![Page 1: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/1.jpg)
Bushwick Inlet ParkMotiva Parcelbounded by Franklin Street/ Kent Avenue, East River and Quay Street,in Bushwick Inlet Parkin the Borough of Brooklyn.
CB1 - Parks Committee Meeting, Schematic Design PresentationJune 03, 2020Abel Bainnson Butz, LLP
Total Budget: $9,818,000 Mayor, Bill de Blasio - $9.8 M FY19
Project Size: 1.90 ac
![Page 2: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/2.jpg)
Goals• Reconnect the community with the waterfront by providing a passive park that remediates environmental site conditions, restores native plant habitat and increases wildlife biodiversity.
• Coordinate design vocabulary with adjacent Bushwick Inlet Park parcels to create a cohesive plan which aligns with the vision of the 2009 Greenpoint Williamsburg Open Space Master Plan and allows for a connection to the future build out of Bushwick Inlet Park.
2Bushwick Inlet Park, Motiva Parcel | Project Goals
![Page 3: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/3.jpg)
Neighborhood Site
City NTS
NTS NTS
Brooklyn
ManhattanQueens
Site
East River
GreenpointEast
Village
Bushwick Inlet ParkMotiva Parcel
3Bushwick Inlet Park, Motiva Parcel | Project Location
N
![Page 4: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/4.jpg)
Site
EAST RIVER
NTS N
Land Use Categories
Commercial
Multi-Family Residential
Institutional
Mixed Use
Industrial
Transportation / Utilities
Open Space And Outdoor Recreation
Parking
Vacant Lots
1 And 2 Family Residential
Site Boundary
| Surrounding Land Use4
| Bushwick Inlet Park, Motiva Parcel
![Page 5: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/5.jpg)
NTS
N
McCarren ParkAthletic FieldsFitness EquipmentOutdoor PoolsSpray ShowersRecreation CentersPlaygroundTennis CourtsHandball Courts
North 5th Street Pier
Bushwick Inlet ParkPlaygroundsAthletic FieldsSpray Showers
American PlaygroundPlaygroundsBasketball CourtsHandball CourtsSpray Showers
Transmitter ParkPlaygroundSpray Showers
Project Site
East River
Msgr. McGolrick ParkSpray ShowersPlaygroundsDog-Friendly Areas
5 min (1/4 mile)
walk radius
10 m
in-(1/2
mile)
walk ra
dius
| Neighborhood Context5
| Bushwick Inlet Park, Motiva Parcel
![Page 6: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/6.jpg)
Project Site
6Bushwick Inlet Park, Motiva Parcel | Concept from 2009 Greenpoint Williamsburg Open Space Master Plan
NTS N
![Page 7: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/7.jpg)
LegendProject Limit
Existing Bicycle Circulation
Proposed Pathway
Future Bicycle Circulation
Future Phase
Future Pedestrian Connection
KEN
T
AVE
.
N. 14TH ST.
N. 15TH ST.
GEM ST.
WYT
HE
AVE.
N. 13TH ST.
N. 12TH ST.
N. 11TH ST.
N. 10TH ST.
N. 9TH ST.
FRANKLIN ST.
QUAY ST.
