Building Seismic Safety Council Provisions Update Committee
Seismic Performance Objectives
James Harris BSSC Colloquium February 11, 2015
![Page 2: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/2.jpg)
Current Performance Objectives
1. “…structures will have a suitably low likelihood of collapse in…the MCE ground motion
2. “…life threatening damage, primarily from failure of nonstructural elements in and on structures, will be unlikely in an unusual but less rare ground motion…the design earthquake ground motion
From the current commentary on Importance factor and occupancy categories
Building Seismic Safety Council Seismic Performance Objectives 2
![Page 3: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/3.jpg)
Current Performance Objectives
Building Seismic Safety Council Seismic Performance Objectives
3
![Page 4: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/4.jpg)
History on Objectives
• Early basis: emulate buildings that succeeded in strong earthquakes; avoid features associated with failures
• SEAOC Blue Book: – Damage, but not collapse in major EQ – Damage, repairable, in moderate EQ – No significant damage in minor EQ
• UBC: zones added to extend applicability elsewhere
Building Seismic Safety Council Seismic Performance Objectives 4
![Page 5: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/5.jpg)
History on Objectives
• Nuclear Industry: – Maximum Credible Earthquake – Safe
Shutdown – Operating Basis Earthquake
• San Fernando Earthquake of 1971: performance of hospitals was an issue
• SEAOC/UBC added an Importance Factor, which increased design accelerations by 50%
Building Seismic Safety Council Seismic Performance Objectives 5
![Page 6: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/6.jpg)
History on Objectives, cont’d
• ATC 3 (1978): – Provide life safety in ground motion with 10%
chance in 50 years (500 year mri) – Importance Factor on design acceleration
disappeared – Better performance for essential facilities
through smaller limits on drift – Concepts took time to get into standards and
building codes (e.g., ASCE 7 – 1993) Building Seismic Safety Council Seismic Performance Objectives 6
![Page 7: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/7.jpg)
History on Objectives, cont’d
• NEHRP Project ’97: – new maps to fit new criterion: low likelihood of
collapse in MCE .=. 2% chance in 50 year (2500 year mri, assumed margin > 1.5), with a defined deterministic cap
– Importance factor re-introduced, but formatted as a control on damage (i.e. R factor was divided by the I factor to reduce inelastic deformation); result similar to original I factor
Building Seismic Safety Council Seismic Performance Objectives 7
![Page 8: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/8.jpg)
History on Objectives, cont’d
• ATC 63: FEMA P695: “low likelihood” defined to be 10% chance of collapse given MCE GM when computed under prescribed methods
• Developed for the purpose of validating seismic design parameters, particularly the response modification, or R, factor
Building Seismic Safety Council Seismic Performance Objectives 8
![Page 9: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/9.jpg)
History on Objectives, cont’d
• NEHRP Project ’07: – “low likelihood” of collapse further defined to
mean 1% chance of collapse due to EQ GM in 50 years (but not in areas with deterministic cap on the ground motions)
– 10% chance of collapse given occurrence of MCE maintained, but when coupled with the prior criterion, the result is a “risk-targeted” ground motion. The annual probability of exceedence varies from place to place
Building Seismic Safety Council Seismic Performance Objectives 9
![Page 10: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/10.jpg)
Status in 2009 Provisions • We do have a quantitative objective
regarding collapse of ordinary buildings 1%* chance in 50 years
• We have design provisions that deliver a smaller risk for more important structures through the importance factor
I = 1.5 for essential facilities • We have an unquantified functionality
objective for essential facilities Building Seismic Safety Council Seismic Performance Objectives 10
![Page 11: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/11.jpg)
Stated and Implied Quantification
• Risk to Collapse – Category II: 10% given MCER, 1%* in 50 years
– Category III: ~5% given MCER, ~0.5%* in 50 years
– Category IV: ~2.5% given MCER, ~0.25%* in 50 years
Building Seismic Safety Council Seismic Performance Objectives 11
• Number of people at risk is the basis for the Risk Category:
![Page 12: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/12.jpg)
Structural Safety for Other Loadings
• Reliability approaches for structural engineering began development in 1950’s
• 1979 report NBS SP 577 led to LRFD – 1982 ANSI A58.1 – 1986 AISC LRFD – …many others
