FHR
RETAIL ATRIUM
C2-1-04
STAIR-1
C2-1-17RISER
C2-1-18
RISER
C2-1-19
TENANTPANTRY/COPY
ZONE
244 m²
OFFICE 12
C2-1-40
247 m²
OFFICE 2
C2-1-30
148 m²
OFFICE 13
C2-1-41
401 m²
OFFICE 1
C4-1-29
MEP CABINET 1
C2-1-43
EXTERNAL TERRACE
C2-1-47
FHR
TENANT PANTRY/COPY ZONE
TENANT PANTRY/COPY ZONE
TENANT PANTRY/COPY ZONE
S.S.L. +9750
2021222324
L
M
P
N
LEGEND& ABBREVIATIONS
F D
M S D
ZCV
RELEVANT SERVICES REFERENCE DRAWING NO. REV.
REVISIONS
Notes:
CONSTRUCTION
DrawingTitle
Rev: Date:
Sheet
DrawingNo:
SubmittalNo: Scale
Project
DrawingStatus
KEY PLAN
Explanatory N ote Date Dra C hk App
DUBAI TRADE CENTER DISTRICT - PHASE 1A5
ENGINEERDOCUMENT REVIEW
Document reviewedforcompliance withthe designconcept andis notcheckedfor accuracy orsuitability of purpose. Thisreviewdoesnot relievethecontractorfrom his contractualobIigations, nordoes it authorisechangesinthe Contract Sum/ Period.
A
B
C
D
NO OBJECTION
NO OBJECTIONWITHCOMMENTS
RECEIVEDFOR INFORMATION
REJECTEDAND RESUBMIT
SUBMITTAL/ TRANSMITTALNO
REV:
DATE:
ENGINEER / HopkinsArchitects
Signed:
carillionP.O. Box1811. Dubai, UnitedArab Emirates,
Telephone +97143331200, Fax+9714 3331018
E-mail: [email protected]., www.afcarillion.ae.
WSPMiddleEast Ltd.P.O.Box. 7497Dubai, U.A.E
Tel: +971(4)286 1080Fax: +971(4)286 1090www.wspgroup.com
CE R T I F I CA T I O N
THE CONTRACTORCERTIF IES THAT THIS DRAWING HAS BEENCOORDINATED, CHECKEDFORCOMP LIANCE WITHTHE CONTRACT.
Hopkins ArchitectsDubai
Subcontractor:
Contractor:
Cost Consultant:
Consultant:
LeadConsultant:
Employer:
Mace InternationalLtd.P.O.Box. 26518, Dubai, U.A.E
Tel: +971(4)294 0085Fax: +971(4)294 0082
Email: [email protected]
HOPKINS Architects DubaiLtd.P.O.Box. 74534Dubai, U.A.E
Tel: +971(4)338 3992Fax: +971(4)338 7118
email: [email protected]
R EV IE WE D BY D IS CI PL IN E S TA TU S S IG NA TU RE D AT E
Architectural(HA)
DubaiMunicipality (AOR)
Structure(WSP)
Electrical(WSP)
Mechanical(WSP)
Plumbing(WSP)
Others
U
C1
ROAD312
SUB.
H1
C3
C5C4
C2
Rev.
N
1 . AL L D IM ENSIONS & BOTTOM OF PIPE (BOP) ARE IN M IL L IM ETERS.
.2. ALL P IPE WO RK PASSING T HRO UG H WALL SHALL BE PRO VIDED BY P IPE SLEEVE.
3 . FOR M ATERIAL DETAIL S, REFER TO M ATERIAL SUBM ITTAL .
4 . FOR PIPE SUPPORT DETAIL REFER.STANDARD DETAIL RW G.
5 . REFER SEPARATE DW G FOR FIRE BARRIER DETAIL S.
16/05/2016
C O M M E R C I A L & R E T A I L B U I L D I N G C 2 -
1 S T F L O O R H I G H L E V E L C O O R D I N A T E D S E R V I C E S L A Y O U T S H E E T 1
AFC-VO L-AC60 6-MEP-D RG-000 95 00
A0 1:50
ARCHITECTURAL SA08-C2-AR-0101-00 C0
STRUCTURAL SA09-C2-SC-0102-00 C0
C0
C0
00 I SSUED FOR APPR OV AL 16 /0 5/ 20 16 RZ SM SM
HVAC
CHILLEDWATER
FIRE FIGHTING
WATERSUPPLY
LIGHTING
CONTAINMENT
DRAINAGE
AFC-VOL-Ac606-MDW-DRG-00027
C0
C0
C0
C0
C0
AFC-VOL-Ac606-MCW-DRG-00028
AFC-VOL-Ac606-MDR-DRG-00036
AFC-VOL-Ac606-MAC-DRG-00031
AFC-VOL-Ac606-ELI-DRG-00026
AFC-VOL-Ac606-ESS-DRG-00025
F O R C O N T I N U A T I O N R E F E R D W G . N
O . :
A F C - V
O L - A
C 6 0 6 - M
E P - D
R G - 0
0 0 9 6
S H E E T - 0
2
S H E E T - 0
2
FO R CO N TI N U A TI O N R E FE R D W G . N O . : A FC- V O L - A C6 0 6 - ME P - D R G - 0 0 0 X X
S HE E T- 0 3
S HE E T- 0 1
S HE E T- 0 3
S HE E T- 0 1
S H E E T - 0
1
S H E E T - 0
1