NTS
| Site Plan (Future Integration with Master Plan)
N
7 | Bushwick Inlet Park, Motiva Parcel
![Page 8: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/8.jpg)
| Existing Conditions
NTS
N
8 | Bushwick Inlet Park, Motiva Parcel
![Page 9: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/9.jpg)
1 2
1 - Looking north at Bushwick Inlet with MTA facility in background 2 - Bushwick Inlet
N
9Bushwick Inlet Park, Motiva Parcel | Site Photos
![Page 10: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/10.jpg)
1 - Bushwick Inlet from Franklin Street 2 - Looking north along Franklin Street
12
N
10Bushwick Inlet Park, Motiva Parcel | Site Photos
![Page 11: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/11.jpg)
1 - Panoramic View of Existing Conditions
N
1
11Bushwick Inlet Park, Motiva Parcel | Site Photos
![Page 12: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/12.jpg)
COMMUNITY VISIONING SESSION | JANUARY 24, 2019
WHAT WE HEARD:Canoeing/ Kayaking
PassiveRecreation
Educational/HistoricalElements
Other
Viewsheds
Storm Resiliency& SustainableMaterials
Pathways& Seating
Signage
Native Planting & Habitat
OtherSecurity Lighting
Physical Accessto the Water
- Movie/Game Night- Kiosks- Billion Oyster Project
- Boulders/Rocks- Zipline- Art/ Sculpture- Water Features
- Soft Edges
SITE PROGRAM SUMMARYPhysical Access to the Water Canoeing/ KayakingEducation/ Historical ElementsPassive RecreationOther
31%21%18%15%15%
SITE FEATURES SUMMARYPathways and Seating Native Planting & HabitatOtherSignageStorm Resiliency & Sustainable MaterialsViewshedsSecurity Lighting
29%21%16%13%10% 6% 5%
SITE PROGRAM
SITE FEATURES
12Bushwick Inlet Park, Motiva Parcel | Community Visioning Session
![Page 13: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/13.jpg)
40 QUAY ST.[MTA FACILITY]
BAYSIDE PARCEL
MONITOR MUSEUM PARCEL
BUSHWICK INLET
N 14TH ST.
N 15TH ST.
MESEROLE AVE.
LegendProject Limit
Mean High Water Line (+1.81’)
Mean Low Water Line (-2.42’)Designated Bike Lane
Vegetative Screeningrecommended
Vehicular TrafficChain Link Fence
Future Physical Connection to adjacent propertyFuture upland Connection & Visual Corridor per Zoning
Deteriorated FormerWood Bulkhead
Timber Piles
Potential Park Entry(Identified in MasterPlan)*Views to
Manhattan
Revetment Stone, Typ.(unless otherwise Indicated)
*
Slight Slope (0-5% Slope)
Moderate Slope (6-10% Slope)
Severe Slopes (11%+ Slope)
Approximate Extent of WaterFRAN
KLIN
ST.
/ KE
NT A
VE.
| Site Analysis
N
NTS
13 | Bushwick Inlet Park, Motiva Parcel
![Page 14: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/14.jpg)
N 14TH ST.
Legend
Native, Non-Invasive10% of Total Trees
Ailanthus altissima Tree of Heaven (57.0%)Corylus colurna Turkish Hazelnut (1%)Elaeagnus umbellata Japanese Silverberry (1%)Morus alba White Mulberry (9.0%)Paulownia tomentosa Royal Empress Tree (4%)Ulmus pumila Siberian Elm (1%)
Notes:1. Trees 4”+ caliper inventoried by NYC Parks.2. Canopy size indicated calculated from DBH.3. Percentages rounded to the nearest %.4. All trees to be removed due to soil contamination & environmental soil cap requirements except street trees which are to remain.
Prunus sp. Unknown Cherry (9%)Pyrus calleryana Callery Pear (1%)Zelkova serrata Japanese Zelkova (7%)
Chamaecyparis thyoides Atlantic White Cedar (1.0%)Populus deltoides Eastern Cottonwood (1.0%)Prunus serotina Black Cherry (4.0%)Quercus palustris Pin Oak (4.0%)
Non-Native, Invasive Species73% of Total Trees
Non-Native, Non-Invasive Species17% of Total Trees
Project Limit
N 15TH ST.
MESEROLE AVE.
FRAN
KLIN
ST.
/ KE
NT A
VE.
| Tree Inventory + Analysis
N
NTS
14 | Bushwick Inlet Park, Motiva Parcel
![Page 15: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/15.jpg)
15 | Bushwick Inlet Park, Motiva Parcel | Schematic Design Plan (Disapproved by CB#1)
BAYSIDE PARCEL
MONITOR PARCEL
BUSHWICK INLET
FRA
NK
LIN
ST.
/K
ENT
AVE.