• Calibrated to historical designs, for which there was (general) acceptance for safety
Building Seismic Safety Council Seismic Performance Objectives 12
![Page 13: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/13.jpg)
Structural Safety, cont’d
• First Order, Second Moment approach: a simple representation of variability in loads, load effects, and capacities – Safety index, β
• Tied to performance of members within a structure, not exactly the structure as a whole
Building Seismic Safety Council Seismic Performance Objectives 13
![Page 14: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/14.jpg)
Structural Safety
• Correlation with other loadings – Seismic 1%* chance of collapse in 50 years – Gravity 0.1% (+) chance of member failure in
50 years (Wind may be higher) • Difference between member and system
limit states – Series versus parallel operation – Differing consequences of the limit state
Building Seismic Safety Council Seismic Performance Objectives 14
![Page 15: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/15.jpg)
Safety Performance Objectives
• The difference in risk between high hazard seismic and other loads is not irrational:
COST MATTERS • Typical premium 0.5% to 3% of cost of
construction in moderately high risk area • There is no real basis for a difference in
risk in lower hazard areas where the cost premium is not particularly high
Building Seismic Safety Council Seismic Performance Objectives 15
![Page 16: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/16.jpg)
Functional Objectives
• Longstanding qualitative objective for essential facilities: the fundamental question is at what level of ground motion?
• ATC 84 gives the framework for defining a Functional Level Earthquake Ground Motion, on a risk targeted basis (FLER)
Building Seismic Safety Council Seismic Performance Objectives 16
![Page 17: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/17.jpg)
Functional Objectives • Example 1, set a 10% chance of loss of function
in 50 years for ordinary buildings and define FLER as the motion giving the conditional probability of 10%, then ground motion mri ~200 years, and current importance factor would imply about 5% chance for loss of function in 50 years for essential facilities.
• Example 2, set 5% chance in 50 years and 10% chance of loss of function given FLER for essential facility results in about 400 for g.m. mri Building Seismic Safety Council Seismic Performance Objectives 17
![Page 18: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/18.jpg)
Functional Objectives
• Basic Issues: – What does society expect for various risk
categories of structures? – What are we getting with current indirect
procedures? • Structural (I factor and drift limits) • Nonstructural (IP and RP factors on 2/3 MCER)
– What are cost increments for changes in target levels of performance?
Building Seismic Safety Council Seismic Performance Objectives 18
![Page 19: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/19.jpg)
Economic Loss
• Exceptionally important to individuals and society as a whole
• Not really a stated target for our standards (saving lives in two ways is all we are aiming for at this time – but could eventually offer guidelines – for example linear behavior at a Service Level Earthquake Ground Motion, SLE)
Building Seismic Safety Council Seismic Performance Objectives 19
![Page 20: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/20.jpg)
Purpose, 2009 Edition
…The intent of these Provisions is to provide reasonable assurance of seismic performance that will 1. Avoid serious injury and loss of life 2. Avoid loss of function in critical facilities 3. Minimize structural and nonstructural
repair costs where practical to do so These objectives are addressed… Building Seismic Safety Council Seismic Performance Objectives 20
![Page 21: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/21.jpg)
Relevant Efforts for 2015
1. Clarify and quantify performance objectives
2. Rationalize and improve use of Seismic Design Categories
3. Rationalize and improve use of height limits
Building Seismic Safety Council Seismic Performance Objectives 21
![Page 22: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/22.jpg)
Clarification, and a Change
1. Avoid serious injury and life loss due to – Structure collapse – Failure of nonstructural components or systems – Release of hazardous materials
2. Preserve means of egress 3. Avoid loss of function in critical facilities 4. Reduce … repair costs where practicable Building Seismic Safety Council Seismic Performance Objectives 22
![Page 23: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/23.jpg)
Clarification and Quantification
• These performance objectives do not all have the same likelihood of being achieved.
• The basic collapse prevention objective is partially quantified; but the others are not.
