Presentation of BWE
Modern technologies in utilisation
of biomass in large power plants
Paolo Danesi - VP sales BWE A/S
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
STF Headquarter
and workshop
TOTAL AREA: 160,000 m2
MANUFACTURING AREA: 32,000 m2
Magenta - Milan
ITALY
ENERGY INDIA
Chennai
INDIA
Lyngby
DENMARK
BURMEISTER & WAIN ENERGY A/S
Company structure
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• Company founded in 1937
• Located in Magenta (Milano), Italy
• STF is an historical and leading name in Power field
• Supplier of large size equipment and complete units for
power plants
• 1997-98 - Design & supply of HP FWH (289 bar design pressure) for TorValdaliga Sud Steam Power Plant
• 1999 - 1st HRSG for Pietrafitta CCPP
• 2002 - Acquisition of BWE Burmeister & Wain Energy A/S
• 2008 - Contract for Porto Tolle (Italy) , 3 x 660 MW UltraSuperCritical Boiler
• 2009 - Establishment of BWE Energy India PVT Ltd
STF GROUP
Historic Overview
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• Company founded in 1843
• First steam boiler supplied in 1852
• First Benson once-through boiler in 1952
• World record - above 47% in efficiency for a coal
fired utility boiler in 1999
• Contract for Porto Tolle 3x660 MW USC
History of BWE
• Part of Lentjes Group in 1980
• Part of Deutsche Babcock in 1991
• Part of FLS Miljø in 1997
• Part of the Italian STF S.p.A. Group in 2002
• BWE India founded in 2009
Recent History
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
BWE Energy India
BWE Energy India started operating in October 2009
and covers the fast growing South Asian market.
The office is located in Chennai -
one of the largest engineering hubs in India.
BWE Energy India takes care of:
• Sales and operation of BWE and STF products
• Procurement and sourcing of materials and
engineering services within the area
Chennai
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
STF GROUP
Location of STF
STF Power Limited - UK
STF GmbH - Germany
STF Slovakia s.r.o.
STF Hungary kft.
BWE Energy India PVT LTD
STF Egypt Branch
STF S.p.A. - Italy
BWE A/S - Denmark
Branch
Local Company
Lead center
STF Enerji Lim. Sirkety (Turkey)
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
STF GROUP
Field of application
COAL GAS RENEWABLES NUCLEAR
HIGH EFFICIENCY ULTRA SUPERCRITICAL
COAL BOILER
HEAT RECOVERY STEAM GENERATOR
BIOMASS
HEAT TRANSFER PRODUCTS
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Heat Recovery Steam Generators
Heat Transfer Products
Industrial Boilers
Nuclear Division
Biomass Boilers
SC & USC Boilers
Air Preheaters & Gas Gas Heaters
STF GROUP
Products
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• Heat Recovery Steam Generators:
• Horizontal gas flow arrangement
• Natural & forced circulation
• Benson Once-through
• Industrial Boilers:
• Package type
• Steam drum type
• Heat Transfer Products:
• Water steam condensers
• Feed water heaters
• Heat exchangers
STF - Products
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• Advanced Ultra Super Critical steam boilers
• Grate fired biomass boilers
• Pulverized biomass fired boilers
• SCR – Selective Catalyst Reactors (deNOx)
• Low-NOx firing systems and circular burners
• Regenerative Air Heaters and Gas-Gas Heaters
• Critical piping
• Erection and commissioning
• Upgrading of existing boilers to improved
performance
• Boiler service
• Training
BWE – Products and services
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• Net efficiency above 47% on coal
• Fuel flexible - coal, HFO, NG, Orimulsion, peat and
wood dust
• Pressure ~ 280 to 320 bars
• Temperature ~ 580 to 620 °C
• Single or double reheat
• Excellent performance and reliability record
• Three USC units in operation until now:
NVV3 415 MWe (coal)
SVS3 415MWe (NG)
AVV2 415MWe (NG/HFO/wood dust)
Clean Coal Technology
Ultra Super Critical Boilers
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Vibrating grate boiler for straw and wood chips
50- 120 Mj/s
Biomass boiler – products overview
HP2
Screen
RH2
HP1.3 HP1.2
HP1.1
ECO2
ECO1
3 mills
OFA OFA
OFA
ESP
FD
APH
4 x 3
burners
deSOx
deNOx
RH1.2
RH1.1
PA
fans
Conversion to biomass for large
Fossil fuel power station
Multi fuel hybrid power station
15 - 400+ MWe , PF type boiler
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
BWE has been one of the pioneer in biomass combustion technologies due
to the demand of the Danish/Scandinavian market for such solution.
