EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle
Bund Ref. No.: 1 DMSO Break Tank
Licence Reg. No.: EPA IPPC no. 652 Bund Type (Loca I/Rernote/torn bin ed/Portable): Local
~
Bund Dimensions: L=m; W=m; H=m Bund Construction Material:
Bund Lining Material: CRC 1.32111~ Bund Retention Volume:
Primary Vessel(s) - Materials of Construction: PV-50119 Stainless Steel Primary Vessel(s) -Total Storage Volume:
Primary Vessei(s) - 110% Volume of Largest Vessel:
Primary Vessel(s) -25% of Total Storage Volume:
Reinforced Concrete 1.2m3
Deemed Practicable / Safe t o Conduct Hydrostatic Test? No If nogive reasons: Tank in operation
Qualification: BZc. Environmental Science MIEI
Signed: pk*
HYDROSTATIC TEST DETAILS:
Date: 16th June 2017
1 BS 8007:1!387 (Yes/No)? 1 Fifl Rate
Stabilisation Period
Duration of the Test
I Acceptance Criteria (Total permirisifib drop in water h e t ) Water Level Change in Reference Vessel
Description / Comments of Hydrostatic Test: N/A
VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund appears to be in good condition
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING
Site: Pfizer Grange Castle
Bund Ref. No.: 2 Trade Effluent Water (south lift station)
Bund Dimensions: L=m; W=m; H=m Bund Constructian Material: Reinforced Concrete Bund Lining Materiat: lacquer coating
Bund Retention Volume: Unknown
Licence Reg. No.: EPA IPPC no. 652 BundType (local/Remote/Combined/PoRable): local Primary Vessel(s) -Materials of Construction: a 5 ~ ~ - 8 7 5 0 1 Stainless Steet Primary Vessel(s) -Total Storage Volume: 45m3 Primary VesselIs) - 110% Volume of Largest Vessel:
Primary Vessel(s) - 25% of Total Storage Volume: 11.25rn3
BS 8007:1987 (Yes/No)?
Fill Rate
Stabilisation Period
Duration of the Test
Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel
Qualification: BSc. Environmental Science MlEl
Signed:
Date and Time I Water tevel in 3und I Water Level in Reference Vessel I 1 1
Date: June 2017
Description / Comments of Hydrostatic Test: N/A
VISUALTEST DETAILS: lNSPECTION DESCRIPTION L(L RESULTS: The bund is in good condition
Result (PasslFaiI) 1 PASS
Recommendation(s): - Power wash the bund.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR ~ U N D TESTING
Site: Pfizer Grange Castle
Bund Ref. No.: 3 Chemical Dosing Bund
Bund Dimensions:
Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Com bined/Portable): Local
Primary Vessel(s) -Materials of Construction: L=m; W=m; H=m Bund Construction Material:
1 Double contained polypropylene 1 Primary Vessel(s) -Total Storage Vofume:
Concrete Bund Lining Material:
17.2 /2.3/10.4m3 Primary Vessel(s) - 110% Volume of Largest Vessel:
CRC Bund Retention Volume:
HYDROSTATK TEST DETAILS:
0.022 m3 Primary Vessel(s) - 25% of Total Storage Volume:
B5 8007:1987 (YeslNa)?