Building Seismic Safety Council Seismic Performance Objectives 23
![Page 24: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/24.jpg)
Quantification of Objectives
• Starting basis implicit in the maps in ASCE 7-10: For Risk Category II – 10% risk of collapse given MCE motion AND – 1% risk of collapse in 50 years, with
deterministic hat • Basic Desire: confirm Risk Category II
objective and develop consistent objectives for other risk categories
Building Seismic Safety Council Seismic Performance Objectives 24
![Page 25: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/25.jpg)
Building Seismic Safety Council Seismic Performance Objectives
Selected Hazard Curves
0.001
0.01
0.1
1
10
1.00E+00 1.00E+01 1.00E+02 1.00E+03 1.00E+04 1.00E+05 1.00E+06
Spec
tral
Acc
eler
atio
n, S
s
Mean reccurence interval
San Francisco Memphis Minneapolis MCE DBESign Wood apartment Big Box Parking garage
25
Spectral Acceleration threshold
![Page 26: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/26.jpg)
Generic Fragilities
Building Seismic Safety Council Seismic Performance Objectives
26
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0.0000 1.0000 2.0000 3.0000 4.0000 5.0000 6.0000 7.0000 8.0000 9.0000 10.0000
Prob
abili
ty o
f fai
lure
Strength normalized at 10% chance of failure
20%
40%
60%
80%
![Page 27: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/27.jpg)
Quantification Is Controversial • Some dissatisfaction with deterministic hat • Some dissatisfaction with risk targeted
ground motions, i.e. some prefer ground motions at a single point on hazard curve
• Some dissatisfaction with 1%/50 year, especially where hazard is low
• Some prefer use of DE in lieu of MCE • Achieved consensus to confirm and state
the basic anchor point Building Seismic Safety Council Seismic Performance Objectives 27
![Page 28: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/28.jpg)
Extension to other Risk Categories: Structural Collapse Safety
• Basic approach, stay with the MCE, and stay with the current importance factors, then define what we get, or define what we want and adjust importance factors
• FEMA P695 provides the basis for R factors
RC Probability Ie factor I 20% 0.8 II 10% 1 III 5% 1.25 IV 2.5% 1.5
Building Seismic Safety Council Seismic Performance Objectives 28
• ATC 84 provides the methodology to adjust Ie factors to achieve the objectives
• This is also somewhat controversial
![Page 29: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/29.jpg)
Nonstructural Components/Systems • Prevent failures that endanger life at the
design earthquake (which is two-thirds of the MCER)
• Cannot quantify a probability of success: – Inadequate knowledge of fragilities – Inadequate knowledge of demand given a
ground motion – Design gm not at a consistent probability
• Component Importance factor adjusts level of safety
Building Seismic Safety Council Seismic Performance Objectives 29
![Page 30: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/30.jpg)
Release of Hazardous Materials
• Prevent failures of structure or of nonstructural components/systems that would release unacceptable quantities…
• No explicitly quantitative criterion is stated, although importance factors on the structure and on nonstructural components is used as they are for the structural collapse objective
Building Seismic Safety Council Seismic Performance Objectives 30
![Page 31: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/31.jpg)
Preservation of Egress
• Stairs…shall be functional following the DE ground motion
• No quantified performance criterion; component importance factor applies for some types of stairs
• Newly stated objective
Building Seismic Safety Council Seismic Performance Objectives 31
![Page 32: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/32.jpg)
Functionality of Critical Facilities
• …Avoid earthquake-induced loss of functionality for Risk Category IV strctures and some nonbuilidng Risk Category III nonbuilding structures
• Also don’t have a quantified performance criterion here; recent work casts doubt that we achieve this at the DE ground motion, although many would like to achieve that
Building Seismic Safety Council Seismic Performance Objectives 32
![Page 33: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/33.jpg)
Repair Costs
• ASCE 7 aims primarily at nonstructural elements for which seismic anchorage and bracing are both low cost and effective in reducing economic loss
• Some material design standards have provisions that are based upon this idea, but for structural elements (e.g. ACI 318)
Building Seismic Safety Council Seismic Performance Objectives 33
![Page 34: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/34.jpg)
Framework from ATC 84
Building Seismic Safety Council Seismic Performance Objectives
34
![Page 35: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/35.jpg)
Objectives: Bottom Line
• Update to purpose has passed • “Part 3” paper also has passed
– Includes validation or tune-up of the importance factors with appropriate commentary
– Describes possible functionality criteria for RC IV (ground motion, drift most likely)
– Describes how a new ground motion hazard level could be used to check economic loss
Building Seismic Safety Council Seismic Performance Objectives 35
![Page 36: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/36.jpg)
Building Seismic Safety Council Seismic Performance Objectives 36
![Page 37: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/37.jpg)
Possible Future Simplification to 3 Design Categories
3 Categories would be: 1. Ignore seismic design 2. Transition category: SFRS strength
provides control on area damaged by very rare event; use risk-based ground motion as default. Control worst killers.
