John James Audubon BridgeJohn James Audubon BridgeCable-Stayed Main SpanOver the Mississippi River
Johns Hopkins University
Whiting School of Engineering
September 10, 2008
![Page 2: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/2.jpg)
The ProjectThe Project
![Page 3: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/3.jpg)
Overall Project FactsOverall Project FactsScheduled Time to Complete
47 Months(February 2010)
Estimated Numberof Man-Hours 793,000 MH
Number of Bridges 8
Concrete 99,000 CY
Reinforcing Steel 27,900,000 LBS
Structural Steel 14,500,000 LBS
Stay Cables 1,834,000 LBS
Asphalt 95,000 TON
![Page 4: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/4.jpg)
Design/Bid/BuildDesign/Bid/Build
Owner
Design TeamCEI or
ConstructionManager
ConstructionContractor
![Page 5: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/5.jpg)
Design/BuildDesign/BuildOwner
Program Manager (Optional)
Design/Builder(Often a General Contractor)
Construction Team QualityControl Designer
![Page 6: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/6.jpg)
The Joint VentureThe Joint Venture
• Flatiron Constructors (Longmont, CO)• Granite Construction Company (Watsonville, CA) • Parsons Transportation Group, Inc. (Washington, DC)
The $348 million dollar project is being constructed by Audubon Bridge Constructors, a joint venture consisting of:
![Page 7: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/7.jpg)
Louisiana Department of Louisiana Department of Transportation & DevelopmentTransportation & Development
• LA DOTD is the owner of this bridge and are managing the construction with the Louisiana TIMED Program.
![Page 8: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/8.jpg)
CableCable--Stayed BridgeStayed Bridge
Bridge 3
![Page 9: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/9.jpg)
General ArrangementGeneral Arrangement
• 1583 ft main span• 1463 ft navigational clearance provided
![Page 10: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/10.jpg)
Towers:• 500’ high
•136 cable stays
•Two crossbeams
•Tower top is Elev. 520
•Deck is Elev.130
![Page 11: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/11.jpg)
Key Design FeaturesKey Design Features• Light superstructure supported by 136 stay cables• Minimum loads on foundations• Durability
– Beneficial deck compression from stay cables and deck post-tensioning
– 2 “ LTM overlay– 8000psi HPC precast deck panels– 50ksi weathering steel protected by deck
![Page 12: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/12.jpg)
Main SpanMain Span
![Page 13: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/13.jpg)
Dead Load AnalysisDead Load Analysis
• Dead load analysis is non-linear– Non-linear cable elements– Non-linear beam elements– Non-linear soil springs
• Structure is “tuned” for dead loads– Towers built tall to compensate for shortening– Deck built long to compensate for shortening– Cables installed short to compensate for
stretch
![Page 14: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/14.jpg)
UntunedUntuned StructureStructure
![Page 15: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/15.jpg)
Tuned StructureTuned Structure
![Page 16: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/16.jpg)
StageStage--byby--Stage AnalysisStage Analysis
• Structure built one segment at a time• Precisely captures locked-in effects• Models time-dependent effects during
construction• Required for tracking bridge geometry during
construction• Performed prior to bridge construction
![Page 17: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/17.jpg)
Wind LoadsWind Loads
• AASHTO static wind load pressures not appropriate for long-span structures
• Three components to wind loads– Mean static– Background– Dynamic (Buffeting)– Dynamic component obtained from buffeting analysis
provided by wind specialists
![Page 18: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/18.jpg)
Sectional Model TestsSectional Model Tests
![Page 19: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/19.jpg)
Sectional Model in Wind TunnelSectional Model in Wind Tunnel
![Page 20: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/20.jpg)
BuffetingBuffeting• Dynamic response of structure from uneven
loading due to turbulence in natural wind• Buffeting induces vibration in the bridge’s natural
modes of vibration• The resulting forces which included dynamic
inertial forces can exceed those calculated using simple static wind pressures
![Page 21: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/21.jpg)
Buffeting AnalysisBuffeting Analysis
• Determine peak resonant response for each mode of vibration
• Input includes– Aerodynamic force coefficients– Structure dynamic properties (i.e. stiffness, mass,
natural modes of vibration)– Structure damping– Wind turbulence properties
![Page 22: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/22.jpg)
Buffeting AnalysisBuffeting Analysis
• Alternative to aeroelastic testing• Obtain results faster• Verify by measured response at limited positions
during aeroelastic testing• Requires modal superposition to determine peak
response
![Page 23: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/23.jpg)
Buffeting DemandsBuffeting Demands
![Page 24: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/24.jpg)
Buffeting DemandsBuffeting Demands
![Page 25: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/25.jpg)
Wind Load CombinationsWind Load Combinations
CaseTransverse
WindLongitudinal
Wind
1 100% 50%
2 50% 100%
3 70% 70%
Wind Load = Static + Background + Buffeting
![Page 26: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/26.jpg)
Aeroelastic Model in Wind TunnelAeroelastic Model in Wind Tunnel
![Page 27: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/27.jpg)
Aeroelastic Model DetailsAeroelastic Model Details
![Page 28: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/28.jpg)
Construction Stage ModelingConstruction Stage Modeling
![Page 29: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/29.jpg)
Construction Stage ModelingConstruction Stage Modeling
