preparation of a 3D model of ground conditions relevant to the proposed dredging.
The results of the previous studies were presented in Golder report 1546223-006-R-Rev1 in October 2016.
Subsequent to the studies Golder was commissioned to re-assess the materials likely to be encountered
during dredging based on revised channel design information provided by Ports North.
This report presents the results of our assessment. Note that this report should be read in conjunction with
our previous report, and that where relevant this report supersedes the previous report.
2.0 GROUND MODEL
As outlined in our previous report an interpreted 3-dimensional (3D) model of ground conditions was
developed using the VulcanTM geological modelling software. The main feature of the model was the top of
stiff clay, with this boundary surface being equivalent to the base of soft clay where a soft clay layer is
present or, coincident with the sea bed where stiff clay occurs at sea bed level.
The modelled surface of the stiff clay was used in combination with the bathymetric survey information and
channel design information provided to estimate the expected volumes of different materials for maintenance
and capital dredging.
The initial model was based on the following:
Bathymetric survey – “Composite survey data.dxf” provided by email to Golder by BMT JFA on 2
August 2016;
Capital Channel design – “Rev B Revised Draft EIS Channel design Model.dxf” provided by email to
Golder by BMT JFA on 2 August 2016;
Maintenance Channel design – “Existing channel design 2016-08-02.dxf” provided to Golder by BMT
JFA on 2 August 2016;
The model has been revised based on the following:
Post 2016 bathymetry – provided by email from Ports North on 27 October 2016; and
Ports North mark up of channel cross sections prepared by Golder at 250 m intervals along the channel
– provided in emails from Ports North on 28 November, 30 November and 12 December, 2016.
Based on the revised model, plans showing where dredging is proposed and the materials expected to be
encountered in the proposed capital dredging are shown on Figures F001 to F002.
Cross sections of the channel showing the design dredging profiles and the materials expected to be
encountered in the dredging are shown on Figures F003 to F012.
16 January 2017 Report No. 1546223-008-R-Rev2 2
3.0 VOLUMES AND DISTRIBUTION OF MATERIALS
Based on the revised model the re-calculated volumes of materials to be dredged are summarised below.
Table 1: Volumes of Materials to be Dredged
Material Type Volume (m3)
Soft clays 698,755
Stiff clays 92,309
Total 791,064
The distribution of materials within the capital dredging was also calculated by chainage and is summarised below.
Table 2: Distribution of Materials to be Dredged by Chainage
Chainage Volume of Soft
Clays (m3) Volume of Stiff
Clays (m3) Total Volume
(m3)
11000-11500 42558 2783 45340
11500-12000 356 0 356
12000-12500 880 2316 3196
12500-13000 21346 2160 23506
13000-13500 13812 579 14391
13500-14000 3337 1923 5260
14000-14500 6419 9541 15960
14500-15000 12923 30687 43610
15000-15500 31136 1280 32416
15500-16000 44424 15965 60390
16000-16500 47187 2997 50184
16500-17000 34641 380 35021
17000-17500 43571 6213 49784
17500-18000 57749 12499 70248
18000-18500 89979 2382 92361
18500-19000 77999 43 78041
19000-19500 71070 485 71555
19500-20000 34862 1 34863
20000-20500 16182 16 16198
20500-21000 18504 57 18562
21000-21500 10539 2 10541
21500-22000 8018 0 8018
22000-22500 4516 0 4516
22500-23000 1192 0 1192
23000-23500 1478 0 1478
23500-24000 3007 0 3007
24000-24500 1071 0 1071
Totals 698755 92309 791064
16 January 2017 Report No. 1546223-008-R-Rev2 3
4.0 ACID SULFATE SOILS (ASS)
Our previous report indicated the following with regards to ASS materials that may be encountered in the
capital dredging:
The soft clays have potential acidity (chromium reducible sulfur) levels which would classify them as
PASS. The total volume of these materials has been re-calculated as 698,755 m3.
Most of the PASS materials have sufficient neutralising capacity to classify them as self-neutralising
PASS (SNP). The volume of these SNP materials has been re-calculated as 450,863 m3.
