4
1 BUMWOOENG CO., LTD. BUMWOOENG CO., LTD. 165-2, JANGJI, GUNBUK, HANMAN, KYUNGNAM, KOREA +82-55-580-3800, FAX +82-55-585-0665 http://www.bumwooeng.com/eng/ e-mail : hhs@bumwooeng. com Date of Establishment 1998.06.12 Number of Employee 250 Sales Volume UD$76Mil. ( 2005 ) Quality Management ISO9001, ISO14001,CSEL, ASME‘U,S,U2,PP,N,N3,NA,NPT’ Manufacturing Items BOILER 50 SETS (BASED ON 100 TON/SET) YEARLY CONDENSER 12 SETS (BASED ON 430 TON/SET) YEARLY HEAT EXCHANGER 100 SETS (BASED ON 50 TON/SET) YEARLY HRSG 5 SETS (BASED ON 50 MW) OTHERS VESSEL 100 SETS (10 TON) Major Customer : POSCO, POSCO E&C, KHNP, SIEMENS, MHI, TOSHIBA, KEPCO,DOOSAN, HDEC Reference : Client Project Set Delivery POSCO Boiler for #1 Sintering Heat Recovery Boiler 1 2004.02. 26 Boiler for #2 Sintering Heat Recovery Boiler 1 2003.05. 23 POSCO E&C Boiler for #2-5A CDQ Boiler 1 2007.05. 31 Heat Exchanger for BFG Preheating Sys tem 9 2006.05. 15 KEPCO Condenser for Taean #7,8 Condenser Pa ckage 2 2006.04. 15 Heater for Taean #7,8 Heater Package 2 2006.02. 28 DOOSAN Heater for Boryeong #7,8 Heater 12 2007.05. 15 MHI Condenser & Heater for Rabigh 10 2007.02. 06 2006.03.

Upload: daquan-neal

Post on 30-Dec-2015

41 views

Category:

Documents


0 download

DESCRIPTION

BUMWOOENG CO., LTD. Bumwooeng Item. Bumwooeng Item. Bumwooeng Item. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BUMWOOENG CO., LTD

1

BUMWOOENG CO., LTD. BUMWOOENG CO., LTD. 165-2, JANGJI, GUNBUK, HANMAN, KYUNGNAM, KOREA☎ +82-55-580-3800, FAX +82-55-585-0665http://www.bumwooeng.com/eng/ e-mail : [email protected]

Date of Establishment

1998.06.12

Number of Employee 250

Sales Volume UD$76Mil. ( 2005 )

Quality ManagementISO9001, ISO14001,CSEL, ASME‘U,S,U2,PP,N,N3,NA,NPT’

Manufacturing Items

BOILER 50 SETS (BASED ON 100 TON/SET) YEARLY

CONDENSER 12 SETS (BASED ON 430 TON/SET) YEARLY

HEAT EXCHANGER 100 SETS (BASED ON 50 TON/SET) YEARLY

HRSG 5 SETS (BASED ON 50 MW)

OTHERS VESSEL 100 SETS (10 TON)

Major Customer : POSCO, POSCO E&C, KHNP, SIEMENS, MHI, TOSHIBA, KEPCO,DOOSAN, HDEC

Reference :

Client Project Set Delivery

POSCO

Boiler for #1 Sintering Heat Recovery Boiler 12004.02.2

6

Boiler for #2 Sintering Heat Recovery Boiler 12003.05.2

3

POSCO E&C

Boiler for #2-5A CDQ Boiler 12007.05.3

1

Heat Exchanger for BFG Preheating System 92006.05.1

5

KEPCO

Condenser for Taean #7,8 Condenser Package 22006.04.1

5

Heater for Taean #7,8 Heater Package 22006.02.2

8

DOOSAN Heater for Boryeong #7,8 Heater 122007.05.1

5

MHI Condenser & Heater for Rabigh 102007.02.0

6

SIEMENS Condenser for Al-Ezzel #1&2 22006.03.3