![Page 30: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/30.jpg)
Live Load AnalysisLive Load Analysis
• HL-93 Live Load per AASHTO LRFD:– Truck Load (HS-20, 72 kips)– Tandem Load (50 kips)– Lane Load (640 plf)
• Four design lanes• Demands obtained through influence surface
loading
![Page 31: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/31.jpg)
Live Load AnalysisLive Load AnalysisTower Foundation, Tower Foundation, MMlonglong
![Page 32: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/32.jpg)
Live Load AnalysisLive Load AnalysisEdge Girder, Edge Girder, MMlonglong
![Page 33: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/33.jpg)
Cable Loss AnalysisCable Loss Analysis
• Extreme limit state• Cable loss in accordance with PTI
Recommendations• 1.1DC+1.35 DW+0.75LLI+1.1Cable Loss
![Page 34: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/34.jpg)
Cable Loss Design PhilosophyCable Loss Design Philosophy
• Structural Elements Design to prevent structural instability– Prevention of progressive collapse– Member yielding and load redistribution permitted– Fully plastic behavior permitted– Brittle failure mechanisms prohibited
![Page 35: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/35.jpg)
Cable ReplacementCable Replacement
• Strength limit state• In accordance with PTI Recommendations• 1.2DC+1.4 DW+1.5LLI+Cable Exchange• Adjust traffic pattern to control live load• Limit areas where cable replacement governs
![Page 36: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/36.jpg)
NonNon--Linear BehaviorLinear Behavior
• Flexible suspended structure (geometric)• Cable stiffness due to sag• Material properties at strength and extreme limit
states• Soil properties
![Page 37: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/37.jpg)
Geometric NonGeometric Non--LinearitiesLinearities
• Non-linear beam elements• 3-D beam elements with stability functions to
capture P-delta effects• Stability functions to account for stiffening and
softening of structure under axial load
![Page 38: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/38.jpg)
NonNon--Linear PerformanceLinear Performance
• Most significant non-linear performance is under dead load analysis
• Non-linear behavior due to superimposed loads are typically small
![Page 39: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/39.jpg)
NonNon--Linear AnalysisLinear Analysis
• Geometric– Dead load analysis– Live load analysis for verification only
• Geometric and Material– Wind load analysis for critical cases– Construction stage analysis for critical cases– Cable loss analysis
![Page 40: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/40.jpg)
Deck/Tower ArticulationDeck/Tower Articulation
• Longitudinal Fixity– Pier 1W & 2W – Fixed Bearing– Pier 1E – Lockup Device– Pier 2E – Sliding Bearing
• Advantages– Maintain flexibility for temperature movements– Spread longitudinal shear from wind to both towers
![Page 41: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/41.jpg)
Lock Up DevicesLock Up Devices
![Page 42: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/42.jpg)
![Page 43: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/43.jpg)
Tower Foundations 1W & 1ETower Foundations 1W & 1E• 160’ x 64’ x 15’ Cap• 7 by 3 pile group – 1 test pile• 8’-0” diameter shafts
![Page 44: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/44.jpg)
Tower ShaftsTower Shafts•96” dia permanent casing
•90” dia drilled shaft
•Pile tip Elev. -175 to -180
•Tip grouting
![Page 45: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/45.jpg)
![Page 46: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/46.jpg)
Tower Cross SectionTower Cross Section• Box sections for
simple jump forming• Cable anchorage on
inside tower wall
![Page 47: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/47.jpg)
Tower Cable AnchoragesTower Cable Anchorages• Steel anchorage
trays for upper stays
• Concrete corbels for lower steep cables
• Crossbeams connected clear of anchorage zone
![Page 48: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/48.jpg)
Composite Deck CrossComposite Deck Cross--SectionSection
• Economy, simplicity and constructability• Durability• Accessibility• Low maintenance
![Page 49: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/49.jpg)
Deck AnchorageDeck Anchorage
![Page 50: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/50.jpg)
Stay SystemStay System
• 7-Wire parallel strand• Monostrand Jacking• State-of-the-Art
Corrosion Protection– Galvanizing– Grease– Strand PE– Coextruded HDPE Pipe
• Vibration suppression
![Page 51: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/51.jpg)
CounterweightCounterweight
![Page 52: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/52.jpg)
Bridge ConstructionBridge Construction
![Page 53: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/53.jpg)
Bridge ConstructionBridge Construction
![Page 54: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/54.jpg)
Bridge ConstructionBridge Construction
![Page 55: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/55.jpg)
Bridge ConstructionBridge Construction
![Page 56: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/56.jpg)
Foundation ConstructionFoundation Construction
Installation of Drilled Shafts
![Page 57: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/57.jpg)
Drilled Shaft InstallationDrilled Shaft Installation
• Set shaft template• Drive permanent casing using vibro hammer• Excavation of permanent casing• Installation of temporary casing by oscillator• Excavation of temporary casing• Install reinforcing cage• Pour tremie concrete while removing temporary
casing
![Page 58: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/58.jpg)
Set Shaft TemplateSet Shaft TemplateSecondary Template
Upper Template
Lower Template
Spud Pile
![Page 59: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/59.jpg)
Drive Permanent CasingDrive Permanent Casing
APE 400B Vibratory Hammer
Paint markings at each foot verify depth of casing as it is being installed.River bottom EL approx.
