20 August 2015

PROPOSED

CABLE STACKINGFOR EXPRESSWAY PROJECTS

Page 2: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 2/43

2

CONTENTS

1. INTRODUCTION

2. UNDERGROUND INSTALLATION METHOD

3. CABLE STACKING

4. MAINTENANCE5. CONSTRUCTION

6. FUTURE SUBSTATION

. CURRENT CARRYING CAPACITY 

!. CABLE PULLING

". COST AND TIME

1#.INSTALLATION REFERENCES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 3: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 3/43

3

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 4: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 4/43

4

CORRIDOR ISSUES$ BASIS FORCABLE STACKING

•. LIMITED CORRIDOR SPACE A%AILABLE

•. LARGE NUMBER OF CIRCUITS TO DI%ERT &ROUTE WITHIN THE A%AILABLE CORRIDOR

•. MMUP AD%ISED THAT NO FURTHERLANDTAKE WILL BE APPRO%ED

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 5: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 5/43

5

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

CORRIDOR CONSTRAINS

RAS ABU ABOUD STREET

REQUIRED CORRIDOR = 13.5 m

AVAILABLE CORRIDOR = 2.7 m

 RA S A B U A B

 O U D 

 S T R E E T

 L =  2 25  m

 L =  21 0  m

L= 2900 m

L= 2850 m

A RING ROAD

B RING ROAD

        A         L         M         U         N         T        A         Z        A         H

         S         T         R         E         E         T

A L  M  A T  A R   S  T  R  E  E  T  

  S A  L  

 A   R  O A

  D

A     L      !      H      A     L     E      E      "       S     T      R     E      E      

T      

B # RING ROAD

REQUIRED CORRIDOR = 12.5 m

AVAILABLE CORRIDOR = 2.5 m

Page 6: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 6/43

6

 2.1 OPTIONS AT CONSTRAINT AREAS

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

CABLE TUNNEL $%& CUT ' COVER CABLE TUNNEL $%& TBM

CABLE STAC!ING

Page 7: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 7/43

7

2 UNDERGROUND INSTALLATION METHMETHOD CAUSE

1. DIRECT BURIED INADEQUATE UTILITY CORRIDOR AT FEW

 AREAS

2. CABLE STACKING • SIMPLE CONSTRUCTION

• LESS EPENSI!E

• NO RUNNING COST• MINIMUM MAINTENANCE REQUIRED

3. CABLE TUNNEL

" CUT AND CO!ER

• REQUIRED REGULAR MAINTENANCE

• REQUIRES ADDITIONAL LAND TAKE FOR

  UTILITY BUILDINGS AND !ENTILLATION S#AFTS

• EPENSI!E

4. CABLE TUNNEL

" TBM

• MOST EPENSI!E AMONG OPTIONS

• REQUIRED REGULAR MAINTENANCE

• REQUIRES ADDITIONAL LAND TAKE FOR

  UTILITY BUILDINGS AND !ENTILLATION S#AFTS

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 8: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 8/43

$

  3' CABLE STACKING

CABLE ARRANGEMENTS IN DUCT BA

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

315%

Page 9: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 9/43

&

  3.1' CABLE STACKING

PICAL DUCT ARRANGEMENT

SEPARATE UP%C DUCTS FOR E%ERY CABLSPACING BETWEEN DUCTS HA%E BEEN

DERI%ED UPON THE SIMULATION RESULT

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

315%

Page 10: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 10/43

1%

  3.2' SAFETY AND RELIABILITY DEDICATED ACCESSFOR E%ERY SYSTEM %OLTAGES

L% ACCESS CHAMBER

M% ACCESS CHAMBER

H% ACCESS CHAMBER

EH% ACCESS CHAMBER

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 11: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 11/43

11

  3.3' SAFETY AND RELIABILITY 

L% ACCESS CHAMBER( MAINTENANCE AND MATERIAL ACCESS

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 12: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 12/43

12

  3.3' SAFETY AND RELIABILITY 

L% CHAMBER

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

2.3'

