building information modeling – bim facility management from …sandaenvironmental.com/slides/bim...

30
Building Information Modeling – BIM Facility Management from Cradle to Grave Building Information Modeling – BIM Facility Management from Cradle to Grave Harry Singh, Project Director Facility Design and Management October 11, 2007 SAME MidAtlantic/Middle East Regional Conference

Upload: others

Post on 31-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Building Information Modeling –BIM Facility Management fromCradle to Grave

Building Information Modeling –BIM Facility Management fromCradle to Grave

Harry Singh, Project DirectorFacility Design and ManagementOctober 11, 2007

SAME MidAtlantic/Middle EastRegional Conference

Page 2: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

OutlineOutline• What is BIM?• Cradle to Grave- Facility Life Cycle• What does it do?• Why do we need it?• New approach – culture change• How does it work – the BIM Concept?• BIM Benefits• Products from BIM• Model Authoring tools• Projects• Bottom Line… Return on Investment• Summary

Page 3: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

What is BIM?What is BIM?

• According to the National Institute of BuildingSciences,” A building Information Model (BIM)is a digital representation of physical andfunctional characteristics of a facility. As suchit serves as a shared knowledge resource forinformation about a facility forming a reliablebasis for decisions during its lifecycle frominception onward.

Page 4: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Cradle to Grave - FacilityLifecycleCradle to Grave - FacilityLifecycle

Occupy/Use

Const

ruct/

Acqu

ire

Maintain

PlanEva

luate Des ign

Adding Knowledge@

Each Phase

InformationExchanges

Serves as a shared knowledge resource for information

Page 5: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

PreliminaryDesignModel APPROVED

WorkingDesignModel

ARCHSIMSPEC

STRU GC

PWR

FAB

CIVIL

ELEC

MECH

ARCH

COST

SAFE

SUP

OPER

CONSTRUCT DeliveredModel

ARCH

IOCFR

OPER

Owner

After All Clashes Have Been ResolvedLock the Model and Build It

Slide courtesy of Deke Smith

The New Approach – Culture ChangeThe New Approach – Culture Change

Page 6: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

What does it do?What does it do?Reduces Cycle Time

• Better Communication• Better management of delivery times• Quicker assembly of larger parts

• Reduces Lifecycle Cost• Less waste because of less re-work• True value engineering performed• Significantly reduced number of change orders

• Improved and Sustainable Product Quality• Some parts assembled off-site with higher quality control• More sustainable product• Product Visualization prior to physical construction

Page 7: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Why Do We Need It?Why Do We Need It?• Inadequate information available to make

decisions at all phases of project• Full consequences of changes to design are

difficult to determine• Specs typically delivered in boxes of paper

documents created at end of project• Warranty information/terms unknown• PM requirements not documented• Unknown system, equipment design criteria• Spare parts information missing, do not know the

suppliers• Lost Opportunities to save O&M Costs

Page 8: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

How Does it Work?How Does it Work?

• The BIM Concept• Three components

• Organization• Design• Information exchange

Page 9: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Owner

Architect ContractorInformation

ExchangeRiskGap

CMLawyers

Insurance

Slide courtesy of Patrick MacLeamy, IAI International

Traditional OrganizationTraditional Organization

S2

Page 10: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Slide 9

S2 Make this graphic more 3Dish.Snyder, 09/12/2007

Page 11: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Architect Contractor

SharedInformation

&Shared

Risk / Reward

Slide courtesy of Patrick MacLeamy, IAI International

To-Be OrganizationTo-Be Organization

Owner

Page 12: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

LitigationPhase

Design DD CDs Construction

Effo

rt

TimeSlide courtesy of Patrick MacLeamy, IAI International

Traditional DesignTraditional Design

Page 13: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

LitigationPhase

To – Be DesignTo – Be DesignEf

fort

Time

Design DD CDs Construction

Slide courtesy of Patrick MacLeamy, IAI International

Page 14: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

To – Be DesignTo – Be Design

LitigationPhase

Design DD CDs Construction

Effo

rt

TimeSlide courtesy of Patrick MacLeamy, IAI International

Page 15: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

StructuralStructuralEngineerEngineer

HVACHVACEngineerEngineer

CityCity

Constr.Constr.ManagerManager

FacilitiesFacilitiesManagerManager

BuildingBuildingOwnerOwner

CivilCivilEngineerEngineer

ArchitectArchitect

Slide courtesy of IAI International

Traditional Information ExchangeTraditional Information Exchange

S4

Page 16: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Slide 14

S4 Make more 3Dish.Snyder, 09/12/2007

Page 17: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

StructuralStructuralEngineerEngineer

HVACHVACEngineerEngineer

CityCity

Constr.Constr.ManagerManager

FacilitiesFacilitiesManagerManager

BuildingBuildingOwnerOwner

CivilCivilEngineerEngineer

ArchitectArchitect

BuildingInformation

Model(BIM)

