building the future on a foundation of excellence

21
BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

Upload: others

Post on 27-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

Page 2: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

ABOUT US

• Established in year 1995 at Baramati, District Pune.

• More than 25 Years of Experience in all type of Civil

work like Industrial Infra, Road Construction, RCC

Construction.

• Worked For Industries, PWD, Irrigation, Maharashtra

State Warehouse Dept.

• We Have 20 Competent Team Members having work

experience of more than 10 Yrs.

• As well as highly skilled & efcient contract teams.

• In house construction machinery.

01

Sunil BhosaleFounderB.E

Viraj BhosaleDirector BusinessB.E & MBA

Harshwardhan BhosaleDirector Project ExecutionM.E Civil

Page 3: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

AREAS OF BUSINESS

INDUSTRIAL CIVIL & PEB WORK

GOVERNMENT PROJECTS

ROADS & BRIDGES

TELECOM INFRASTRUCTURE

RESIDENTIAL DEVELOPER

02

Page 4: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

MISSION

Ÿ To deliver sustainable & cost effective

infrastructure solution.

Ÿ To Encourage Innovation, Team Work,

Professional Integrity, Commitment,

Upgradation of knowledge & Employee

skills under Safe working environment.

Ÿ To be responsible corporate citizen

committed to the social cause.

03

Ÿ To Become Top 10 Industrial Infra

Company by 2030.

Ÿ Achieve Turnover of Rs.100 Cr. By

2030.

GOAL

Page 5: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

BRIEF ABOUT PEB STRUCTURE

Ÿ Pre Engineered Buildings (PEB) are the buildings

which are engineered at a factory and assembled at

site.

Ÿ Usually PEBs are steel structures. Built-up sections

are fabricated at the factory to exact size,

transported to site and assembled at site with bolted

connections.

Ÿ This type of Structural Concept is generally used to

build Industrial Buildings, Metro Stations,

Warehouses etc.

04

Page 6: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

ADVANTAGES OF PEB STRUCTURES

Quality Control is the main

advantage as all the structural

member are engineered

beforehand, standards of

different codes also taken into

consideration & these

components are made in

factory under the supervision

of Quality Control Engineer.

05

QUALITY CONTROL

Lower cost due to the saving

in design, manufacturing and

on site erection cost.

LOWER COST

Low Maintenance due to use of

standard quality of paints over

steel members, which increases

the ability to withstand &

nally the maintenance cost

will be low as compare to

conventional steel building.

LOW MAINTENANCE

Minimizing time of

construction, as all the

members are Pre Manufactured

& skilled labor is used for

connections of different

components.

MINIMIZING TIME OF CONSTRUCTION

`

Page 7: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

BENEFITS OF PEB SHED STRUCTURE

06

Completely Air - Tight,

These Sheds have Heat

Insulated Walls

regulating temperature.

These are Acclaimed for

their Highly Robust

Designs.

Mobility, The Sheds are

Easy to Assemble &

Dis-Assemble.

Weather Proof

Structures.

Easy to Customize on

Various Specications

According to the Site

Requirements.

Warranty on PEB,

mostly warranty period

of 20 years given by

manufactures for PEB.

AIR - TIGHT HIGHLY ROBUST DESIGNS

MOBILITY WEATHER PROOF

EASY TO CUSTOMIZE

WARRANTY ON PEB

Page 8: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

PROJECTS COMPLETED IN LAST 3 YRS

07

Project : Filtrum Separation Solution Pvt Ltd.

Location : Wai MIDC, Maharashtra

Area : 5,000 SqFt.

Category : Automotive Filters

Project : Filtrum Seperation Solution Pvt Ltd

Location : Wai MIDC, Maharashtra

Area : 15,000 SqFt.

Category : Automotive Filters

Project : Trimix Flooring Construction

Location : Wai MIDC, Maharashtra

Area : 15,000 Sq.ft

Category : Automotive Filters

Page 9: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

INDUSTRIAL, CIVIL & PEB

Project Name - Jubiliant Plant

Location - Nira, Maharashtra

Area - 15,000 SqFt.

08

Page 10: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

PROJECTS

09PEB Shed During Construction

Trimix Flooring Construction

Page 11: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

SUCCESS STORY

10

CHALLENGE

Ÿ Work location was critical for material movement so no disturbance was allowed

Ÿ Running plant with 3 shifts more than 300 labours so safety challenge

Ÿ Diwali Holidays so challenge of labour availability.

Ÿ Prolonged rainy season causing work delays.

Ÿ Locals nuisance

5,000 sq.ft of Shed Extension & Trimix Flooring of 5000 sq.ft. had to be done within 15 working days.

SOLUTION

Ÿ Constructed temporary ramp & alternative route for material movement

Ÿ Worked in 2 shifts to overcome labour shortage problem

Ÿ Locals issue mitigated after discussion & making them part of the project

RESULTS

Ÿ Completed work on 14th Day it self

Ÿ Company awarded another big project of 15000 sq.ft

Page 12: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

11

Project : Fleetguard Filters Pvt. Ltd.Completed in only 25 days

Location : Nandur, Pune, Maharashtra

Area : Trimix Flooring 5,000 sqft

Category : PEB Shed Extension

Page 13: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

12

Project : Garware Bestrecth

Location : Wai MIDC, Maharashtra

Area : 26,000 Sq.ft

Category : Healthcare - PEB Shed with Civil Work

Project : Vishal Nazirkar

Location : Jejuri MIDC, Maharashtra

Area : 40,000 Sq.ft.

Category : Warehouse

Project : Ameya Industires

Location : Baramati, Maharashtra

Area : 9,000 Sq.ft

Category : Solar Energy

1

2

Page 14: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

13

Project : Unique Papers

Location : Chakan MIDC, Maharashtra

Area : 21,000 Sq.ft

Category : Paper Industry

Project : Industrial Warehouse - Mr. Anil Kate

Location : Chakan, Pune, Maharashtra

Area : 30,000 Sq.ft.

Category : Warehouse

1

2

Project : Someshwar Sugar Factory

Location : Baramati, Maharashtra

Capacity : 1 lac Ltrs.

Category : Sugar Industry

Page 15: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

14

1ONGOING PROJECT

Project : Khodiyar Industries

Location : Wai, MIDC, Maharashtra

Area : 15,000 Sq.ft

Category : PET Bottles Manufacturer

Page 16: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

OWNEDMACHINERY

15Backhoe LoadersCompactors Excavators Concrete Mixers Tractors

Page 17: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

COMMITMENT TO QUALITY

16

Environmental responsibility can be integrated

with business priorities to ensure the

protection of environmental concerns whilst

simultaneously ensuring protability.

VIRAJ CONSTRUCTION works conscientiously

towards reducing the burden placed on the

environment

Page 18: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

HEALTH, SAFETY& ENVIRONMENT

17

We have maintained an exemplary record

for health and safety. All employees at

VIRAJ CONSTRUCTION receive the latest in

levels of training for safety, health,

support and resources that are required to

meet our objectives, thereby ensuring a

safe healthy and productive working

environment.

Page 19: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

GIVES

18

Page 20: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

SPECIFIC ASK

19

Page 21: BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE

REGISTERED &BRANCH OFFICE

Registered Ofce:

Wanewadi, Someshwar Nagar, Baramati, Pune - 412306 Maharashtra

Branch Ofce:

Continental Chambers, ofce 18, Karve Road, Pune - 411004 Maharashtra

Email: [email protected]

Contact:

Phone: 02112 282128

Mob: +91 9623232727 | +91 9503905045 | +91 9545554477

Clic

kme

dia

- 8

83

0 7

98

70

8