Page 13: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 13/43

13

  3.4' SAFETY AND RELIABILITY 

M% ACCESS CHAMBER( MAINTENANCE AND MATERIAL ACCESS

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 14: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 14/43

14

  3.4' SAFETY AND RELIABILITY 

M% CHAMBER

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 15: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 15/43

15

  3.5' SAFETY AND RELIABILITY 

H% ACCESS CHAMBER ) UPPER CONFIGURATI

MAINTENANCE AND MATERIAL ACCESS

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 16: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 16/43

16

  3.5' SAFETY AND RELIABILITY 

EH% CHAMBER( UPPER CONFIGURATION

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 17: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 17/43

17

  3.6' SAFETY AND RELIABILITY 

H% ACCESS CHAMBER ) DOWN CONFIGURATI

MAINTENANCE AND MATERIAL ACCESS

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 18: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 18/43

1$

  3.6' SAFETY AND RELIABILITY 

EH% CHAMBER( DOWN CONFIGURATION

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 19: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 19/43

1&

  3.' SUSTAINABLE DESIGN

!# YEARS OF RESOLUTION

4# YEARS OF LIFE SPAN

FOR THE INSTALLED CABLES SPARE FOR 41 TO !# YEARS

ECO FRIENDLY 

REDUCED CARBON FOOTAGES( NO MEP E*UIPMENTSDIESEL GENERATOR+ MOTORS+..

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 20: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 20/43

2%

  3.' SUSTAINABLE DESIGN

CO FRIENDLY 

SOFT LANDSCAPING POSIBILITY ( TO REDUCE URBAN HEAT RADIATION( IMPRO%ED AIR *UALITY

AND LOWER GREENHOUSE EMISSION

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 21: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 21/43

21

  3.!' SAFETY AND RELIABILITY 

NO MECHANICAL E*UIPMENTS

 JUMBO JET FAN+ SMOKE EXTRACT FA

FIRE PUMP CHILLER DIESEL GENERATOR MOTOR

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

PROPOSED CABLE STACKING

Page 22: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 22/43

22

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

3.!' SUSTAINABLE DESIGN

SA%E EARTH ( ENERGY SA%INGS SA%E LIGHTING ENERGY  WATER ,-..+ FIRE WATER+ PIPING'