STD. & ADA ACCESSIBLE PICNIC TABLES
PLANTED BERM
SAND ‘GET-DOWN’BACKLESS BENCHES
MULTI-PURPOSE LAWN
EX. 60” DIA. SEWER LINEORNAMENTAL GRASSES
TRASH COLLECTIONADA ACCESSIBLE ‘GET-DOWN’
OVERLOOK W/ BACKED BENCHES
ADA BINOCULARS
REVETMENT STONE/ SLOPE STABILIZATION
FUTURE CONNECTION TO MONITOR PARCEL
OSPREY STAND
CHAISE LOUNGES
ADA BINOCULARS
CONCRETE SIDEWALKPARK ENTRY
PARK ENTRY
BICYCLE RACKS
REVETMENT STONE/ SLOPE STABILIZATION
PLANTED AREA, TYP.
NEW CROSSWALK STRIPING& PEDESTRIAN RAMPESPLANADE PATHWAY (10’-0” WD.)REVETMENT PLANTERS
N
NTS
![Page 16: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/16.jpg)
16 | Bushwick Inlet Park, Motiva Parcel | Schematic Design - Summary of Revisions
1. Shoreline Treatment:• CB Comment: Provide a softer, more naturalistic shoreline.
• Reduced amount of revetment.• Incorporated tidal wetlands along waterfront edge.• Varied shoreline geometries.• Provided additional planting at waterfront edge.
2. Waterfront Access:• CB Comment: Provide direct access to the water.
• Relocated a larger sand kayak launch to the center of the site off the main pathway.• Enlarged kayak launch and added stone boulder seating.• Incorporated ADA access directly down to the water.• Provided a pathway which brings users right along the waterfront’s edge.
3. Circulation:• CB Comment: Rethink pathways; softer, more naturalistic, fewer.
• Reduced the number of pathways and total quantity of hardscape.• Reconfigured pathway geometries to have smooth, sweeping curves.
4. Ecology:• CB Comment: Provide more ecologically immersive planting.
• Introduced tidal wetlands along the waterfront (low & high marsh planting).• Provided a planting palette with year-round seasonal interest.
5. Program• CB Comment: Reduce program, more naturalistic.
• Removed the lawn, picnic tables & chaise lounges.• Provided a program which is more passive in experience.
![Page 17: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/17.jpg)
BAYSIDE PARCEL
MONITOR PARCEL
BUSHWICK INLET
FRA
NK
LIN
ST.
/K
ENT
AVE.
PLANTED BERM
EX. 66” DIA. SEWER LINE & EASEMENT: 38’-0”
ADA ACCESSIBLE ‘GET-DOWN’
TIDAL WETLANDS, TYP.(HIGH + LOW MARSHPLANTINGS)
FUTURE CONNECTION TO MONITOR PARCEL
OSPREY STAND
17 | Bushwick Inlet Park, Motiva Parcel | Schematic Design Plan
PUBLIC SIDEWALK
ADA BINOCULARS
RECONFIGURED STRIPING & BICYCLE LANES (BY DOT)
REVETMENT STONE/ SLOPE STABILIZATION
PLANTED AREA, TYP.
NEW CROSSWALK STRIPING, PEDESTRIAN RAMP & PARK ENTRY
ESPLANADE PATHWAY
N
NTS
SAND BEACH/ KAYAK LAUNCH WITH BOULDER SEATING
![Page 18: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/18.jpg)
MONITOR PARCEL
MTA- 40 QUAY STREET
BUSHWICK INLET
18 | Bushwick Inlet Park, Motiva Parcel | Schematic Design - Enlargement Plan 1 - North
![Page 19: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/19.jpg)
| Axonometric 1 - North19
| Bushwick Inlet Park, Motiva Parcel
A
A
B
B CC
D
D
E
E
F
G
F
G
BUSHWICK INLETREVETMENT STONE
ESPLANADE PATHWAY OSPREY STAND
CHAIN LINK FENCE
TIDAL WETLANDS/ HIGH MARSHTIDAL WETLANDS/ LOW MARSH
![Page 20: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/20.jpg)
20 | Bushwick Inlet Park, Motiva Parcel | Schematic Design - Enlargement Plan 2 - Central
BUSHWICK INLET
FRA
NK
LIN
ST.
/KEN
T AV
E.