The drivers of the involvement of BWE in the biomass project are deriving
from different side all related to environmental concerns
Experience in biomass
Driver Technology Project
Availability of straw to
be disposed
Straw combustion Various
Ban of coal for large
combustion plant and
introduction of subsidy
for the use of biomass
Large biomass
combustion plant
(mainly pellet)
Avedore
Large availability of
wood
Conversion of fossil
fuel plant to biomass
combustion
Herning power plant
boiler conversion
Demand for fuel
flexibility (fossil and
biomass)
Co combustion Amager boiler
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Avedøre Power Station Unit 2
BWE Solutions for co-firing
Large hybrid fossil/biomass power station
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Avedøre II (2001)
Client: DONG Energy A/S (Denmark)
CHP - 485 MWe & 545 MJ/s heat (1067 t/h steam)
Tangential firing
USC Tower boiler
HP 305 bar & 582°C
Avedøre II (2001) / DONG Energy A/S
CHP / 485 MWe & 545 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• Multi-fuel unit:
• 800 MJ/s USC boiler supplied by BWE for gas, oil, coal or wood pellets (70%)
• 105 MJ/s straw-fired biomass boiler
• 2*50 MWe gas turbines
• Connected to the Copenhagen area district heating system
• 570 MWe for power
• 545 MJ/s & 485 MWe
Avedøre II (2001) / DONG Energy A/S
CHP / 485 MWe & 545 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Multi fuel concept
• Avedøre Power Station unit 2
design:
• 100% on coal
• 100% on natural gas
• 100% on heavy fuel oil (HFO)
• 70% on biomass (wood pellets)
• USC combined with
2 x 50MW gas turbine
Increased output 150MWe
Total plant efficiency 51%
HRSG FW-preheater
Bio
Boiler
(straw)
USC
boiler
(gas/oil/
wood)
Gas-turbine
Steam turbine
Plant concept by DONG Energy, visited by delegations during COP15
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• Originally commissioned on gas/oil in 2001
• Burners converted (2003):
• Gas/Oil => Gas/Oil/ Wood pellets
• The wood pellets are pulverized in traditional roller mills
• 3 of 4 burner levels (12 of 16 BWE burners) can burn 100% wood
(70% of heat input)
• The 4th level can only burn oil/gas
• The thermal input is up to 560 MJ/s on wood – equivalent to approx. 250 MWe resulting
from biomass
Avedøre II (2001) / DONG Energy A/S
CHP / 485 MWe & 545 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Avedøre II: Combustion system
Air staging:
• Burner PA (primary air)
• Burner SA (secondary air)
• Burner TA (tertiary air)
• OBA (over burner air)
• OFA (over fire air)
Wood pellets:
• Mill air/wood ratio: 2 kg/kg
• Mill inlet temperature: approx . 60oC
Avedøre II (2001) / DONG Energy A/S
CHP / 485 MWe & 545 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• 8 years of successful operation with biomass firing
• Consumption of wood pellets in 2010 was 620,000 tons/yr
• The corresponding CO2 reduction was about 1,000,000 tons per
year
Avedøre II (2001) / DONG Energy A/S
CHP / 485 MWe & 545 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Herning Power Station
BWE Solutions for co-firing
Repowering of an existing power station
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Herning Power Station (1982)
Client: DONG Energy A/S (Denmark)
CHP - 89 MWe & 174 MJ/s heat
425 t/h of steam (equivalent to
approx 125 MWe in case of full electricity
conversion)
Wall firing & bottom grate
Drum boiler – 115 bar & 525°C
Herning Power Station(1982) / DONG Energy A/S
CHP / 89 MWe & 174 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Herning Power station (1982) / DONG Energy A/S
CHP / 89 MWe & 174 MJ/s heat
1982 Coal/Oil 2002 Biomass/Gas/Oil
2009 Biomass
2000 Gas/Oil
4 x 2 coal/oil burners
The original boiler design
was operated for 20 years
4 x 2 gas/oil burners
The first retrofit included 8
new WR oil and gas
burners
3 x 2 gas/oil burners
The retrofit enables about
45% load on biomass
1 x 2 gas/oil burners
2 x 2 gas/oil/wood dust burners
1 x vibration grate for wood
chips
biomass load up to 90%
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• 7 years of successful operation with biomass firing