-40’ East, 5’ West
![Page 60: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/60.jpg)
Drive Temporary CasingDrive Temporary Casing
Speed has been accelerated
An oscillator works like someone is opening and closing a jar (back and forth)
![Page 61: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/61.jpg)
Excavate Temporary Casing Excavate Temporary Casing
Bottom of Permanent Casing
90” Temporary Casing
Hammer Grabs
West - 175 East - 180
![Page 62: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/62.jpg)
![Page 63: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/63.jpg)
Install Reinforcing CageInstall Reinforcing Cage
![Page 64: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/64.jpg)
![Page 65: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/65.jpg)
Pour Pour TremieTremie ConcreteConcrete
![Page 66: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/66.jpg)
![Page 67: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/67.jpg)
BaseBaseGroutingGrouting
![Page 68: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/68.jpg)
Footing Cofferdam StructureFooting Cofferdam Structure
Piles and trestle are installed
![Page 69: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/69.jpg)
Install Soffit PanelsInstall Soffit Panels
![Page 70: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/70.jpg)
Install Bracing FrameInstall Bracing Frame
• Install first tier of brace frame
![Page 71: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/71.jpg)
Erect PreErect Pre--Cast WallCast Wall
• Install pre-cast walls• Connect to soffit
panels and first tier brace frame
![Page 72: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/72.jpg)
Install Jacking SystemInstall Jacking System
• Install jacking system with permanent hangers
• Lower structure to facilitate 2nd & 3rd tier bracing installation
![Page 73: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/73.jpg)
• Install 2nd and 3rd tier brace frame.
Install Additional Install Additional Brace FramesBrace Frames
![Page 74: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/74.jpg)
Install Follower Install Follower SheetingSheeting
• Install sheet pile
![Page 75: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/75.jpg)
Lower StructureLower Structure
• Lower structure to final elevation
• Lock off hangers
![Page 76: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/76.jpg)
Pour Concrete SealPour Concrete Seal
• Install 8 foot concrete seal
![Page 77: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/77.jpg)
Dewater StructureDewater Structure
• Install pump.• Remove water
![Page 78: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/78.jpg)
Remove Hangers and Cut CasingRemove Hangers and Cut Casing
• Remove hangers
• Cut casing
![Page 79: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/79.jpg)
Place Reinforced Pile CapPlace Reinforced Pile Cap
• Place reinforced pile cap concrete
![Page 80: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/80.jpg)
Place Pedestal ConcretePlace Pedestal Concrete• Place pedestal
reinforcing and concrete lift 1
• Restrut as required
![Page 81: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/81.jpg)
Place Pedestal Concrete Lift 2Place Pedestal Concrete Lift 2
• Place pedestal concrete lift 2
![Page 82: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/82.jpg)
Remove CofferdamRemove Cofferdam
• Remove sheeting
• Remove Bracing
• Patch blockouts
![Page 83: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/83.jpg)
![Page 84: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/84.jpg)
![Page 85: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/85.jpg)
![Page 86: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/86.jpg)
![Page 87: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/87.jpg)
![Page 88: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/88.jpg)
![Page 89: Cable-Stayed Main Span Over the Mississippi Riverce.jhu.edu/z-pages/seminars08-09/091008.pdf · Cable-Stayed Main Span Over the Mississippi River ... Live Load Analysis • HL-93](https://reader031.vdocuments.mx/reader031/viewer/2022022014/5b49c61e7f8b9ada3a8ba57f/html5/thumbnails/89.jpg)
http://flatironcorp.oxblue.com/jjab/