![Page 21: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/21.jpg)
| Axonometric 2 - Central21
| Bushwick Inlet Park, Motiva Parcel
A
A
B
B
B C
C
DD
E
E
F
F
G
H
H
G
SAND BEACH/ KAYAK LAUNCHTIDAL WETLANDS/ LOW MARSH
BOULDER SEATINGESPLANADE PATHWAY
TIDAL WETLANDS/ HIGH MARSHEXIST. 66” DIA. SEWER
CHAIN LINK FENCE
ADA ACCESSIBLE GET-DOWN
![Page 22: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/22.jpg)
22 | Bushwick Inlet Park, Motiva Parcel | Schematic Design - Enlargement Plan 3 - South
BAYSIDEPARCEL
BUSHWICK INLET
FRA
NK
LIN
ST.
/ KEN
T AV
E.
![Page 23: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/23.jpg)
23 | Bushwick Inlet Park, Motiva Parcel
A
A
B
B C
C
D
D
E
E
F
F
G
G
BUSHWICK INLETREVETMENT STONE
LOWER ESPLANADE (5-FT WD.)BACKED BENCHES
SLOPED PLANTED AREAPUBLIC SIDEWALK
FRANKLIN STREET/ KENT AVE.
| Axonometric 3 - South
![Page 24: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/24.jpg)
BAYSIDE PARCEL
MONITOR PARCEL
BUSHWICK INLET
FRA
NK
LIN
ST.
/K
ENT
AVE.
HP 2+
13 12
11 10
9
9
8
9
1011
1213
1415
8
8
7654
4
5
6
7
788
7
7
6
6
6
6
5
555
4
44
3
3 3
2
2
2
1
1
1
0
00
0
0
0
0
-1-2
-2
-2
4.5%4.5%3.2%
1-1/2:1
1-1/2:1
1-1/2:1
2
4.5%
2%2%2%1.25%
1.25%
33%
16.6%
33%
FLAT
2%
+10.00
+9.85
+9.23
+9.66
+9.63
+9.52
+9.31
+9.11
+8.93
+8.81
+8.71
+8.52
+8.42
+
++
++
++
+
+
++
+++
++
++++
TW 10.5TW 9.5
TW 11.5TW 10.5
TW 13.5TW 12.5
TW 13.5TW 12.5TW 12.5
TW 11.5TW 11.5TW 10.5TW 9.5
TW 8.5TW 8.5
TW 10.5TW 9.5
TW 13.5
TW 12.5TW 11.5
+8.44
+TW10.44
+HP
| Schematic Grading Plan
N
NTS
Legend
Spot Elevation
Major ContourMinor Contour
Top of Wall Elev.
High PointDirection of Slope
24 | Bushwick Inlet Park, Motiva Parcel
![Page 25: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/25.jpg)
25 | Bushwick Inlet Park, Motiva Parcel | Perspective View
![Page 26: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/26.jpg)
LEGEND
| Fence Diagram
x
x*
x*
* = TEMPORARY FENCE UNTIL ADJACENT PARCEL IS COMPLETED
8’-0”*
7’-0
” *
8’-0”
8’-0”
MEDIUM FENCES(x= HEIGHT)
CLF
CLF
STEEL BAR
GATEG
FRAN
KLIN
ST.
/ KE
NT A
VE.
BAYSIDE PARCEL
MONITOR PARCEL
BUSHWICK INLET
G4’-0”
G
26Bushwick Inlet Park, Motiva Parcel
![Page 27: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/27.jpg)
LEGEND
| Site Furnishings
1964 World’s Fair Bench, 8’-0” Longw/ Back
Boulder SeatingBicycle Rack
Drinking FountainSecurity LightOsprey Stand
ADA Binoculars
+
+
=
=
Trash/ Recycling Receptacle
FRAN
KLIN
ST.
/ KE
NT A
VE.
BAYSIDE PARCEL
MONITOR PARCEL
BUSHWICK INLET
27Bushwick Inlet Park, Motiva Parcel
![Page 28: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/28.jpg)
BIKE RACK, FLO BY LANDSCAPE FORMS, STAINLESS STEEL, POLISHED [MASTERPLAN STD.]