• In 2006 the consumption of wood chips was 206,000 tons
• This was equivalent to 70% of the total fuel consumption
• Now the capability is 100% of the fuel consumption
• The CO2 reduction will be >200,000 tons per year
• CO emission < 200 mg/Nm³ (dry, 6% H2O)
• NOx emission < 300 mg/Nm³ (dry, 6% H2O)
Herning Power Station (1982) / DONG Energy A/S
CHP / 89 MWe & 174 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
PF combustion system
Herning Power Station (1982) / DONG Energy A/S
CHP / 89 MWe & 174 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Amager Power Station Unit 1
BWE Solutions for co-firing
New build for multi-fuel
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
HP2
Screen
RH2
HP1.3 HP1.2
HP1.1
ECO2
ECO1
3 mills
OFA OFA
OFA
ESP
FD
APH
4 x 3
burners
deSOx
deNOx
RH1.2
RH1.1
PA
fans
Amager I (2009)
Client: Vattenfall A/S (Denmark)
CHP - 71 MWe & 250 MJ/s heat (500 t/h
steam ≈ equivalent to 150 MWe)
Front-wall fired
Fitted into existing building
HP part 185 bar & 540°C
PA
cooler
HP2
Screen
RH2
HP1.3 HP1.2
HP1.1
ECO2
ECO1
3 mills
OFA OFA
OFA
ESP
FD
APH
4 x 3
burners
deSOx
deNOx
RH1.2
RH1.1
PA
fans
Amager I (2009) / Vattenfall A/S
CHP / 71 MWe & 250 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Amager I (2009) / Vattenfall A/S
CHP / 71 MWe & 250 MJ/s heat
Boiler design:
• Increased pitch super heater banks
• Austenitic steel 1st pass
(due to straw pellets)
• ECO out of boiler envelope
Combustion system design:
• 100% on coal (350 MJ/s, two levels)
• 100% on heavy fuel oil (HFO)
• 100% on wood pellets
(350 MJ/s, three levels)
• 90% straw pellets
Reduced flue gas temperature by PA coolers
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• Only one fuel type per mill at any time; i.e. no co-milling
0
50
100
150
200
250
300
350
100% 100% 100% 91% 100% 100% 85% 100% 100%
Fuel input
Fu
el in
pu
t [M
J/s
]Coal Wood
Straw
20 m%
50 m%
40 m%
Co-firing
40 m%
Straw
Wood
Coal
Mass percentageCoal
AMV1 options:
Amager I (2009) / Vattenfall A/S
CHP / 71 MWe & 250 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• The plant was commissioned in 2009
• Projected consumption of wood pellets is 40,000 tons/yr
• Projected consumption of straw pellets is 110,000 tons/yr
• Biomass use is equivalent to 35% of expected thermal input
• The corresponding CO2 reduction is approx. 220,000 tons
Amager I (2009) / Vattenfall A/S
CHP / 71 MWe & 250 MJ/s heat
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Porto Tolle: Co-combustion
Coal fired USC 3 x 660 MW:
• Injection through centre tube in the PF burner
• 5% wood chips (33 MWe)
• 5% RDF (Refuse Derived Fuel from waste)
coal biomass/rdf
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• Grate firing is used in smaller boilers.
• The fuel preparation for grate firing is reduced compared
to burner firing, where the fuel is dried and pulverized.
• Fuel can be straw, wood chips combination of the two
fuels
Grate Fired Biomass Boilers
• Fuel input up to 150 MW
• Steam temperature up to 540 °C
• Steam pressure up to 120 Bar
• Natural circulated Drum
Boiler size & type:
Vibration Grate Firing:
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• 4½ - pass drum type boiler
• BWE straw firing system
• Fuel: straw from cereals
Boiler concept:
Plant concept:
• 50 MJ/s (heat input) straw fired steam boiler
Emlichheim
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
50 MJ/s straw; 18,55 kg/s steam; 122 Bar; 522 °C; 190 °C feedwater
5400
43200
30000
24300
Emlichheim
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A· DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
• 4½ - pass drum type boiler
• BWE straw firing system
• Fuel: straw from cereals
• Aux.: wood chips
Boiler Concept
102.3 MJ/s (heat input) straw fired steam boiler in UK
Sleaford plant concept
Group
Burmeister & Wain Energy A/S · Lundtoftegårdsvej 93A · DK-2800 Kgs. Lyngby · Denmark · Tel/fax +45 39 45 20 00/+45 39 45 20 05 · [email protected]
Your partner for
steam power -
Tak for opmærksomheden !!
BWE A/S - STF S.p.A group