FUEL ,-..+ STANDBY DIESEL GENERAT KEEP THE EN%IRONMENT COOL ,HEAT

FANS' POWER CONSUMPTION

PROPOSED CABLE STACKING

Page 23: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 23/43

23

  3."' SAFETY AND RELIABILITY 

/ARDOUS

IN CASE OF FIRE IN A DUCT+ THERE WIL

BE NO CHANCE TO SPREAD OR DAMAGETHE OTHER CABLES

CONCRETE ENCASEMENT EFFECTI%ELY

PROTECTS THE CABLE DURING THEGROUND MO%EMENT

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

PROPOSED CABLE STACKING

Page 24: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 24/43

24

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

4' MAINTENANCE

INTAINABILITY 

LIGHT MAINTENANCE FOR CHAMBERS

NO MAINTENANCE FOR DUCT BANKS

  PERIODIC MAINTENANCE

SA%E RE*ULAR & ANNUAL MAINT. CONTRA

TURE CABLE INSTALLATION

NO EXCA%ATION IS RE*UIRED

PROPOSED CABLE STACKING

Page 25: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 25/43

25

  5' CONSTRUCTION CONSTRUCTABILITY 

NO SPECIALI/ED CONTRACTOR FOR

CI%IL WORKS CONSTRUCTION

NO MOBILI/ATION PERIOD,APPROX. 12 MONTHS' FOR SPECI

MACHINERY IS RE*UIRED

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

PROPOSED CABLE STACKING

Page 26: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 26/43

26

  6' FUTURE SUBSTATION

DIRECTLY BURIED CABLING POSSIBI

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

FUTURE

SUBSTATION

FUTURE

SUBSTATION

PROPOSED CABLE STACKING

Page 27: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 27/43

27

  6' FUTURE SUBSTATION

ROAD CROSSINGS AND FUTURE POSSIB

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

PROPOSED CABLE STACKING

Page 28: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 28/43

2$

  6' FUTURE SUBSTATION

TURE M% CONNECTION FROM EXISTING

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

PROPOSED CABLE STACKING

Page 29: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 29/43

2&

  6' FUTURE SUBSTATION

DIRECTLY BURIED CABLING POSSIBI

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

PROPOSED CABLE STACKING

Page 30: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 30/43

3%

' AMPACITY CALCULATIONS

RESULTS OF CALCULATIONFROM AN APPRO%EDKAHRAMAA CONTRACTOR

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

CABLE DETAILS AM(ACIT) REQUIRED AM(ACIT) O**ERED

22% K! 25%% SQ.MM 515 M!A 531 M!A

22% K! 16%% SQ.MM 315 M!A 315 M!A

66 K! 4%% SQ.MM 4% M!A 4% M!A

11 K! 24% SQ.MM 6.5 M!A 6.5 M!A

MA+IMUM CONDUCTOR TEM(ERATURE 8,.7, C0  

HEN - CIRCUITS O(ERATING AT 100 LOAD/ OUTSIDE TEM(. AT SHA*T IS 58 C0

PROPOSED CABLE STACKING

Page 31: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 31/43

31

  !' CABLE PULLING CALCULATION

RESULTS OF CALCULATION FROM ANAPPRO%ED KAHRAMAA CONTRACTOR

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

LENGTH O* ,50 M

PROPOSED CABLE STACKING

Page 32: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 32/43

32

  "' COST AND TIME

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

T)(E INITIAL COST CONST. TIME LCC

CABLE STACKING

37%(%%%(%%%.%% QR

" T#REE #UNDRED

 AND SE!ENTY

MILLION

24 MONT#S

NO RUNNING

COST

CABLE TUNNEL

" CUT AND CO!ER

74%(%%%(%%%.%% QR

" SE!EN #UNDRED

 AND FORTY

MILLION

36 MONT#S

RUNNING

COST TO BE

 ADDED

CABLE TUNNEL

" TBM

1(2%%(%%%(%%%.%% QR

" 1.2 BILLION 4$ MONT#S

RUNNING

COST TO BE

 ADDED

TOTAL LENGTH = , !M

PROPOSED CABLE STACKING

Page 33: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 33/43

33

  1#' INSTALLATION REFERENCES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

!OREA

PROPOSED CABLE STACKING

Page 34: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 34/43

34

  1#' INSTALLATION REFERENCES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

!OREA

PROPOSED CABLE STACKING

Page 35: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 35/43

35

  1#' INSTALLATION SAMPLES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

E+AM(LE O* CABLE ARRANGEMENT IN EHV HV ACCESS CHAMBERS

PROPOSED CABLE STACKING

Page 36: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 36/43

36

  1#' INSTALLATION SAMPLES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

TRENCHING DUCTS

PROPOSED CABLE STACKING

Page 37: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 37/43

37

  1#' INSTALLATION SAMPLES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

(RECAST ACCESS CHAMBER

PROPOSED CABLE STACKING

Page 38: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 38/43

3$

  1#' INSTALLATION SAMPLES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

PROPOSED CABLE STACKING

Page 39: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 39/43

3&

  1#' INSTALLATION SAMPLES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

(RECAST DUCT BAN!

(RECAST ACCESS SHA*TS

PROPOSED CABLE STACKING

Page 40: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 40/43

4%

  1#' INSTALLATION SAMPLES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

DUCTILE IRON HEAV) DUT) COVER

AND *RAME ATER TIGHT

CONCRETE COVER SLAB

PROPOSED CABLE STACKING

Page 41: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 41/43

41

  1#' INSTALLATION REFERENCES

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

CABLE ENTRIES IN ACCESS CHAMBERS

PROPOSED CABLE STACKING

Page 42: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 42/43

42

PROPOSED CABLE STACKINGFOREXPRESSWAY PROGRAMME

Page 43: Cable Stacking Rev 02 20th August 2015

8/18/2019 Cable Stacking Rev 02 20th August 2015

http://slidepdf.com/reader/full/cable-stacking-rev-02-20th-august-2015 43/43