1964 WORLD’S FAIR BENCH W/ ARMSGALV. STEEL FRAME W/ ‘CEDAR’ RPL
TYPE F HI-LO DRINKING FTN. & BOTTLE FILLER, COLOR: BLACK
DUAL BINOCULARSMFG: HI-SPYVIEWINGFREE & ADA ACCESSIBLE
TRASH / RECYCLING RECEPTACLESGREY BODY W/ BLACK, BLUE & GREEN LIDS
WATERFRONT PATHWAY TIDAL WETLANDS / LOW MARSH PLANTED SLOPES/ HIGH MARSH SECURITY LIGHTING- FLUSHING MEADOWS LUMINAIRE & POLE [GREENPOINT-WILLIAMSBURG MASTERPLAN STD.,12’-0” HT. ‘B-POLE’ AND ‘RIVERSIDE PARK LUMINAIRE’ COLOR: SILVER
28Bushwick Inlet Park, Motiva Parcel | Site Materials & Furnishings
![Page 29: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/29.jpg)
OSPREY STANDS NATIVE PLANTINGS & HABITAT RESTORATION
| Ecological Enhancements29
| Bushwick Inlet Park, Motiva Parcel
![Page 30: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/30.jpg)
BAYSIDE PARCEL
MONITOR PARCEL
TIDAL WETLAND:LOW MARSH PLANTINGS
PATHWAY: SHRUBS, PERENNIALS GROUNDCOVERS
HIGH MARSH PLANTING
FRA
NK
LIN
ST.
/K
ENT
AVE.
| Planting Typology Identification Plan
N
NTS
LEGEND
GRASSES/ MEADOW MIX
30 | Bushwick Inlet Park, Motiva Parcel
![Page 31: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/31.jpg)
31 | Bushwick Inlet Park, Motiva Parcel
Common Hackberry / Celtis occidentalis Blackgum / Nyssa sylvatica Pitch Pine / Pinus rigida Northern Red Oak / Quercus rubra Black Oak / Quercus velutina
Eastern Redbud / Cercis canadensisEastern Red Cedar /juniperus virginiana
Black Cherry / Prunus serotina Staghorn Sumac / Rhus typhinaQuercus palustris / Pin Oak
| Plant Palette - Major & Minor Trees (Sampling)
![Page 32: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/32.jpg)
32 | Bushwick Inlet Park, Motiva Parcel
Bayberry / Morella pensylvanicaCarolina Rose / Rosa carolina Eastern Baccharis / Baccharis halimifolia
High-tide Bush / Iva frutescensSweet Pepperbush / Clethra alnifolia
| Plant Palette - Shrubs (Sampling)
![Page 33: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/33.jpg)
33 | Bushwick Inlet Park, Motiva Parcel
Seacoast bulrush /Bolboschoenus robustus
Saltmeadow Rush / Juncus gerardii Pennsylvania smartweed /Persicaria pensylvanica
Virginia glasswort /Salicornia depressa
Coastal little bluestem /schizachyrium littorale
Seaside Goldenrod /Solidago sempervirens
Smooth Cordgrass/ Spartina alterniflora Saltmeadow cordgrass /Spartina patens
New York Aster /Symphyotrichum novi-belgii
Switchgrass / Panicum virgatum
| Plant Palette - High Marsh & Low Marsh (Sampling)
![Page 34: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/34.jpg)
TIDAL WETLAND
HIGH MARSH
MEADOW
PATHWAY: SHRUBS, PERENNIALS GROUNDCOVERS
01 0704 1002 0805 1103 0906 12
34 | Bushwick Inlet Park, Motiva Parcel | Plant Palette - Seasonal Interest
![Page 35: Bushwick Inlet Park Motiva Parcel · CB1 - Parks Committee Meeting, Schematic Design Presentation June 03, 2020 Abel Bainnson Butz, LLP Total Budget: $9,818,000 Mayor, Bill de Blasio](https://reader033.vdocuments.mx/reader033/viewer/2022052722/5f0d1e647e708231d438c557/html5/thumbnails/35.jpg)
N
NTS
35Bushwick Inlet Park, Motiva Parcel | Schematic Design