Design of General BuildingUtilities for Commercial OfficeBuilding: Water: Raw, Technical, Hot,
Water Treatment Heating: Production,
Distribution, Floor & RadiatorHeating, Mixing Loops Vent.
Cooling: Production,Distribution, Fan Coils, MixingLoops Ventilation.
Cooling: CO2 based Coolingfor Cooling and FreezingRoom inclusive of SafetySystem
Sewage: Normal, Oil, Fat,Biowaste
Ventilation: Comfort, Fire,Smoke Extraction, Kitchen,Parking Area, CO2 Evacuation
Sound: Attenuators, SoundInsulation, Absorption etc.
Electric: Building Installation. Electric: Machinery Inst. e.g.,
MCC’s, UPS-systems,Emergency Generator, SolarPanels etc.
Network: Commercial andTechnical Networks
Gasses; Air, Nitrogen, CO2 Sprinkling: Coordination only Structural Steel: Shaft, Roof
Pictures from DFDS HQ Builtby NCC.
P-Engineering – PlantWare – delivered the coreEngineering Platform for NCC Danmark’s Construction ofDFDS new Head Quarters in Copenhagen build forPensionDanmark.
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=Dxx Structures
Structural Design of
Technical Shafts – Piping Technical Shaft – for
Ducting 3 off. Roof Structures
Both with Platforms and AccessWays and according toEUROCODE and Safetyaccording to fulfill EN 14122 inrelation to Safety, Ball prof Ø20etc.In total 100t of Steel Structure,Platforms and Access Waysdesign for Production at 2different Polish Manufacturer Promostahl made fabrication
preparations from IFC-model NIWA fabricated for Steel
Detailing DrawingsRoof Structures were designwith a Cassette system formounting of Solar Panels onthe ground. Cassette with SolarPanels was hoisted into placewith a two off bolt fixation forspeedy erection.All access Ways, Stairs andLadders were manufacturedaccording to P-EngineeringStandard Drawings.
Picture Legend1. Roof Structure2. Ladder for Access3. Roof Structure4. Roof Structure5. Structures for Tech. Shaft6. Structures for Tech. Shaft7. Hoisting of Shaft Struc.
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=Fxx Water
Design of Water Installationsfrom PID, Sizing andDimensioning to final 3D modeland generation of fabricationdrawings with BoQ (Bill ofQuantities) for items, welding’s,and bolting: Raw Water Soft Water 6°dH with Water
Treatment Soft Water 0°dH with Water
Treatment Osmosis Water with filtering
Unit Hot Tap Water Production
Unit with CirculationDesign of Pipe Specification Insulation Specification Support Structures EN13480 Calculations Insulation Specification Sizing of Pump, Heat
Exchangers/Vessels withHeating Coils
District Heating for Hot Tap Painting Specification Test FAT Schemes/Test Test SAT Schemes/Test Test Paradigms DS3090 Instrumentation – Measuring
and Control Valves Functional Descriptions SCADA Specification
Picture Legend1. Kitchen Manifold2. Booster Unit3. Water Treatment
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=Gxx Sewage System
Design of Water Installationsfrom PID, Sizing andDimensioning to final 3D modeland generation of installationdrawings. Overall design wasmade with P-Engineering’sdatabase application for SizingVentilation, Water and Sewagein one Operation.
Design of: =G11 – Fatty Wastewater =G12 – Biowaste =G21 – Oily Wastewater =G31 – Foundation Drain =G41 – Rainwater – Both
Siphonic and Gravity System =G42 – Drain System –
Condensate from Fan Coils,Drains in Shafts etc.
=G51 – Wastewater
For the above system: MCC and Electric Design for
Pump Wells etc. includingCable Project.
Instrumentation – Roof,Balconies, and various PumpWells.
