BULUMOUNT-2
AUTOMATIC ELECTRO HYDRAULIC
SPECIMEN MOUNTING EQUIPMENT
BMS Bulut Makina Sanayi Ve Ticaret Ltd. Şti. İkitelli Organize Sanayi Bölgesi Dolapdere Sanayi Sitesi
Ada 4 No :7-9 Başakşehir / İSTANBUL-TURKEY Phone : +90 212 671 02 24 / 671 02 25 Fax : +90 212 671 02 26
web : www.bulutmak.com e-mail : [email protected]
OP
ER
AT
ION
AL
MA
NU
AL
BULUMOUNT-2 Operation
Rev:02 2 / 12 Manual
1.Technical Specifications ........................................................................................................................ 3
1.1.Standart Accessories ....................................................................................................................... 3 2.Main Screen ........................................................................................................................................... 5 3.Part List .................................................................................................................................................. 7 4.Operation ................................................................................................................................................ 7
5.Inserting The Sample And Powder ........................................................................................................ 8 6.Extracting The Mold .............................................................................................................................. 9
BULUMOUNT-2 Operation
Rev:02 3 / 12 Manual
1.Technical Specifications
Machine dimension 45x57x64 cm
Case dimension 65x70x70 cm
Weight (net/gross) 70/100 kg
Mains 220V-50Hz
Mold heater capacity 1250 Watt
Max. Hydraulic system pressure 250 bar
Entering heating, cooling & preheating values
Manual cooling, alarm indicator for cycle completion
Manual rasing and lowering piston by motor when required
Full automatic cycle until sampling finalised
Fast & easy operation for inserting the sample and powder as well as extracting mold
1.1.Standart Accessories Standart mold assembly: 1" - 1,25" - 1,5" - 2" (only 1 mold is standard) Phenolic powder Pipe for water source
!!!FAULT!!!
MANUALY COOLING
HEATING
IF IT APPEARS ON THE SCREEN IT MEANS THERMOCOUPLE IS NOT FUNCTIONING
BAR
Pre-heat °C min.0/max.100
Heating °C min.0/max.300
Cooling °C min.0/max.100
Pressure BAR min.0/max.250
BULUMOUNT-2 Operation
Rev:02 4 / 12 Manual
Fig.1
LOCK NUT ASSEMBLY (1)
HEATER ASSEMBLY (2)
PRESSURE GAUGE (4)
COVER (3)
DIGITAL CONTROL PANEL (5)
BULUMOUNT-2 Operation
Rev:02 5 / 12 Manual
2.Main Screen
NAME OF CYCLING
REMAINING TIME (SEC)
ACTUAL PRESSURE (BAR)
MANUALY COOLLING (ON/OFF )
ACTUAL TEMPERATURE (°C)
SETTED TEMPERATURE VALUE (°C )
START STOP
ENTER WORKING PARAMETERS
RETURN TO PREVIOUS MENU
ACCEPTS VALUE
MAKING TRANSITION AMONG MENUS
MANUEL COOLING START / STOP (MAIN SCREEN)
BUTTON FOR MANUALY RAISING HYDRAULIC CYLINDER
RAM UP
RAM DOWN
BULUMOUNT-2 Operation
Rev:02 6 / 12 Manual
Fig.2
PLUG FOR THERMOCOUPLE (13)
PLUG FOR HEATING UNIT(11)
THERMOCOUPLE CABLE (12)
FUSE (7A) (14)
MAIN WATER COOLANT INLET PIPE (8)
WATER COOLANT PIPE FROM SOLENOID VALVE TO HEATING UNIT(7)
COOLANT PIPE TO DRAINAGE (6)
PLUG FOR MAINS (9)
ON / OFF BUTTON (10)
BUTTON FOR MANUALY LOWERING HYDRAULIC CYLINDER
OIL FILLINIG PLUG (22)
OIL DRAIN PLUG (23)
HEATING UNIT CABLE (24)
WATER PRESSURE SETTING VALVE NOTE: SET TED BY OUR COMPANY , IT IS
RECOMMEND NOT TO CHANGE SETTINGS (19)
SELENOID VALVE (21)
BULUMOUNT-2 Operation
Rev:02 7 / 12 Manual
3.Part List
1)- Temperature : Required temperature setted temp.value (°C) 2)- Waiting time : Waiting time in setted temperature ( min.) 3)- Cooling set : Required cooling setted temp.value (°C) 4)- Pre-heat set : Temperature when machine is on.(°C), but not fonctioned. 5)- Pressure set : Adjustment of max.pressure required (Bar) As of sample, recommended pressure between 150-200 bars , (Max. applicable pressure is 250 Bars)
Entering required values on Digital Panel ( see screens step by step) To temperature adjustment select the temperature set from the main menu.and than push
button. Enter required temperature value (max.200 °C) For example.150.