The locations where PASS materials (without sufficient neutralising capacity) have been identified are
summarised below. The volume of these materials has been re-calculated as 247,892 m3 made up as
follows:
Main Swing Basin – 42,914 m3
Crystal Swing Basin – 8,456 m3
CH14750-CH15250 - 31,136 m3
CH15250-CH16250 - 91,611 m3
CH17500-CH18000 - 73,775 m3
PASS was also detected at isolated investigation locations beyond CH19250 but at depths of 2m to 3m
below the base of the channel. These results have not been considered further as these materials will not
be disturbed by the proposed capital dredging. The stiff clays have been confirmed as non-ASS.
5.0 STIFF CLAYS
As indicated in Figures F001 to F002 and in Table 2, the locations where more significant volumes of stiff
clays are likely to be encountered in the capital dredging are summarised below:
CH14000-CH14500 – 9,541 m3
CH14500-CH15000 – 30,687 m3
CH15500-CH16000 – 15,965 m3
CH17000-CH17500 – 6,213 m3
CH17500-CH18000 – 12,499 m3
The volume of stiff clays encountered during capital dredging in the outer channel beyond CH18500 is likely
to be ~600m3.
6.0 SANDS
As outlined in our previous report, sands were encountered at a number of inner harbour investigation
locations (i.e. G1, G3, G4, G5 and G21), plus at CH 17500 (i.e. G10). The depth of the sands ranged from
about 0.2 to 0.75 m, however the extent of the sands has not been assessed. It is noted that shell contents
within the sands were inferred to range from about 20 to 40 % of the total mass based on visual
observations.
16 January 2017 Report No. 1546223-008-R-Rev2 4
7.0 IMPORTANT INFORMATION
Your attention is drawn to the document – “Important information relating to this report” which is included as
an Appendix to this report. The statements presented in this document are intended to advise you of what
your realistic expectations of this report should be. The document is not intended to reduce the level of
responsibility accepted by Golder Associates, but rather to ensure that all parties who may rely on this report
are aware of the responsibilities each assumes in so doing. We would be pleased to answer any questions
about this important information from the reader of this report.
GOLDER ASSOCIATES PTY LTD
Malcolm Cook
Principal Geotechnical Engineer
MSC/PKS/ow
A.B.N. 64 006 107 857
Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation.
J:\Geo\2015\1546223 - FCG - EIS Stage 1 - Port Development\CORR OUT\Stage 1B Marine\1546223-008-R-Rev2-Additional Studies
Dredged Materials.docx
16 January 2017 Report No. 1546223-008-R-Rev2
FIGURES
8 129 000 N
8 129 000 N371 000 E
371 000 E
8 130 000 N
8 130 000 N
8 128 000 N
8 128 000 N
8 127 000 N
8 127 000 N
370 000 E
370 000 E
1'
1
2'
2
3'
3
4'
4
5'5
6'6
7'7
8'8
9'9
10'10
11'11
12'12
13'13
14'14
15'15
A140
C146
D147
D149
F150
H160
F156
G155
H162
H165
H167
I162
I172
J164K167
M180
P180
U187
CA
CB
Bore 1
Bore 2Bore 3
BH1-2016
G1
G2
G3
G4
G5
BH1 - GHDBH2 - GHD
BH1-2013
BH2-2013
BH3-2013
PN-TP1
WDA 1
WDA 25
WDA 26
WDA 27
WDA 28 WDA 29
WDA 30
U185
CPT2-GHDCPT1-GHD
10800.00 m
11000.00 m
11250.00 m
11500.00 m
11750.00 m
1200
0.00
m
1225
0.00
m
1250
0.00
m
1275
0.00
m
1300
0.00
m
1325
0.00
m
1350
0.00
m
1375
0.00
m
1400
0.00
m
1425
0.00
m
1450
0.00
m
1475
0.00
m
8 132 000 N
8 132 000 N372 000 E
372 000 E8 133 000 N
8 133 000 N
8 131 000 N
8 131 000 N
8 130 000 N
8 130 000 N
371 000 E
371 000 E
373 000 E
15'
15
16'16
17'17
18'18
19'19
20'20
21'21
22'22
23'23
24'24
25'25
26'26
27'27
28'28
29'29
30'30A127
A138A140
B104B108B130
C119C121 C99 C94
CC
CD
BH1-2016BH2-2016 BH3-2016 BH5-2016
G6
G7G8
G9
G10
G11
G21G22
BH4-2013
BH5-2013
PN-TP2PN-TP3
WDA 1
WDA 15 WDA 16
WDA 19
WDA 2WDA 23
WDA 24
WDA 25
14500.00 m 1475
0.00
m
1500
0.00
m
1525
0.00
m
1550
0.00
m
1575
0.00
m
1600
0.00
m
1625
0.00
m
1650
0.00
m
1675
0.00
m
1700
0.00
m
1725
0.00
m
1750
0.00
m
1775
0.00
m
1800
0.00
m
1825
0.00
m
BORE HOLE DOUGLAS PARTNERS (PREVIOUS INVESTIGATION)
BORE HOLE WDA (PREVIOUS INVESTIGATION)
LEGEND
BORE HOLE GOLDER ASSOCIATES (CURRENT INVESTIGATION)
GRAB SAMPLE GOLDER ASSOCIATES (CURRENT INVESTIGATION)
BORE HOLE GOLDER ASSOCIATES (PREVIOUS INVESTIGATION)