Fill Rate Stabilisation Period
Duration of the Test
Acceptance Criteria (Total permissible drop in water
Qualification: BSc. Environmental Science MlEI
Signed:
level) Water level Change in Reference Vessel
Date: 161h June 2017
Description / Comments of Hydrostatic Test: N/A
VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is in good condition
Result (Pass/Fail) PASS Recornmendation(s):
None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
Site: Pfizer Grange Castle
Bund Ref, No.: 4 CHP Chemicat Store Bund
Licence Reg. No.: EPA lPPt no. 652 Bund TVpe (Local/Rernote/Com bined/Portable): Local
Bund Dimensions: L=m; W=m; H=m
Bund €onstruction Material: themstore - Steel
NYDROSTATIC TEST DETAILS:
Primary Vessei(s) - Materials of Construction:
Primary Vessel(s)-Total Storage Votume:
858007:1987 (Yes/No)? I
Bund Lining Material: None
Bund Retention Volume:
Fill Rate
Stabilisation Period
Primary Veesselts) - 110% Volume of Largest Vessel:
Primary Vessel(s) - 25% of Total Storage Volume:
Duration of the Test I
QuaBfication: BSc. Environmental Science MIEt
Signed:
Acceptance Criteria (Total permissible drop in water level] Water Level Change in
Date: June 2017
Reference Vessel I
Description / Comments of Hydrostatic Test: M/A
VtSUALTEST DETAILS: !NSPECTiON ~E5CRltTlOrU & RESULTS: The bund is in good condition
Result (PasdFail) Recomrnendation(s):
None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR 8 U N D TESTING Site: Pfizer Grange Castle
Bund Ref. No.: 5 Anti Foam Skid Bund
Bund Dimensions:
Bund Construction Material: Polypropylene Bund Lining Material: None Bund Retention Volume:
L=m; W=m; H=m
Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Combined/Portable): Local
Primary Vessel(s) - Materials of Construction:
Primary Vesselts) -Total Storage Volume: 1.60m3 Primary Veasel(s) - iXO% Volume of Largest Vessel: N/A Primary Vessel(s) - 25% of Total Storage Volume:
ZSTA-87511
Deemed Practicable / Safe to Conduct Hydrostatic Test? No If no give reasons: Tank in operation
I- Date and Time Water Level in Bund
HYDROSTATICTEST DETAILS:
Water Level in Reference Vessel
6s 8007:1987 (Yes/No)?
Fit! Rate Stabitisation Period
Duration of the Test
Qualification: BSc. Environmental Science MlEi
Signed:
Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel
Date: lbth June 2017
Description /Comments of Hydrostatic Test: M/A
VISUALTEST DETAJLS: INSPECTION DESCRIPTIQN & RESULTS: The bund wall lip is broken, however the integrity of the bund is still intact.
Result (Pass/Faif) pass Recommendation(s): The crack in bund lip should be repaired.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle
3und Ref. No.: 6 pH Balance Tank #1
Licence Reg. No.: EPA IPPC no. 652 6und Type (LocaI/Remote/Cornbined/Portable): Local
3und Dimensions: F=m; W=m; H=m Bund Construction Material:
Bund Lining Material: CRC Bund Retention Volume: 218rn3
Reinforced Concrete
Fill Rate
Stabilisarion Period
Primary Vessel(s) - Materials of Construction: 05TA-87503 Stainless Steel Primary Vessel(s1 -Total Storage Volume: 20041~1~ Primary Vessel(s) - 110% Volume of Largest Vessel: 2200rn3 Primary Vessel(s) -25% of Total Storage Volume: 500rn3
Duration of the Test I
Date and Time
HYDROSTATIC TEST DETAILS:
Water Level in Bund Water Level in Reference Vessel
Acceptance Criteria {Total permissible drop in water
Qualification: BSc. Environmental Science MlEl
Signed:
level) I Water Level Change in Reference Vessel
Date: lQh June 2017
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle
Bund Ref. No.: 7 pH Balance Tank #2 Bund
Licence Reg. No.: EPA IPPC no. 652 Bund Type (LocaI/Rernote/Cornbined/Portable): Local