3. Basic seismic design: our current Category D criteria, based on risk = 1% in 50 years where MCER SS/S1 > 1.5/0.9
Building Seismic Safety Council Seismic Performance Objectives 37
![Page 38: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/38.jpg)
Seismic Design Category 1 of 3 • No seismic requirements • Threshold similar to current (depending on
Risk Category); basis would be that risk is no higher than for other design loads – Approximately 0.1% probability of structural
failure in 50 years is target – Use equivalence to MMI as surrogate for now;
don’t have enough data on performance to be more precise yet
Building Seismic Safety Council Seismic Performance Objectives 38
![Page 39: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/39.jpg)
Seismic Design Category 1 of 3
• Threshold of ground motion (for ordinary risk category) could be something like this: MCE about 1/3 of MMI VIII, or roughly MMI VI. This could/should raise the cutoff somewhat from the present
• For higher Risk Categories, could adjust by our Ie factor, provided we accept rationale for Ie factors
Building Seismic Safety Council Seismic Performance Objectives 39
![Page 40: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/40.jpg)
Seismic Design Category 2 of 3 • Basic structural frame strength based
upon probabilistic ground motions
• Use R factors validated for SDC 3 (this will likely provide some conservatism)
• Nonstructural very bare bones; really only the proven life safety concerns (this is likely to change at higher Risk Categories)
Building Seismic Safety Council Seismic Performance Objectives 40
![Page 41: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/41.jpg)
Seismic Design Category 2 of 3
• Raise the threshold at the high end; consider the high end of current C
• Therefore do a better job of controlling the worst of the proven killers than we currently do in SDC B: weak stories, unreinforced masonry, weak/brittle connections in the main load path, perhaps a few others
Building Seismic Safety Council Seismic Performance Objectives 41
![Page 42: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/42.jpg)
Seismic Design Category 3 of 3
• Fundamentally the same as current seismic design category D – Need to decide what to do with the near fault
provisions – are they general or only imposed at extreme motions?
– Life safety for nonstructural similar scope to current, however, will probably need to scale for MCE
Building Seismic Safety Council Seismic Performance Objectives 42
![Page 43: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/43.jpg)
Possible Boundaries
Seismic Design Category SMS / I* SM1 / I* 1 – basic structural integrity
upper boundary 0.3-0.4 (0.25) 0.1 (0.1) 2 – similar to current “B”
upper boundary 0.8 (0.5/0.75) 0.3 (0.2/0.3) 3 – similar to current “D”
Building Seismic Safety Council Seismic Performance Objectives 43
Notes: • 1 to 2 boundary probably at higher motion than current A to B • 2 to 3 boundary close to current C to D • SM1 to SMS ratio not a constant • Values here are NOT COMMITTEE CONSENSUS!!!
![Page 44: Building Seismic Safety Council Provisions Update ... · Provisions Update Committee Seismic Performance Objectives ... • SEAOC/UBC added an Importance ... Ignore seismic design](https://reader034.vdocuments.mx/reader034/viewer/2022051407/5ae9fe037f8b9ac3618d23ac/html5/thumbnails/44.jpg)
Future Work on Design Categories
• Committee records could provide the starting point for future discussion
• Tabulation of current step functions and how they would be treated under the new proposal will be archived in committee records
• Would need to include adjustment of current exclusions and height limits to fit
Building Seismic Safety Council Seismic Performance Objectives 44