Heat Trace for Fatty Waste Special Pharma Grade Piping
for Kitchen where onlylimited Slope were available(Office floor)
Test SAT Schemes / Test Test Paradigms DS3090
Picture Legend1. Unitized Toilet Installations2. Welded prefabricated
Rainwater Main.3. Biowaste tank in slim fit.4. Roof Drain Well
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=H0x Heating
Design of Heating Installationsfrom PID, Sizing andDimensioning to final 3D modeland generation of fabricationdrawings like Steel Detailingand Pipe Isometrics with BoQfor items, welding’s, andbolting:
Pipe Specification EN13480 Calculations Pipe Design and Sizing Flow Calculations Insulation Specification Sizing of Pump and Heat
Exchangers. District Heating Central Heating – Production
and Circulation Unit Distribution with dynamic
Hydraulic Balancing of Flow. Radiator Systems Mixing Loops for Floor
Heating Floor Heating Mixing Loops for Ventilation
Heating Support Structures Painting Specification Test FAT Schemes/Test Test SAT Schemes/Test Test Paradigms DS3090 Instrumentation – Measuring
and Control Valves Functional Descriptions SCADA Specification
Picture Legend1. Central Heating Unit 3D2. Central Heating in reality3. Expansion and Make-up4. Main Shaft with Piping
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=H1x Cooling
Design of Cooling Installationsfrom PID, Sizing andDimensioning to final 3D modeland generation of fabricationdrawings like Steel Detailingand Pipe Isometrics with BoQ(Bill of Quantities) for items,welding’s, and bolting:
Pipe Specification EN13480 Calculations Insulation Specification Sizing of Pump, Buffer
Vessels, De-aeration Flow Calculations Insulation Specification Chiller w. Natural Cooling –
Specification and Purchase Vibration Dampers and
Flexible Joints for Noise/Vib.Reduction to adjacent struc.
Central Cooling – Productionand Circulation
Fan Coils Systems forNetwork and Server Rooms
Mixing Loops for VentilationHeating
Support Structures Painting Specification Test FAT Schemes/Test Test SAT Schemes/Test Test Paradigms DS3090 Instrumentation – Measu-
ring and Control Valves Functional Descriptions SCADA Specification
Picture Legend1. Circulation Unit 3D2. Mixing Loop3. Fan Coil Installation4. Pipe at Chiller5. Buffer tank
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=Jxx Ventilation
Design of Ventilation Comfort Parking – General, Fumes
and Smoke Extraction Process (Kitchen Smoke Extractionfrom PID, Inlet armaturesquantities/placement, Sizingand Dimensioning to final 3Dmodel and generation offabrication drawings: Duct Specification Insulation Specification AHU – Specification Overall Design: Control and
Operation Strategy Distribution Ducting Sizing
and 3D layout Flow Calculation Ventilation VAV and CAV
Armature Selection andArrangement
Auditorium DisplacementVenting Solution
VAV Dampers Smoke Control Dampers Fire Dampers Smoke Dampers Sound Attenuators and
Sound Calculation Instrumentation Functional Descriptions SCADA Specification Test SAT Test Paradigm DS3090
Picture Legend1. AHU Arrangement on roof2. Distribution on office3. Large Duct 2400x12004. Erection of Heat Exchanger5. Shaft Arrangement of Ducts6. Ventilation Garbage Room7. CFD of Auditorium
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=K0x Electrical
Design of Electrical Installationfor these areas:
=K02 – Solar Panels =K02 – Emergency
Generator =K04 – MCC =K06 – Machinery
Installations =K07 – UPS for Office
Installations =K08 – UPS for BMS
Design included:
MCC-Design with MotorBreakers, VSD, Network etc.
PDB-Specification Cable Sizing & Specification Power Distribution for BMS
system Power Distribution for
Industrial Kitchen, Prep.Kitchen, Cafes, HC-lifts etc.
Emergency Generator –Coordination and Design ofadditional Casing withInsulation and Air Supply toreduce Power Consumptionfor Maintaining OilTemperature.
Soler Panel Installation in 4sections with 4 offConverters.
Picture Legend1. Solar Panels on roof2. Cabling of MCC Panel3. Converters for Solar Panels
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=L0x Automation
BMSInstead of traditional CTS theBMS system for DFDS NewHeadquarter was design basedon Rockwell PLC system andRockwell SCADA. Data storageand handling was performed byRockwell Historian Solution.