Bund Dimensions: L=m; W=m; H=m Bund Construction Material:
Bund Lining Material:
Bund Retention Volume: mrn3
Reinforced Concrete
CRC
BS 8007:1987 (Yes/No)? 1 1
Primary Vessel(s) - Materials of Construction: 05TA-87509 Stainless Steel PrirnaryVessel{s) -Total Starage Volume:
Primary Vessel(s) - 110% Volume of Largest Vessel:
Primary Vessel(sj -25% af Total Storage Volume: 500m3
2000m3
2 2 0 0 ~ ~
Fill Rate
Stabilisation Period
Date and Time
-
Duration of the Test
Acceptance Criteria {Total 1 I
Water Level in Bund Water Level in Reference Vessel
permissibre drop in water 1 I
Qualification: 6%. Environmental Science MlEt
Signed:
level) Water Level Change in
Date: 16th June 2017
Reference Vessel I t
HYDROSTATKTEST DETAILS:
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING
Bund Ref. No.: 8 Odour Abatement Bund Bund Type (Local/Remote/Combined/PortableJ: Local
Bund Dimensions: L=m; W=m; H=m Bund Construction Material:
Primary Vessel(s) - Materials of Construction: 05-Fl-87516 Polypropylene Primary Vessel(s) -total Storage Volume:
BS 8007:1987 (Yes/No]? I 1
Bund Lining Material: CRC
Bund Retention Volume:
FTI Rate
Stabilisation Period
Duration of the Test
Primary Vessetts) - 110% Volume of Largest Vessel:
Primary Vessal(s) - 25% of Total Storage Volume:
I Acceptance Criteria (Total permissible drop in water
Qualification: BSc. Environmental Science MtEf
Signed:
level) Water Level Change in Reference Vessel
Date: 16fh June 2017
Description / Comments of Hydrostatic Test: M/A
VfSUAL TEST DETAIi.5: lNSPECTlON DESCRIPTION & RESULTS: The bund is in good condition, however the previousty identified hairline cracks were not visible during the inspection which was probably due to the wet weather.
Result (Pass/Fail) PASS Recommendation{s):
Inspect the bund on a dry day to inspect previously noted hairline cracks.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING
Date and Time Water Level in Bund Water Level in Reference Vessel
I
Site: Pfizer Grange Castle I
Qualification: BSc. Environmental Science MIEI
Signed:
Bund Ref. No.: 9 Soft Water Store Bund I
Date: lSih June 2017
Bund Dimensions: C=m; W=m; H=m
Bund Construction Material: Reinforced Concrete Bund Lining Material: None Bund Retention Volume: Entire floor of building Deemed Practicabie / Safe to Conduct: Hydrosta If no give reasons: Tank in operation
Licence Reg. No.: EPA IPPC no. 652 Bund Type (Locai/Remote/Combined/Partable): Combined with a building
Primary Vessel(s) - Materials of Construction: TAU-0304 SC TA-78611-00 Double contained polypropylene & GRP Primary Vesael{s) -Total Storage Volume: 4m3 PrimaryVesset(s) - 110% Volume of Largest Vessel:
Primary Vessel(s) - 25% of Total Storage Volume: 1 . 1 ~ ~
1m3 c Test? Ma
35 8OO7:1987 {Yes/No)? I 1 fill Rate
Stabilisation Period
Duration of the Test I I
HYDROSTATIC TEST DETAIW
Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel
VISUAL TEST DETAILS: INSPECTION DESCRiPTION & RESULTS: The bund is in good condition
I Result (PasslFail) I PASS
I Recommendation@):
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle
Bund Ref. No.: 10 Acid/Casustic Loading and unloading Bund
Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete Bund Lining Material: None Bund Retention Volume:
Licence Reg. No.: EPA IPPC no. 652 Bund Type (LocaI/Rernote/Combined/Portable): Local
Primary Vessel(s) - Materials of Construction: Loading pumps Primary Vessel(s) -Total Storage Volume:
Primary Vessel(s) - 110% Volume of largest Vessel:
Primary Vessel(s) - 25% of Totaf Storage Volume:
HYDROSTATICTEST DETAILS:
Qualification: BSc, Environmental Science MlEl
Signed:
BS 8007:1987 (Yes/No)?
