Replace Belle Chasse Tunnel & Bridge Stage 1 Environmental Assessment State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel HCIA Infrastructure Committee Meeting Thursday, July 18, 2013 • Conference Room • 111 Grefer Lane, Harvey, LA

Upload: bblochnola

Post on 03-Jan-2016

16 views

Category:

Documents


1 download

DESCRIPTION

Burk-Kleinpeter made this presentation on Thursday, July 18, 2013, to the Harvey Canal Industrial Association's Infrastructure Committee. It discusses various alternative Belle Chasse bridges.

TRANSCRIPT

Page 1: Burk-Kleinpeter Presentation 7-18-13

Replace Belle Chasse Tunnel & Bridge Stage 1 Environmental Assessment State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

HCIA Infrastructure Committee Meeting Thursday, July 18, 2013 • Conference Room • 111 Grefer Lane, Harvey, LA

Page 2: Burk-Kleinpeter Presentation 7-18-13

AGENDA

I. Welcome II. Project Status Summary

a. Public Information Meeting b. Maritime Operations Meeting

III. Current Project Alternatives IV. Funding Availability V. Public Hearing VI. Questions and Comments VII. Adjourn

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

Page 3: Burk-Kleinpeter Presentation 7-18-13

PUBLIC INFORMATION MEETING

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

MEETING STATISTICS

• Open House Format Meeting held February 26, 2013

• 5:30 – 8:00 pm in the Belle Chasse Auditorium • Community residents started arriving at 5:15 pm • Last community resident left just before 8:00 pm

• Total Sign-in Attendance: 159 Residents; 5 Elected Officials (and Staff); 11 Agency Representatives, 4 Members of the Press

• Advertisements in The Times-Picayune and The Plaquemines Gazette combined with:

• 235 Direct Mail Post Cards (to Agencies, Stage 0 Meeting Participants, Commenters on-line)

• PSAs in local media outlets (TV, Radio, Newspaper) • Newspaper articles in The Plaquemines Gazette

Page 4: Burk-Kleinpeter Presentation 7-18-13

MARITIME OPERATIONS MEETING

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

FOLLOW-UP TO PUBLIC INFORMATION MEETING • Purpose: Review technical results of Marine Vessel Study

regarding industry recommendations for the bridge horizontal clearance

• Meeting held on March 14, 2013 at RPC Offices

• Meeting included representatives of US Coast Guard, Gulf Intracoastal Canal Association, NO Gulf Coast Railroad and DOTD Bridge Section, DOTD District 02, RPC and project team

GICA NOT OPPOSED TO SIZING NEW BELLE CHASSE BRIDGE REPLACEMENT WITH A 150 FT. HORIZONTAL CLEARANCE

Page 5: Burk-Kleinpeter Presentation 7-18-13

Alt #1- 100 FT Fixed Bridge – Northern Section

Photo updated with Google Earth Imagery, 10/5/12

Legend

Business/Industrial Site Residence

Page 6: Burk-Kleinpeter Presentation 7-18-13

Alt #1- 100 FT Fixed Bridge – Central Section

Casino

Chauvin Bros. Tractor Sales Vacant

Tuboscope

Legend

Business/Industrial Site Residence

Page 7: Burk-Kleinpeter Presentation 7-18-13

Alt #1- 100 FT Fixed Bridge – Southern Section

Photo updated with Google Earth Imagery, 10/5/12

Shopping Center

(5) Stratus Systems

Rubion Tires

Legend

Business/Industrial Site Residence

Page 8: Burk-Kleinpeter Presentation 7-18-13

Alt #2- 70 FT Moveable Bridge – Northern Section

State Oil Fuel Center

Chauvin Bros. Tractor Sales Vacant

TUBOSCOPE

Legend

Business/Industrial Site Residence

Page 9: Burk-Kleinpeter Presentation 7-18-13

Alt #2- 70 FT Moveable Bridge – Southern Section

Photo updated with Google Earth Imagery, 10/5/12

Shopping Center

(5) Stratus Systems

Rubion Tires

Legend

Business/Industrial Site Residence

Page 10: Burk-Kleinpeter Presentation 7-18-13

Alt #3- 60 FT Moveable Bridge – Northern Section

Chauvin Bros. Tractor Sales Vacant

Legend

Business/Industrial Site Residence

Page 11: Burk-Kleinpeter Presentation 7-18-13

Alt #3- 60 FT Moveable Bridge – Southern Section

Photo updated with Google Earth Imagery, 10/5/12

Shopping Center

(5)