BORE HOLE GHD (PREVIOUS INVESTIGATION)
BORE HOLE CH (PREVIOUS INVESTIGATION)
BORE HOLE BMT-WBM (PREVIOUS INVESTIGATION)
CPT GHD (PREVIOUS INVESTIGATION)
SOFT CLAY (CAPITAL DREDGING)
STIFF CLAY (CAPITAL DREDGING)
025
mm
1546223DOCUMENT No008
FIGURE
F0012
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
INVESTIGATION LOCATION PLAN - SHEET 1 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:10,000
5000
METRES
250
MGA94 Z55
MGA94 Z55
8 135 000 N
8 135 000 N374 000 E
374 000 E
8 136 000 N
8 136 000 N
8 134 000 N
8 134 000 N
8 133 000 N
373 000 E
373 000 E372 000 E
30'30
31'31
32'32
33'33
34'34
35'35
36'36
37'37
38'38
39'39
40'40
41'41
42'42
43'43
44'44
B54B63B74B79
C53 C50C82 C72C94 CECF
CG
BH7-2016 BH8-2016
G12
G13
G14 G15 G16 G17 G18
G22 BH6-2013PN-TP4
WDA 10
WDA 11
WDA 12
WDA 13
WDA 14
WDA 17
WDA 18WDA 7
WDA 8
1825
0.00
m
1850
0.00
m
1875
0.00
m
1900
0.00
m
1925
0.00
m
1950
0.00
m
1975
0.00
m
2000
0.00
m
2025
0.00
m
2050
0.00
m
2075
0.00
m
2100
0.00
m
2125
0.00
m
2150
0.00
m
2175
0.00
m
2200
0.00
m
N 8 139 000
N 8 139 000E 376 000
E 376 000
N 8 140 000
N 8 138 000
N 8 138 000
N 8 137 000
N 8 137 000E 375 000
E 375 000
E 374 000
E 374 000
45'45
46'46
47'47
48'48
49'49
50'50
51'51
52'52
53'53
54'54
B2B25B41 B7B9
C22C29C30CH
CI
G19G20
BH7-2013
PN-TP5 WDA 20
WDA 21
WDA 22
WDA 3
WDA 4
WDA 5
WDA 6
WDA 7
WDA 8
WDA 92200
0.00
m
2225
0.00
m
2250
0.00
m
2275
0.00
m
2300
0.00
m
2325
0.00
m
2350
0.00
m
2375
0.00
m
2400
0.00
m
2425
0.00
m
2450
0.00
m
2475
0.00
m
2500
0.00
m
2525
0.00
m
2550
0.00
m
2575
0.00
m
BORE HOLE DOUGLAS PARTNERS (PREVIOUS INVESTIGATION)
BORE HOLE WDA (PREVIOUS INVESTIGATION)
LEGEND
BORE HOLE GOLDER ASSOCIATES (CURRENT INVESTIGATION)
GRAB SAMPLE GOLDER ASSOCIATES (CURRENT INVESTIGATION)
BORE HOLE GOLDER ASSOCIATES (PREVIOUS INVESTIGATION)
BORE HOLE GHD (PREVIOUS INVESTIGATION)
BORE HOLE CH (PREVIOUS INVESTIGATION)
BORE HOLE BMT-WBM (PREVIOUS INVESTIGATION)
CPT GHD (PREVIOUS INVESTIGATION)
SOFT CLAY (CAPITAL DREDGING)
STIFF CLAY (CAPITAL DREDGING)
025
mm
1546223DOCUMENT No008
FIGURE
F0022
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
INVESTIGATION LOCATION PLAN - SHEET 2 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:10,000
5000
METRES
250
MGA94 Z55
MGA94 Z55
ELEV
ATIO
N (m
)
CH 11750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 11500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 11250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 11000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 100 1500-50-100-150
0.0 50.0 100.0 150.00.0-50.0-100.0-150.0
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0032
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 1 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
ELEV
ATIO
N (m
)
CH 12750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 100 150 2000-50-100-150-200
0.0 50.0 100.0 150.0 200.00.0-50.0-100.0-150.0-200.0
ELEV
ATIO
N (m
)
CH 12500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150-200
0.0 50.0 100.00.0-50.0-100.0-150.0-200.0
ELEV
ATIO
N (m
)
CH 12250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 12000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0042
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 2 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
ELEV
ATIO
N (m
)
CH 14250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 14000.0
-20
-15
-10
-5
0
5
10
-20
-15
-10
-5
0
5
100 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 13750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 13500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 13250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 13000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0052
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 3 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
ELEV
ATIO
N (m
)
CH 15250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 15000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 14750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 14500.0
-20
-15
-10
-5
0
5
10
-20
-15
-10
-5
0
5
100 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
30.00 m
30.00 m
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0062