Filt Rate
Stabilisation Period
Duration of the Test Acceptance Criteria (Total permissible drop in water level) Water level Change in Reference Vessel
Date: 16fh June 2017
Description / Comments of Hydrostatic Test: N/A
- VISUALTEST DETAILS: 1NSPECTtON DESCRIPTION & RESULTS:
The bund is in good condition.
Result (Pass/Fail) 1 PASS
Recammendation(s): None.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECURD SHEET FOR BUND TESTING Site: Pfizer Grange Castle
Bund Ref. No.: 1% Fuel Oil Tank Bund
Licence Reg. No.: EPA lPPC no. 652 Bund Type (Locai/Remote/Combined/Portatrle): Local
Bund Dimensions: L=m; W=m; H=m
Primary Vessel(s) -Materiais of Construction: ETA-825000 Steel
Deemed Practicable / Safe t o Canduct Hydrostatic Test? No If no give reasons: Tank in operation
HYDROSTATIC TEST DETAILS:
Bund Construction Material: Reinforced concrete
] BS 8807:1987 {Yes/No)? 1 1
Primary Vessel(s) -Total Storage Vohme: 200m3
Fill Rate Stabilisation Period
Bund Lining Material:
Bund Retention Volume: None
I Duration of the Test 1 I
Primary Vessei(s) -%IO% Volume of Largest Uessel:
Primary Vessel(sj - 25% of Total Storage Volume:
220m3
Acceptance Criteria (Total permissible drop in water ievel) Water Lwei Change in Reference Vessel
Qualification: BSc. Environmental Science MIEI
Signed:
I Date and Time I Water Level in Bund 1 Water Level in Reference Vessel I
Date: 16” June 2017
t
Description / Comments of Hydrostatic Test: N/A
VISUALTEST DETAILS: tNSPECTlON DESCRIPTION & RESULTS: A Concrete protective coating has been applied to the bund since the 2014 inspection. Overall the bund is in good condition.
Result (Pass/Fail) lpAss Recommendation(s):
None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING Site: Pfiaer Grange Castle
Bund Ref. No.: 12 Sulphuric Acid Tank Bund
Licence Reg. No.: EPA IPPC no. 652 3undType(Local/Rernote/Cornbined/Portable): Locat
Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete
1 7.5m3 Deemed Practicable / Safe to Conduct Hydrostatic Test? No If no give reasons: Tank in operation
Primary Vessel(sj -Materials of Construction: 05TA-94520 Stainless Steel Primary Vessel(s) -Total Storage Voiume: 30m3
HYDROSTATIC TEST DETAILS:
Qualification: B5c. Environmental Science MIEI
Signed:
BS 8007:1987 (Yes/No)?
Fill Rate
Stabilisation Period Duration of the Test
Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel
Date: 16th June 2017
Date and Time I Water Level in Bund I Water Level in Reference Vessel I
Iescription / Comments of Hydrostatic Test: N/A
VISUALTEST DETAILS: lNSPECTlON DESCRIPT~ON & RESULTS: The bund is in good condition and the previously identified remedial works have been undertaken.
Result (Pass/Fail) I PASS
Recommendation(s): None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle
Bund Ref. No.13 CIP Tank Bund
Licence Reg. No.: €PA IPPC no. 652 Bund Type (Local/Remote/Com bined/Portable): Local
3und Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete Bund Lining Material: None
Bund Retention Vofume: 51m’
1 BS 8007:1987 (YeslNo)? 1 1
Primary Vessel(a) - Materials of Construction: 05TA-95301 Polypropylene Primary Vessel(s) -Total Storage Volume: 42m3 Primary Vessel(s) - 110% Volume of largest Vessel:
Primary Vessel(s) -25% of Total Storage Volume:
Filt Rate
StabiIisation Period 1
Qualification: B5c. Environmental Science MIEi
Signed:
Duration of the Test
Acceptance Criteria (Total permissible drop in water level) Water level Change in Reference Vessel
Date: Sth June 2017
Date and Time 1 Water Level in Bund I Water Level in Reference Vessel
t
Description / Comments of Hydrostatic Test: N/A
VISUAL TEST DETAILS: INSPECTION DEsCRiPTtoN & RESULTS: The bund is in good condition. Previously noted hairline cracks were not noted, but this is probably due to the bund being wet from the weather.