Legend

Business/Industrial Site Residence

Page 12: Burk-Kleinpeter Presentation 7-18-13

Alt #4- 73 FT Fixed Bridge – Northern Section

State Oil Fuel Center

Chauvin Bros. Tractor Sales Vacant

Tubascope

Legend

Business/Industrial Site Residence

Page 13: Burk-Kleinpeter Presentation 7-18-13

Alt #4- 73 FT Fixed Bridge – Southern Section

Photo updated with Google Earth Imagery, 10/5/12

Shopping Center

(5) Stratus Systems

Legend

Business/Industrial Site Residence

Page 14: Burk-Kleinpeter Presentation 7-18-13

ORDER OF MAGNITUDE COST ESTIMATES

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

Alternative & Description 5 % Approach Grades

6 % Approach Grades

Alt 1: 100 Ft. Fixed Bridge $168.8 million $152.5 million

Alt 2a: 70 Ft. Bascule Bridge $164.7 million $150.3 million

Alt 2b: 70 Ft. Vertical Lift Bridge $161.9 million $148.0 million

Alt 3a: 60 Ft. Bascule Bridge $140.9 million $130.8 million

Alt 3b: 60 Ft. Vertical Lift Bridge $139.7 million $133.6 million

Alt 4: 73 Ft. Fixed Bridge $125.3 million $110.6 million

Costs include removal of the existing lift span and closure of the existing tunnel. Costs shown are considered for planning purposes only. Cost estimates reflect refinements to project alternatives made as a result of the analysis of alternatives included in the ongoing Stage 1 Environmental Study. Cost estimates incorporate a 20% Contingency factor, as well as utilizing LADOTD unit costs based upon bid tabulations and general trend averages. As of July 16, 2013.

preliminary – nOT Final

Page 15: Burk-Kleinpeter Presentation 7-18-13

FUNDING AVAILABILITY

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

FROM PROJECT PURPOSE & NEED • Comply with Fiscal Constraint Objectives

• Improve efficiency with lower O&M Costs

FUTURE FUNDING HAS YET TO BE FULLY IDENTIFIED • MAP-21 in effect through FY 2014

• In making funding projections for the 2040 Metropolitan Transportation Plan, the RPC assumed that there would be very few, if any, new funding sources available. The program identified, therefore, is limited to what could reasonably be funded given historic funding levels from federal, state, and local sources.

Regional Planning Commission 2040 Metropolitan Transportation Plan (pg. 45)

Page 16: Burk-Kleinpeter Presentation 7-18-13

EXISTING GIWW BRIDGE AND STRUCTURE OPENINGS

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

Page 17: Burk-Kleinpeter Presentation 7-18-13

EXISTING GIWW BRIDGE AND STRUCTURE OPENINGS

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

Map Number Location Type Horizontal

Clearance Vertical

Clearance

1 Algiers Lock Navigation Control Structure 75 feet —

2 Highway 407 Fixed Bridge 250 feet 100 feet

3 Belle Chasse Bridge Moveable Bridge 125 feet 100 feet

NOGRR Bridge Moveable Bridge 125 feet 100 feet

4 West Control Structure Water Control Structure 225 feet —

5 Lapalco Boulevard Bridge Moveable Bridge 150 feet —

Westbank Expressway Bridge Fixed Bridge 300 feet 95 feet

6 Crown Point/ LA 3134 Bridge Fixed Bridge 150 feet 73 feet

7 LA 308 Bridge Fixed Bridge 150 feet 73 feet

LA 1 Bridge Moveable Bridge 125 feet 73 feet

8 LA 316 Bridge Pontoon Bridge 125 feet —

9 LA 3087 Bridge Fixed Bridge 125 feet 73 feet

10 Park Avenue Bridge Fixed Bridge 125 feet 73 feet

Main Street Bridge Fixed Bridge 125 feet 73 feet

11 Houma Intracoastal Waterway Tunnel -n/a- —

12 LA 315 Bridge Moveable Bridge 125 feet —

Page 18: Burk-Kleinpeter Presentation 7-18-13

PUBLIC HEARING

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

Pictures from Public Information Meeting, Stage 0 Feasibility Study, 2008

Page 19: Burk-Kleinpeter Presentation 7-18-13

Replace Belle Chasse Tunnel & Bridge Stage 1 Environmental Assessment State Project No. 700-38-0108 • H.004791 • Federal Aid Project No. DE-3806(500) • RPC Contract No. BCTunnel

Thanks for your attendance! Harvey Canal Industrial Association Meeting • Thursday, July 18, 2013