c o l l e g e

12
C o l l e g e Daniel L. Salvey P o r t f o i o

Upload: keisha

Post on 11-Jan-2016

43 views

Category:

Documents


4 download

DESCRIPTION

Portf o io. C o l l e g e. Daniel L. Salvey. Baugh House Spring ’91, 2 nd Yr. Project. Project Parameters - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: C  o  l  l  e  g  e

C o l l e g eC o l l e g e

Daniel L. Salvey

Portfo io

Portfo io

Page 2: C  o  l  l  e  g  e

Baugh HouseSpring ’91, 2nd Yr. ProjectBaugh HouseSpring ’91, 2nd Yr. Project

Project Parameters• A project involving the research and emulation of a renown architect with

connections to the Bauhaus Architectural Movement. The project started by researching several renown architects from a given list as a small group. Then we chose one Architect that the group would emulate for our individual design exercises.

• We were to design a bird house as if we were that architect, using our knowledge of his or her partí, and drawing on the collective knowledge of the group for critiques of our designs throughout the process.

• Key Concepts: Detail, Context, Form, Emulation, Order, Usable• Architect of emulation: Mario Botta

5 WeeksConstruction Time: 5 Hrs

5 WeeksConstruction Time: 5 Hrs

Page 3: C  o  l  l  e  g  e

Campus InterventionFall ’92, 4th Yr. ProjectCampus InterventionFall ’92, 4th Yr. Project

Project Parameters• A Design Project involving the emotion or

spiritual aspects of design.• The intent of this project was to explore a

site on campus for it’s emotional properties and then create an intervention which would play on those properties in either an antagonistic or synergistic way.

• Presentation: (4) 16” x 16” boards, (1) site exploration and abstraction piece, (2) presentation drawings, (1) final site model

• Key Concepts: Imagery, Quality, Contemplative, Context, Experiential

5 WeeksDrawing & Construction: 20

Hrs

5 WeeksDrawing & Construction: 20

Hrs

Page 4: C  o  l  l  e  g  e

Toppenish HousingSpring ’93, 4th Yr. ProjectToppenish HousingSpring ’93, 4th Yr. Project

Project Parameters• An Urban Design project involving the

design of an urban housing project in Toppenish, Washington, focusing on real world issues involved in the development of multifamily ethnic housing for migrant and sedentary farm workers in an ethnically rich and diverse environment

• Key Concepts: Clusters & Courtyards, Ethnically Identifiable, Low Rise Medium Density, Seasonal, Climatic Conditions, Affordable

• Presentation included the design, layout, and production of three (3) hand drawn 18” x 24” boards to be presented in front of the class with a brief explanation of your work.

7 WeeksPresentation Time: 25 Hrs

7 WeeksPresentation Time: 25 Hrs

Page 5: C  o  l  l  e  g  e

Candle HolderPersonal Project, Fall ‘93Candle HolderPersonal Project, Fall ‘93

Project Parameters• An extra-curricular design exercise for a

home furnishing item I conceived in my spare time.

• Stainless steel and Machined Aluminum• Approx. Size: 3” x 3” x 4.8”• Key Concepts: Architectural, Form,

Simplicity, Functional, Beauty• Inspirations: Louis Kahn, Mario Botta

2 HoursConstruction Time: 2 Hrs

2 HoursConstruction Time: 2 Hrs

Page 6: C  o  l  l  e  g  e

Definition of ArchitectureFall ‘93, 5th Yr. ProjectDefinition of ArchitectureFall ‘93, 5th Yr. Project

Project Parameters• A project involving the design and

construction of an abstract model designed to meet our interpretation of the “Definition of Architecture”

• Intent of the project was both as an exercise of self exploration and as practice at various techniques in model building.

• Key Concepts: Abstract Art, Evolution, Expression, Protection, Maintainable, Part(s) of the Earth

5 WeeksConstruction Time: 5 Hrs

5 WeeksConstruction Time: 5 Hrs

Page 7: C  o  l  l  e  g  e

Ideal Building: ConceptualFall ’93, Fifth Yr. ProjectIdeal Building: ConceptualFall ’93, Fifth Yr. Project

Project Parameters• An exercise involving the design and

construction of an abstract model that meets the goals of the “ideal Building” situation as defined by the class in an informal discussion

• The intent of this project was as an exercise of self expression, model construction practice, and as a preliminary exercise for a following project

• Key Concepts: Rhythm, Transparency, Structural Expression, Green Space, Circulation, Open Space, MEP Concepts

2 WeeksConstruction Time: 20 Hrs

2 WeeksConstruction Time: 20 Hrs

Page 8: C  o  l  l  e  g  e

Project Parameters• The design of an Intermodal Transport

Facility housing one million square feet of multi-use space allotted primarily for research.

• Project was to incorporate surface parking for 1500 cars, two helipads and access to a subway 70’ below grade on a site with a 5% slope located near two intersecting freeways.

• Primary structure includes one million square feet of flex space with expansion potential of an additional one million square feet.

• Design genesis based on previous project, “Ideal Building: Conceptual.”

• Key Concepts: Form, Flexibility, Green space, Openness, Expandability, Natural Lighting

5 WeeksConstruction Time: 32 Hrs

5 WeeksConstruction Time: 32 Hrs

Intermodal Transport FacilityFall ’93, Fifth Yr. ProjectIntermodal Transport FacilityFall ’93, Fifth Yr. Project

Page 9: C  o  l  l  e  g  e

Project Parameters• This project involved the design and construction of a site model for the

Intermodal Transport Facility project as it would appear when fully expanded to two million square feet of occupiable space.

• Design genesis based on previous project, “Ideal Building: Conceptual.”• Key Concepts: Simplicity, Conceptual, Expansion Realized, Drainage,

Form, Landscape

2 WeeksConstruction Time: 8 Hrs

2 WeeksConstruction Time: 8 Hrs

Intermodal Transport Facility: Site ModelFall ’93, Fifth Yr. Project

Intermodal Transport Facility: Site ModelFall ’93, Fifth Yr. Project

Page 10: C  o  l  l  e  g  e

A Major League Ball Park for PortlandSpring ’94, 5th Yr. Thesis ProjectA Major League Ball Park for PortlandSpring ’94, 5th Yr. Thesis Project

Project Parameters• A forty two thousand seat state of the art

Major League Ball Park to be located in Portland Oregon. This facility houses a players club, sponsors lounge, multilevel public restaurant with sports bar, office spaces, and multi-level covered private parking for all franchise personnel. It also incorporates covered seating for over twenty thousand fans, a real grass playing surface, and state of the art athletic facilities for the players.

• Thesis presentation included approximately 3’x7’ of display boards and a 30 second animation

• Key Concepts: Form, Tradition, Structure, Context, Technology, Programming

7 Weeks7 Weeks

Frame clip from animation

Frame clip from animation

Page 11: C  o  l  l  e  g  e

A Major League Ball Park for PortlandSpring ’94, 5th Yr. Thesis ProjectA Major League Ball Park for PortlandSpring ’94, 5th Yr. Thesis Project

Page 12: C  o  l  l  e  g  e

Thank you for viewing my College Portfolio!Thank you for viewing my College Portfolio!

Have a great day!Have a great day!

[email protected] | m.503.970.7822

Please visit my website for more information