Result (Pass/Fail) PASS Recornrnendation(s): - Hairline cracks to be monitored during the routine maintenance operations.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING
loam3
Site: Pfizer Grange CasNe
10.5rn3
Bund Ref. No.: 14 Sodium Hydroxide & Reagent CausticStorage Bund
Bund Dimensions: t=m; W=m; H=rn Bund Construction Material: Reinforced Concrete Bund Lining Material: CRC
Qualification: 3Sc. Environmental Science MlEl
Signed:
1 Bund Retention Volume:
Date: Wh June 2017
Licence Reg. No.: €PA IPPC no. 552 Bund Type (LocaI/Remote/Combined/Portablef : LocaI
Primary Vessel(s) - Materials of Construction: 05TA-94530 & ETA-95304 Stainless Steel PrimaryVessel{s) -Total Storage Volume: 42m3 & 30m3 Primary Vesselfs) - 110% Volume of Largest Vessel: 46.1rn3 Primary Vessel(s) - 25% of Total Storage Volume:
HYDROSTATICTEST DETAILS:
BS 8007:1987 (Yes/No)?
Fili Rate
Stabilisation Period
Ouration of the Test
Acceptance Criteria (Total permissible drop in water levell
I
Water Level Change in Reference Vessel
Date and Time 1 Water Level in ~ u n d I I
I Water Level in Reference Vessel
Description / Comments of Hydrostatic Test: N/A
VfsUALTEst DETAILS: INSPECTION DESCRIPT~ON & RESULTS: The bund is in good condition and the previously identified remedial works have been undertaken.
Result ( ~ a s s / ~ a i ~ ) I PASS
Recommendation(s): - None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BLINDTESTING
Bund Ref. No.: 15 Ethanol Tank Bund
Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete Bund Lining Material:
Site: Pfizer Grange Castle 1 Licence Reg. No.:
Bund Type (tocal/Remote/Cornbined/Portable): Locat
Primary Vessel(s) - Materials of Construction: 05fA-94500 Stainless steel Primary Vessel( s) -Total Storage Volume: 30m3 Primary Vesset(s) - 110% Volume of Largest Vessel:
CRC Bund Retention Vofurne: 83m3
33m3 Primary Vessel(s) - 25% of Total Storage Volume: 7.5m3
Deemed Practicabte / Safe to Conduct Hydrostatic Test? No If no give reasons: This bund is not in operation
HYDROSTATIC TEST DETAILS:
Qualification: BSc. Environmental Science MIEI
Signed:
Fill Rate
Stabilkation Period
Duration of the Test
Date: 16Ih June 2017
Acceptance Criteria (Total permissible drop in water level] Water Level Change in Reference Vessel
1 Date and Time 1 Water Level in Bund 1 Water Level in Reference Vessel 1
Description / Comments of Hydrostatic Test: N/A
VISUAL TEST DETAILS: hJSPECTlON DESCRIPTION & RESULTS: While this Bund is currently not in operation it does appear to be in a good condition.