Push button.. buttons required working parameters reached. For returning
main menu button is used. ON/OFF button for manualy watering.
4.Operation
By turning clockwise and holding up, remove lock nut assembly. (Fig.3)
1 LOCK NUT ASSEMBLY 13 PLUG FOR THERMOCOUPLE
2 HEATER ASSEMBLY 14 FUSE (7A)
3 COVER 15 PHENOLIC POWDER
4 PRESSURE GAUGE 16 UPPER RAM SURFACE
5 DIGITAL CONTROL PANEL 17 SAMPLE
6 COLLANT PIPE TO DRAINAGE 18 LOWER RAM SURFACE
7 WATER COOLANT PIPE FROM SOLENOID VALVE TO HEATING UNIT
19 WATER PRESSURE SETTING VALVE
8 MAIN WATER COOLANT INLET PIPE 20 WATER FILTER
9 PLUG FOR MAINS 21 SELENOID VALVE
10 ON / OFF BUTTON 22 OIL FILLINIG PLUG
11 PLUG FOR HEATING UNIT 23 OIL DRAIN PLUG
12 THERMOCOUPLE CABLE 24 HEATING UNIT CABLE
HEATER ASSEMBLY (2)
LOCK NUT ASSEMBLY (1)
UPPER RAM SURFACE (16)
WATER FILTER (20)
BULUMOUNT-2 Operation
Rev:02 8 / 12 Manual
Fig.3
5.Inserting The Sample And Powder
Push button and raise hydraulic cylinder manualy. and sprey mould relasing agent on the surface of lower ram surface, locate the sample (Fig.4) Lower down hydraulic cylinder manualy by pushing
Fig.4
Fig.5
Put suitable amount of phenolic powder according to sample to be mounted. (Fig.5) And lock lock nut assembly again.(Fig.6)
HEATER ASSEMBLY (2)
LOWER RAM SURFACE (19)
HEATER ASSEMBLY (2)
PHENOLIC POWDER (15)
SAMPLE (18)
BULUMOUNT-2 Operation
Rev:02 9 / 12 Manual
Fig.6
Then START button.Automatic cycling will start and stop when the mounting proces finalised. (Be sure required parameters setted correctly before start to
operation.) If required, you can push button and stop proces.
6.Extracting The Mold
Fig.7 Fig.8
HEATER ASSEMBLY (2)
HEATER ASSEMBLY (2)
LOCK NUT ASSEMBLY (1)
HEATER ASSEMBLY (2)
LOCK NUT ASSEMBLY (1)
BULUMOUNT-2 Operation
Rev:02 10 / 12 Manual
Fig.9
Fig.10
When operation is over, by turning anticlockwise and holding up remove lock nut assembly (Fig.7-8.) NOTICE :While removing lock nut assembly, due to air pressure, this might be difficult. In
this case, push button and you can take them sample and lock nut assembly together easily. (Fig.9 )
IMPORTANT : Pay attention on cleaning residues around of lower and upper rams.Otherwise, it maybe difficult for cylinder when lowering.
Attention ! Hyrdaulic sistem is filled and tested from our company.You do not need to fill any oil . But, if it is required in any case , loosen bolt-( Nr:22-Fig2 ) and fill system with Shell Tellus 37 oil (or similiar). To check the oil level ,loosen bolt.(23),if there is a oil coming out , stop this process.
LOWER RAM SURFACE (18)
SAMPLE (17)
HEATER ASSEMBLY (2)
SAMPLE (17)
BULUMOUNT-2 Operation
Rev:02 11 / 12 Manual
BULUMOUNT-2 Operation
Rev:02 12 / 12 Manual
BEFORE TESTING TESTING AFTER TESTING