Page 1: BUILDING INFORMATION MODELING (BIM) - FROM …software, Building Information Modeling (BIM) is a new way of working, with a colla-borative approach, for all the stakeholders involved

www.bg-21.com ■ INGENIOUS SOLUTIONS

BUILDING INFORMATION MODELING (BIM) - FROM MODELING TOMANAGEMENT

Pub

lishe

r: B

G C

onsu

ltin

g E

ngin

eers

, Com

mun

icat

ion

Dep

artm

ent,

Feb

ruar

y 20

18

Page 2: BUILDING INFORMATION MODELING (BIM) - FROM …software, Building Information Modeling (BIM) is a new way of working, with a colla-borative approach, for all the stakeholders involved

1

A NEW WORK METHODMore than a jargon and an engineering software, Building Information Modeling (BIM) is a new way of working, with a colla-borative approach, for all the stakeholders involved in a construction project. It is cen-tered on a 3D digital model with embedded data, which serves as a database for the work project and grows with different levels of refinement as the project evolves. If well conceived, the model can be a precious tool that provides great added value for the whole project life cycle, from the initial de-sign to demolition.

THE ADDED VALUE OF BIMBIM project design, articulated around a single, centralized and collaborative data-base, allows an excellent visualization of the project at all stages, integrating all the disci-plines involved and the different layers of the project (architecture, structure, networks, external providers, etc.). Thanks to the infor-mation attributed to each graphic element, this model can be explored intelligently to perform, for example, the following tasks:

■ Project communication ■ Conflict detection and resolution■ Dynamic generation of drawings and de-

tailing schedules■ Numerical modeling■ Work phasing■ "As-built” information■ Facility management

The possible applications of the model are countless and they will continue to evolve throughout the life cycle of the work project, provided that the model is appropriately designed, up to date and usable.

For this reason, careful management of mo-del creation, from the very start of the pro-ject, is essential. For a model development during a project design phase, the coordina-tion between design team, contractors and suppliers must be directed by a specialist. Lastly, the model with embedded data must "live" in alignment with the progress of the work project, and this requires periodic updating of the model.

ONGOING EVOLUTION The BIM world, at the leading edge of the in-dustry, is very dynamic and constantly evol-ving. The regulatory and legal frameworks, as well as the approach, vary greatly depending on the country and language. Moreover, the information available on BIM is abundant and sometimes contradictory. BG perma-nently monitors the regulatory and legal framework in the markets where the Group is active, with the aim of standardising methods, organising information exchange and promoting collaboration and best prac-tice around BIM.

Because of this constant evolution, a Project Owner needs to be able to count on expert advice when implementing BIM on a pro-ject, so as to ensure that the model created is adapted to his needs and maximizes the return on investment.

BG'S EXPERTISE AT YOUR SERVICEBy virtue of its experience in the BIM field, its solid establishment in different linguis-tic regions with distinct design traditions, its international activity with large construction groups and its excellent references in nume-rous types of project, the BG Group is your ideal partner for successful BIM implemen-tation.

THE BG GROUP'SBIM EXPERTISE

MULTI - DISCIPLINARY EXPERIENCE■ Civil Engineering■ Infrastructure■ Construction■ HVAC■ Sanitary installations■ Special fluids■ Process■ Electricity■ Security■ Electromechanical installations■ Environment■ Energy

BIM CONSULTING SERVICES■ BIM Management■ BIM Implementation■ Project BIM documents■ BIM design■ Virtualisation of existing assets■ Land and site modeling■ Simulations■ Functional analyses■ Project team coordination■ General planning■ Data maintenance■ GIS/ BIM convergence■ Project advice■ Consulting■ Training

CUTTING EDGE KNOW-HOW FOR SUCCESSFUL IMPLEMENTATIONA pioneer in Building Information Modeling (BIM) in its fields of expertise, the BG Group has the knowledge and ex-perience to assist you in the well-reasoned implementation of this work method in order to maximise its added value.

Page 3: BUILDING INFORMATION MODELING (BIM) - FROM …software, Building Information Modeling (BIM) is a new way of working, with a colla-borative approach, for all the stakeholders involved

■ INGENIOUS SOLUTIONS

SELECTED BIM REFERENCES

CIC CLINIC CLARENS,SWITZERLANDBG, working in association with GMT Architectes and an electrical engi-neering firm, provided engineering consulting services in the HVAC, MCR, sanitary and medical fluids disciplines and was responsible for the design team coordination related to the reno-vation and extension project of the CIC Clinic, in Clarens. The BG design, fully

developed in BIM, allowed the inte-gration of the various techniques in a coordinated manner with its partners, through to the detailed and construc-tion level of design works. A complex operation in a busy environ-ment, during which the guaranteed full functional use of the clinic was requi-red during the construction works, was one of the main project objectives.