Result (Pass/Fail) lPASS Recornmendation(s):
None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING
Site: Pfizer Grange Castle
Bund Ref. No.: 16 West Drum Store Bund
Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Com bined/Portable): Combined with a buitding
Bund Dimensions: t=m; W=m; H=m
Bund Construction Material: Reinforced Concrete Bund Lining Materiak CRC Bund Retention Volume: S.5/3.7/3.7m3
Fil l Rate Stabilisation Period 1
Primary Vesselts) - Materials of Construction:
Primary Vessel(s) -Total Storage Vohme: 26/14.8/14.8m3 Primary Vessel(s) - 110% Volume of Largest Vessel: l . l m 3 Primary Vessel(s) - 25% of Total Storage Volume: 3.6/3.7.3.7rn
Date and Time Water Level in Bund
Description / Comments of Hydrostatic Test: N/A
VlslJAL TEST DETAILS: frUSPECTlON DESCRIPTION & RESULTS: The bund is in good condition
Result (Pass/Fail) pSS Recornmendation(s):
None
Water Level in Reference Vessel
Qualification: BSc. Environmental Science MtEt
Signed: Date: 16th June 2017
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING
Site: Pfizer Grange Castle
Bund Ref. No.: 17 Spill Containment Bund
Bund Dimensions: L=m; W=m; H=m Bund Construction Material: HDPE Bund Lining Material:
Bund Retention Volume:
Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Combined/Portable): tocal
Primary Vessel(s) - Materials of Construction: None Primary Vessel(s) -Total Storage Volume:
Primary Vessel(s) - 110% Volume of Largest Vessel:
Primary Vessel(s) - 25% of Total Storage Volume:
HYDROSTATICTEST DETAILS:
Qualification: BSc. Environmental Science MIEI
Signed:
1 BS 8007:2987 (Yes/No]? I
Date: lSth June 2017
Fill Rate Stabilisation Period
Duration of the Test
Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel
Date and Time 1 Water Level in 6und 1 Water level in Reference VesseI t
Description / Comments of Hydrostatic Test: N/A
VISUALTEST DETAILS: hSPECTtUN DESCRIPTION- & RESULTS: The bund i s in good condition and the previously identified remedial works have been undertaken.
Result (Pass/fail) lPASs Recommendation(s):
+ None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING
Site: Pfizer Grange Castle
Bund Ref. No.: 18 East Drum Store Bund
Bund Dimensions: t=m; W=m; H=m
Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Rernote/Corn bined/Portable): Combined with a building
Primary Vessel(sf - Materials of Construction:
Bund Construction Material: Floor trenches and sprilldecks Bund Lining Material: CRC
Primary Vessel(s) -Total Storage Volume: N/A Primary Wessel(sJ - 110% Volume of Largest Vessel: N /A
HYDROSTATIC TEST DETAILS:
Bund Retention Votume; 4.3/0.8/2.6m3
BS 8007:1987 (Yes/No)? 1 Fill Rate I
Primary Vessel(s) - 25% of Total Storage Volume: N/A
Stabitisation Period
Duration of the Test
Date and Time
Acceptance Criteria (Total permissible drop in water levell
Water Level in Bund Water Level in Reference Vessel
Water Level Change in Reference Vessel
Qualification: BSc. Environmental Science MlEl
Signed: Date: 16th June 2017
Description / Comments of Hydrostatic Test: N/A
V~SUALTEST DETAILS: INSPECTiON DESCRIPTION & RESULTS: This bund is in good condition
Result (Pass/FaiI) lPASS Recommendation(s): None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR 8UND TESTING
Date and Time
We: Pfizer Grange Castle
Water Level in Bund Water Level in Reference Vessel
Bund Ref. No.: 19 Utility Water Dosing Unit Bund
Qualification: BSc. Environmental Science MI€[
Eigned:
Bund Dimensions: L=m; W=m; H=m Bund Construction Material: HOPE
Date: lQh June 2017
Bund Lining Materia#:
Bund Retention Volume: 1.98m3
Licence Reg. No.: EPA IPPC no. 652 Bund Type (CocaI/Remote/Cornbined/Portablej: Local
Primary Vessel(s) - Materials of Construction: TA-05 1 l694B HD PE Primary Uessel(s) -Total Storage Vokme:
Primary Vessel(s) - 110% Volume of Largest Vessel:
Primary Vessel(s) -25% of Total Storage Volume:
Deemed Practicable /Safe to Conduct Hydrostatic Test? Na If no give reasons: Tank in operation
HYDROSTATIC TEST DETAILS:
B5 8007:1987 (Yes/No)? Fill Rate Stabilization Period
I Duration of the Test t I Acceptance Criteria (Total permissibk drop in water level) Water leve Change in Reference Vessel.
VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is in good condition.
Result (Pass/Fait) lPASS Recommendationts):
+ None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING
Chemstore Reel Bund Lining Material:
Bund Retention Vofume:
Site: Pfizer Grange Castle
Primary Vessel(s) - 110% Volume of Largest Vessel:
Primary Vessel(s) -25% af Total Storage Volume:
Bund Ref, No.: 20 Decanting Chemical Store Bund
Bund Dimensions: L=m; W=m; H=m Bund Construction Material:
Date and Time Water Level in Bund
Licence Reg. No.: EPA IPPC no. 652 Bund Type (LocaI/Remote/Combined/Portable): Local
Water Level in Reference Vessel
Primary Vessel(5) -Materials of Construction: Steel/plastic Primary Vessel(s) -Total Storage Volume:
_ _ fill Rate
Stabilisation Period
Duration of the Test
Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FUR BUND TESTING
L=m; W=m; H=m Bund Construction Material:
Site: Pfizer Grange Castk
Steel/ptastic Primary Vessel(s) -Total Storage Volume:
I Bund Dimensions:
HDPE Tray Inserts Bund Lining Material: None
Licence Reg. No.: EPA IPPC no. 652 Bund Type I: Local/Rernote/Corn bined/Partable): Combined with Racking
Primary Vessel(s) - Materials of Construction:
Primary Vessells) - 110% Volume of Largest Vessel:
Qualification: BSc. Environmental Science MlEI
Signed: p , p Date: 16th June 2017
1 Deemed Practicabfe / Safe to Conduct HydrostaticTest? No If no give reasons: Racking in operation
HYDROSTATICTEST DETAILS:
B5 8007:1987 (Yes/No)?
Fill Rate
Stabilisation Period
Duration of the Test
Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel
Date and Time I Water Level in Bund I Water Level in Reference Vessel
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle
Bund Ref. No.: 22 MRO Chemical Store Bund store
Bund Dimensions: t=m; W=m; H=m Bund Construction Material: Chemstore Steel Bund Lining Material:
Bund Retention Volume:
Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Comt3ined/Portable): Local
Primary Vesset(s) - Materials of Construction: Steel/plastic Primary Vessel(s) -Total Storage Volume:
Primary Vessel(s) - 110% Volume of Largest Vessel:
Primary Vessel(s) - 25% of Total Storage Volume:
IfYDROSTATICTEST DETAILS:
Date and Time Water tevel in Bund Water Level in Reference Vessel
t
BS 8007:1987 (Yes/Na)?
Fill Rate
Stabilisation Period
Duration of the Test
Acceptance Criteria (Total permissible drop in water fevel) Water Level Change in Reference Vessel
Qualification : BSc. Environmental Science MlEl
Signed: Date: 16rh June 2017
Description / Comments of Hydrostatic Test: N/A
VISUAL TEST DETAILS: lNSPECTtON DESCRIPTION & RESULTS: The bund is in good condition
Result (Pass/Fail) lpASS Recommendation(s): None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
Site: Pfizer Grange Castle
Bund Ref. No.: 23 Oil Storage Bund
Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Chemstore - Steel Bund Lining Material:
Bund Retention Volume:
If no give reasons: Tank in operation
Licence Reg. No.: EPA iPPC no. 652 Bund Type (Local/Remote/Com bined/Portable): local
Primary Vessel(s) - Materials of Construction: Steel/plastic Primary Vessel(s) -Total Storage Volume:
Primary VesseI(s) - 110% Volume of Largest Vessel:
Primary Vessel(s) - 25% of Total Storage Volume:
HYDROSTATIC TEST DETAILS:
Qualification: BSc. Environmental Science MfEt
Signed:
BS 8007:1987 IYes/Nol? I
Date: June 2017
FilI Rate Stabilization Period Duration of the Test
Acceptance Criteria (Total permissible drop in water level) Water teve Change in Reference Vessel.