Work Scope was
General Specification Definition of SCADA pictures Functional Descriptions of all
Operations. Definition of Historian
Storage, Reports etc.
Access Control & IntrusionAlarmDK: ADK and AIA
Specification of
Boundary Safety accordingto Insurance Class
Staff and Guest access androuting throughout thebuilding
Specification of System Access outside office hours IT-network Server Solution Power Supply Integration with Automatic
Door System Picture Legend1. Remote I/O Cabinet
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=Mxx Communication
Various CommunicationSystems:
=M11 – Office Network withBackbone redundancy etc.)
=M21 – Network BMS =M31 – Network Safety =M51 – DAS =M61 – ITV/CTV System =M62 – Analogue Systems =M91 – TV Antenna System
NetworkThe =M21 and =M31 Networkwas setup as IndustrialNetwork with Rockwell StratixSwitches and Network loopConnections overall and in forexample MCCs.
SurveillanceITV/CTV with IP camerassupplemented for allSurveillance within Securityboundary. Supplemented withAnalogue outdoor Cameras andIntercom Systems. AnaloguesSystem with Coax Cabling waschosen for safety reasons asthese are hacking resistant.
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=Nxx Transport Systems
Various Transportation System
=N11 – Elevators =N21 – HC Lifts =N31 – Elevator Lift =N61 – Service Trolley for
Solar Panel Washing.
ElevatorsCoordination for installation forWifi and DAS. Equi-PotentialBonding between Elevator andSteel reinforcement inConcrete.
LiftsSpecification, Purchase,Coordination and ErectionSupervision. Integration withAccess Control System.
Elevator LiftsSmall Lifts for access StorageRooms. Specification, Purchase,Coordination and Supervision.
Service TrolleyDetailed Design of a ServiceTrolley for washing of the SolarPanels on top of the GeneralTechnical Installations on topof the roof. The Trolley hadStorage Room for OsmosisTreated Water and adistribution pump for Washing.
Note: Above was abandoned after I left theproject.
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
=Pxx Safety System
Various Safety System such as
Smoke Extraction Fire Ventilation CO2 Extraction System CO2 Monitoring System
Smoke ExtractionSmoke Extraction SystemThe building had bothdesignated Smoke ExtractionSystem as well as combinedsystems where the SmokeExtraction was built onto theoverall Ventilation System.
Fire VentilationFire Ventilation is a SpecialistSupply and for this part onlySpecification, Procurement andInstallation was executed.
CO2 WarningThe are general CO2 monitoringin the building for IndoorClimate Control. However, CO2Warning System as placed in allrooms where the piping for theCO2 based cooling for Freezersand cooled Storage Room.
CO2 ExtractionExtraction for the CO2Compressor Machinery Room
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
Kitchens
Design and Coordination withboth Client and End User for
Production Kitchen Cafes Prep. Kitchen
Coordination of all
Floor Drains – Standard Floor Drains – for Tilting
Pans and Pots Water Supply Extraction Hoods Electrical Supply Kitchen Equipment
o Owen, Foodo Owen, Bakeryo Panso Pots
Cooling with central CO2compressor for
o Freezing Roomo Refrigerated Roomso Refrigerated Room for
Bakery Miscellaneous Machinery
o Potato Peelero Waste Grinder
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Com
mer
cial
Bui
ldin
gs U
tility
R-33
0 Re
fere
nce
Auditorium
Design of multi-purposeauditorium where usage variesfrom
Sports – Floor Ball Banquets – with 100
persons Presenter – with 350
persons
To accommodate the differentusage of the room with variableperson load displacementventilation was chosen.Furthermore, Heat Energy from10kW Monitor Wall and 20kWStereo Amplifiers.
Furthermore, the IndoorClimate Specification for theaudiences’ experience oftemperature variations, draughtetc. was quite demanding.
Temperature
Velocity
P-EngineeringGyden 6, DK-5970 Ærøskøbingwww.p-engineering.dk R-330; Rev.01 2021-07-08 / CP
Contact Information:Christian Pallesen;+45 2526 8805;[email protected]
More information on websitehttps://p-engineering.dk