CHENEVIERS IV WASTE TO ENERGY INCINERATION PLANT, GENEVA, SWITZERLANDWorking in partnership with the firms TBF (electromechanical engi-neers) and ASS Architects, BG is responsible for all the project im-plementation phases: Preliminary design, planning permission, tende-ring, execution design, implementa-tion and commissioning. Within the

design team it leads, BG handles all the tasks related to interdisciplinary coordination, BIM Management, civil engineering, building electricity and HVAC, as well as a part of the engi-neering services for the electrome-chanical equipment.The BIM models incorporate the construction phases, simulation and cost estimates of every stage of the project.

CANTONAL ROAD RC773 -MUNICIPALITY OF LUTRY, SWITZER-LAND A BIM variant for road route modifi-cation was also created, incorpora-ting data on the existing terrain, the adaptation of retaining works, land cut/fill volumes, slope parametri-zation, the quantification of take-

offs and estimation of development costs, as well as the extraction of longitudinal and transversal profiles based on the digitized model.

IVRY- PARIS XIII WASTE TO ENERGY FACILITY Conversion of the largest incinera-tion plant facility in Europe (700,000 t incinerated/year, 100,000 dwel-lings heated), located near Paris (Ivry sur Seine), into an organic mat-ter and energy recovery center. BG is responsible for General Project

Management tasks within a design team.

The spatial coordination performed by BG relies upon BIM models. The assignment of tasks and project monitoring is also performed based on this collaborative digital process.

WASTE METHANIZATION PLANTModeling the buildings and exte-riors of plants previously construc-ted to the customer's specifications makes it possible to evaluate the standard configurations, enabling quick decisions to be made, precise quantities to be extracted from the BIM models, and coordinated design concepts for the building services

and foundation elements to be pro-duced. Virtual reality and immersive and explicit representation of the frame provide support to the struc-tural engineers in their calculations.

With the BIM model, the customer is able to integrate, coordinate and fol-low the process throughout the en-tire operating life span of the plant.

LIMMATTAL HOSPITAL , SWITZER-LANDBG is responsible for the preliminary design, design development tende-ring, execution studies and site ma-nagement (structural design of the building, geotechnical design and water drainage concept).

In 2015, the project for the Limmat-tal Hospital (LimmiViva), one of the first major buildings constructed in Switzerland using the BIM ap-proach, won the BIM Silver Award in the “International Projects” category.

© A

rchi

tect

e: B

rune

t Sau

nier

Arc

hite

c-tu

re /

Pers

pect

ive:

Ren

ders

torm

Page 4: BUILDING INFORMATION MODELING (BIM) - FROM …software, Building Information Modeling (BIM) is a new way of working, with a colla-borative approach, for all the stakeholders involved

■ BIM Silver Award 2015 for the Limmattal hospital construction project ■ Nomination for the BIM Gold Award 2016 for the Palexpo Hotel project■ BIM Gold Award 2017 for the future line 16 of the Grand Paris Express (Egis Rail and Société du

Grand Paris). BG Consulting Engineers is a member of the ARTEMIS consortium, together with ARTELIA and ARCADIS, and provides assistance to the Project Ownership and for general ope-rations management in relation to the infrastructures of lines 15, 16 and 17.

FULL CONTACT DETAILS OF THE BG GROUP: WWW.BG-21.COM/CONTACT ■ INGENIOUS SOLUTIONS

Pub

lishe

r: B

G C

onsu

ltin

g E

ngin

eers

, Com

mun

icat

ion

Dep

artm

ent,

Feb

ruar

y 20

18THE BG GROUP, YOUR PARTNER OF CHOICE IN A RAPIDLY EVOLVING BIM ENVIRONMENT

A TEAM OF EXPERIENCED PROFESSIONALS

■ Multi-sectorial BIM references: environment, infrastructure (iBIM), buildings, industry; in particular airports, rail, housing, healthcare, hotels, industrial plants, laboratories, roads, tertiary sector.

■ Implementation of BIM strategies for major projects.■ Prestigious awards (in particular the BIM d'Or Award: Gold award in 2017, nomination in 2016, Silver award in 2015)■ BIM advisors for major stakeholders (WinCASA)

DRIVING DEVELOPMENT IN THE FIELD

■ BIM software for model creation, coordination and management■ Open BIM or Closed BIM data sharing, common data environment■ Gateways between compatible BIM software solutions■ Virtual reality, immersive views for users and operators

COMPETENCE AT EACH PROJECT STAGE

■ Generation of models and use of existing digital data (3D scans)■ BIM management – Establishing project BIM documents, creating models, and managing BIM tendering processes■ BIM coordination – Management of collaboration within design team and contractors, conflict checking■ Use of models for cost programme and facility management (BIM xD)■ Management / maintenance of models

AN ADDED VALUE FOR ALL STAKEHOLDERS

■ Project Owners and public authorities■ Contractors■ Architects and engineering consultants■ Facility and asset managers

© A