I Date and Time 1 Water Level in Bund I Water tevet in Reference Vessel
VISUAL TEST DETAlw: INSPECTION DESCRWTION & RESULTS: 'he bund is in a good condition..
Result (Pass/Fail) pSS Recommendation(s):
None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING
Site: Pfizer Grange Castle
Bund Ref, No.: 24Trade Effluent Water (North lift station) containment kerb Local
Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete 45m3 Bund Lining Material: Lacquer coating 49.5m3 Bund Retention Volume: 49.5m3 Deemed Practicable / Safe to Conduct Hydrostatic Test? No I f no give reasons: Tank in use
Licence Reg. No.: EPA IPPC no. 652 BundType(Loeal/Remote/Combined/Po~~b~e):
Primary Vessel(s1- Materiafs of Construction: 05TA-87500 Stainless Steel Primary Vessel(s) -Totaf Storage Volume:
Primary Vessel(s) - 110% Volume of Largest Vessel:
Primary Vessel(s) - 25% of Totaf Storage Volume:
~~
HYDROSTATIC TEST DETAICS:
BS 8007:1987 (Yes/NoJ?
Fill Rate Stahilisation Period I Duration of the Test
Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel
Date and Time Water Level in Bund 1 Water Level in Reference Vessel
Description / Comments of Hydrostatic Test: N/A
VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is I good condition and the previously identified remedial works have been undertaken.
Result fPass/Fait) I PASS
Recommendationfs): Power wash bund and remove debris.
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FUR BUND TESTING
Bund Ref. No.: 25 Fire Fighting Foam Bund EPA tPPC no. 652 Bund Type {tocal/Remote/Combined/Portable): Local
Bund Dimensions: L=m; W=m; H=rn
HYDROSTATIC TEST DETAILS:
Primary Vessel($) - Materials of Construction: Steel/ptastic
I BS8007:1987 (Yes/No)? 1
Bund Construction Material: Chernstore Steel
Fill Rate
Stabilisation Period
Primary Vessel(sj -Total Storage Volume:
1 Duration of the Test I 1
Bund Retention Volume:
Acceptance Criteria (Total permissible drop in water
Primary Vessel(s) -25% of Total Storage Volume:
fevsl) Water Level Change in Reference Vessel
Qualification: BSc. Environmental Science MlEl
Signed:
I Date and Time I Water Level in Bund I Water Level in Reference Vessel t
Date: 16'h June 2017
Description / Comments of Hydrostatic Test: N/A
VtSUAL TEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is in good condition
Result (Pass/Fail) IpASs Recommendation(r):
None
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 02-09-2017:03:04:36
RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle Licence Reg. No.:
€PA lPPC no. 652
Bund Retention Volume: 1 Primary Vessel(s) - 25% of Totat Storage Volume:
Bund Lining Material:
Deemed Practicable / Safe to Conduct: HydrostaticTest? No If no give reasons: Bund was locked and not in use on the day of inspection
Primary Vessel(s) - 110% VoIume of Largest Vessel:
HYDROSTATICTEST DETAILS:
Date and Time
BS 8007:1987 (Yes/No)?
fifl Rate
Water Level in Bund Water Level in Reference Vessel
Stabilisation Period I
Qualification: BSc. Environmental Science MlEl
Signed:
Duration of the Test I
Date: 16" June 2017
Acceptance Criteria (Totat permissible drop in water levell Water Level Change in Reference Vessel I
Description / Comments of Hydrostatic Test: N/A
VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is in good condition.
Result (Pass/Fail) PASS Recommendation(s):
None