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 4 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
ELEV
ATIO
N (m
)
CH 16750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 16500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 16250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 16000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 15750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
ELEV
ATIO
N (m
)
CH 15500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100-150
0.0 50.0 100.00.0-50.0-100.0-150.0
55.10 m 34.00 m
50.00 m 38.00 m
45.00 m45.00 m
30.00 m62.18 m
32.00 m65.21 m
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0072
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 5 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
ELEV
ATIO
N (m
)
CH 18250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 18000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 17750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 17500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 17250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 17000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0082
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 6 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
ELEV
ATIO
N (m
)
CH 19750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 19500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 19250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 19000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 18750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 18500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 500-50-100
0.0 50.00.0-50.0-100.0
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0092
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 7 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
ELEV
ATIO
N (m
)
CH 21250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 21000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 20750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 20500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 20250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 20000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0102
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 8 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
ELEV
ATIO
N (m
)
CH 22750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 22500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 22250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 22000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 21750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 21500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0112
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 9 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
ELEV
ATIO
N (m
)
CH 24200.8
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 24000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 23750.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 23500.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 23250.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
ELEV
ATIO
N (m
)
CH 23000.0
-25
-20
-15
-10
-5
0
5
-25
-20
-15
-10
-5
0
50 50 1000-50-100
0.0 50.0 100.00.0-50.0-100.0
2016 COMPOSITE POST DREDGE DATA POINTS 21-10-16
LEGEND
PROPOSED DREDGE SPOIL (SOFT) (MAINTENANCE & CAPITAL)
SOFT CLAY
STIFF CLAY
PROPOSED CHANNEL DESIGN
EXISTING CHANNEL DESIGN
PROPOSED DREDGE SPOIL (STIFF) (MAINTENANCE & CAPITAL)
025
mm
1546223DOCUMENT No008
FIGURE
F0122
2016-08-25
GPG
PB
MC
MC
CAIRNS SHIPPING DEVELOPMENT PROJECTFLANAGAN CONSULTING GROUP
CHANNEL CROSS SECTIONS SHEET 10 TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
DESIGNED
PREPARED
REVIEWED
APPROVED
YYYY-MM-DD
Path
: \\g
olde
r.gds
\gap
\Bris
bane
\Geo
mat
ics\
FLAN
AGAN
CO
NSU
LTIN
G G
RO
UP\
CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\99
_PR
OJE
CTS
\154
6223
_CAI
RN
S_PO
RT_
DEV
ELO
PMEN
T_N
OR
THER
N_S
AND
S\02
_PR
OD
UC
TIO
N\D
WG
\ |
File
Nam
e: 1
5462
23-0
06-R
-F00
1.dw
g
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: I
SO A
3
1:2,000
1000
METRES
50
VERT.