Slide courtesy of IAI International

To – Be Information ExchangeTo – Be Information Exchange

S5

Page 18: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Slide 15

S5 Make more 3Dish.Snyder, 09/12/2007

Page 19: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Information Exchange LossesInformation Exchange Losses

Management support informationManagement support information should beshould be::•• Collected continuously throughout facility lifeCollected continuously throughout facility life--cycle (created once)cycle (created once)•• Managed uniformly in standard frameworkManaged uniformly in standard framework•• Securely available 24x7Securely available 24x7

Info

rmat

ion

Valu

e

Time

To-Be• Minimized data loss• Maximized information value

PlanningConstruction

Design

Operation

Value of Improvements

As-Is• Continuous data loss• Value of information reduced

© Courtesy of NIBS 2006,2007

Page 20: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

BIM BenefitsBIM Benefits

• Single Entry – Multiple Solutions– Design– Estimating– Fabrication

• Alternates• Design Optimization• Conflict Identification and Resolution• Constructability• Construction Sequencing/Scheduling• Life Cycle Evaluations

Page 21: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Graphisoft

Who benefits from BIM?Who benefits from BIM?

Facility Information ViewsOwnersPlannersRealtorsAppraisersMortgage BankersDesignersEngineersCost & Quantity EstimatorsSpecifiersContracts & LawyersConstruction ContractorsSub-ContractorsFabricatorsCode OfficialsFacility ManagersMaintenance & SustainmentRenovation & RestorationDisposal & Recycling

Scoping, Testing, SimulationSafety & Occupational HealthEnvironmental & NEPAPlant OperationsEnergy, LEEDSpace & SecurityNetwork ManagersCIO’sRisk ManagementOccupant SupportFirst Responders

BIMBIMBIMBIM

©Slide courtesy of c NIBS 2006,2007

Page 22: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Products from BIMProducts from BIM

• Renderings• Animations• Simulations• Construction Plans• Area Analyses• Specifications• Bills of Materials

• Cost Estimates• Energy Analyses• Code Verifications• Design Change

Tracking• Construction

Scheduling• Construction

Sequencing• Digital Fabrication

Page 23: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Model Authoring ToolsModel Authoring Tools

• Archicad – Architectural• CADWorx – Plant Design• Revit – Architectural

Page 24: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Edwardsville School District(Pre-Referendum)Edwardsville School District(Pre-Referendum)

• Models developed in Revit for two differentsites.• Helped identify early renovation challenge.• Quickly generated preliminary plans.• Enabled team to quickly respond to client

changes.

Page 25: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Duke Chiller PlantDuke Chiller Plant• Entirely a 3D design with intelligent components

that enabled an automated bill of materials take offand cost estimate.

• $18M construction cost with only $15k in changeorders.

• BIM viewer enabled virtual walk-through for client.CAD software was not necessary.

• Maintainability was key to design.

Page 26: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

McGuire AFB/Ft. DixMilitary Family HousingMcGuire AFB/Ft. DixMilitary Family Housing• 10 different housing models being developed using

Revit• Building and AutoCAD

• Automated Keyed Notes• Standard building components between units• 3D Design Coordination• Design revisions made quickly• Visualizations shared

Page 27: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Condition AssessmentsCondition Assessments

• Condition data is capturedelectronically in the field.• Less office-time spent on

field notes

• All information is kept inone database.• Easier, faster report

development

• Database can be connectedto BIM and CMMS

Page 28: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Bottom Line … Return OnInvestmentBottom Line … Return OnInvestmentSavings typically come from the

improvement in maintenance efficienciesthat will occur as a result of managingassets holistically using the BIM withminimum information losses from eachphase of the lifecycle. The followingsavings are possible:•Maintenance cost reductions up to 30%•Productivity increases 20-50%•Machine downtime reduced by up to 98%• Profit increases of 25-60%

BIM: Collaboration Consistency Communication

Page 29: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

SummarySummary• BIM is here but information is not yet flowing• BIM will dramatically and profoundly change the

way we work• Business process will change to be information

model centric• Architecture is in the early adoption phase.• Engineering is in the middle of the early adoption

phase.• Contractors are at the beginning of the early

adoption phase.• It will be 5-7 years until most projects are

designed and constructed using BIM.

Page 30: Building Information Modeling – BIM Facility Management from …sandaenvironmental.com/slides/BIM Briefing Midatlantic... · 2010. 11. 7. · Building Information Modeling – BIM

Add footer here

Questions and Discussion?Questions and Discussion?

Harry Singh, Project DirectorWoolpert [email protected](703)820-3840