Documenting your build process By MItchell Banks

Upload: mitchellbanks12

Post on 12-Aug-2015

141 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Building Process For WakeBoard

Documenting your build process

By MItchell Banks

Page 2: Building Process For WakeBoard

Step 1Creating The Mock-up

You need the mock-up to be 50.8 cm wide

And the leant needs to be 113

Page 3: Building Process For WakeBoard

Step 2

You will need a 3 cm lift from the centre of the board

Page 4: Building Process For WakeBoard

Step 3

Then you wont to start sanding it into a ovule shape but still keeping the 3 cm lift at the ends of the board.

Page 5: Building Process For WakeBoard

Step 4 Last StepAt last we need to put a clear

coat on it called lacquer this will prevent water

getting into the board and water

logging it.