HORIZ.
0
1:400
10 20
METRES
16 January 2017 Report No. 1546223-008-R-Rev2
APPENDIX A Important information relating to this report
IMPORTANT INFORMATION RELATING TO THIS REPORT
The document (“Report”) to which this page is attached and which this page forms a part of, has been issued by Golder Associates Pty Ltd (“Golder”) subject to the important limitations and other qualifications set out below.
This Report constitutes or is part of services (“Services”) provided by Golder to its client (“Client”) under and subject to a contract between Golder and its Client (“Contract”). The contents of this page are not intended to and do not alter Golder’s obligations (including any limits on those obligations) to its Client under the Contract.
This Report is provided for use solely by Golder’s Client and persons acting on the Client’s behalf, such as its professional advisers. Golder is responsible only to its Client for this Report. Golder has no responsibility to any other person who relies or makes decisions based upon this Report or who makes any other use of this Report. Golder accepts no responsibility for any loss or damage suffered by any person other than its Client as a result of any reliance upon any part of this Report, decisions made based upon this Report or any other use of it.
This Report has been prepared in the context of the circumstances and purposes referred to in, or derived from, the Contract and Golder accepts no responsibility for use of the Report, in whole or in part, in any other context or circumstance or for any other purpose.
The scope of Golder’s Services and the period of time they relate to are determined by the Contract and are subject to restrictions and limitations set out in the Contract. If a service or other work is not expressly referred to in this Report, do not assume that it has been provided or performed. If a matter is not addressed in this Report, do not assume that any determination has been made by Golder in regards to it.
At any location relevant to the Services conditions may exist which were not detected by Golder, in particular due to the specific scope of the investigation Golder has been engaged to undertake. Conditions can only be verified at the exact location of any tests undertaken. Variations in conditions may occur between tested locations and there may be conditions which have not been revealed by the investigation and which have not therefore been taken into account in this Report.
Golder accepts no responsibility for and makes no representation as to the accuracy or completeness of the information provided to it by or on behalf of the Client or sourced from any third party. Golder has assumed that such information is correct unless otherwise stated and no responsibility is accepted by Golder for incomplete or inaccurate data supplied by its Client or any other person for whom Golder is not responsible. Golder has not taken account of matters that may have existed when the Report was prepared but which were only later disclosed to Golder.
Having regard to the matters referred to in the previous paragraphs on this page in particular, carrying out the Services has allowed Golder to form no more than an opinion as to the actual conditions at any relevant location. That opinion is necessarily constrained by the extent of the information collected by Golder or otherwise made available to Golder. Further, the passage of time may affect the accuracy, applicability or usefulness of the opinions, assessments or other information in this Report. This Report is based upon the information and other circumstances that existed and were known to Golder when the Services were performed and this Report was prepared. Golder has not considered the effect of any possible future developments including physical changes to any relevant location or changes to any laws or regulations relevant to such location.
Where permitted by the Contract, Golder may have retained subconsultants affiliated with Golder to provide some or all of the Services. However, it is Golder which remains solely responsible for the Services and there is no legal recourse against any of Golder’s affiliated companies or the employees, officers or directors of any of them.
By date, or revision, the Report supersedes any prior report or other document issued by Golder dealing with any matter that is addressed in the Report.
Any uncertainty as to the extent to which this Report can be used or relied upon in any respect should be referred to Golder for clarification.
GAP Form No. LEG04 RL2 July 2015 1/1