Page 1: Building GIS Workflow Mgmt Sys Electric Utility

Building a GIS Based Workflow Management System for Electric Utility

Srikanth Reddy Yadiki, RMSI Private Ltd

Page 2: Building GIS Workflow Mgmt Sys Electric Utility

Presentation Outline

Introduction

GIS for Electric Utility

Building GIS data

GIS Enabled Workflow Management

Conclusion

Page 3: Building GIS Workflow Mgmt Sys Electric Utility

Introduction

Delivering a world of solutions

Professional services organization providing enterprise wide geospatial solutions and application software services to utilities worldwide

Manages landbase, network database and GIS applications to provide real-time unified network information for utility industry

RMSI helps utilities to design, store, manage, and maintain network information to operate distribution infrastructure safely, efficiently, and profitably using integrated CAD and GIS tools, with best breed of technologies available

• Web Application Interface• Application Migration• Data Modeling• Custom Tool Development

Application Development

• Enterprise Solution Support• User Need Analysis• Conflation & Migration strategies

GISConsulting

Geo-dataDevelopment

• Data Conversion (Imagery & Vectors)• Conflation & Positional Accuracy Improvement• Legacy Migration & Integration• Data Maintenance

Page 4: Building GIS Workflow Mgmt Sys Electric Utility

GIS For Electric Utility Electric utilities need

– Integrate business functions

– Near real time information

– Ensure long-term sustainability

– Scalability Generation

Transmission Distribution

Conservation Requires interactive real-time network to

ensure improved performance and reliability

An Enterprise GIS based solution provides the tools, applications, workflows, and integration ability supporting the utility functions

Page 5: Building GIS Workflow Mgmt Sys Electric Utility

GIS For Electric Utility

CIS

Mapping / Engineering

Finance

Regulations

CustomerService

AssetManagement

Outage Management

Network Analysis

EngineeringAnalysisSupport

Land Records

Field Data Collection

Work Order Posting

Rules and Standards Enterprise GIS

Page 6: Building GIS Workflow Mgmt Sys Electric Utility

How Does this Work? Electric utility needs accurate and reliable data that automatically controls the

electric distribution system

Utilities require careful and systematic data updating processes

Lack of a coordinated work flow will limit the overall effectiveness

GIS

Build GIS Data !

Streamline Workflow !

Page 7: Building GIS Workflow Mgmt Sys Electric Utility

Creating an electric distribution network model by surveying and network mapping of spatially distributed features.

Building GIS data

Asset inventorying for the entire electric network using field survey

Consumer indexing, attribution and mapping

Network Mapping of SLD and creation of Geodatabase

Build data model and Integration to systems

Survey ConvertData

LoadData

Review&

ConfigureBuildGIS

Page 8: Building GIS Workflow Mgmt Sys Electric Utility

Building GIS Data

CAD standards development/Survey Planning

Establish set of procedures & standards

Preparation of Survey methodology Field Survey & Coding for OH, UG and consumer

connections  using  GPS,  PDA’s  etc.o Primary substations

o Distribution Substations

o Transformer Substations

o Feeder Circuits

o Consumer Connections

Preparation of CAD drawings

Quality checks and validation

Asset Survey & Data Collection

Page 9: Building GIS Workflow Mgmt Sys Electric Utility

Building GIS Data

Conversion specifications

Data collection

Landbase & Network Data

Geometry verification

Topology verification

Linking external data from field survey to related features

Converting CAD data to GIS format

Data Conversion

Migration to staging

Migration to target environment

Data Migration & Loading

Page 10: Building GIS Workflow Mgmt Sys Electric Utility

Building GIS Data

Attribution

Network Connectivity

Domain Values

Feature/Object Relationship

Validation on Custom Requirement

Auto Validation Review

Custom Objects

Subtype Specification

Domains and Validation Rules

Connectivity Rules

Feature Type Selection

Relationships

Page 11: Building GIS Workflow Mgmt Sys Electric Utility

Final Geodatabase creation

Network configuration

Integration to system

Configuration

Building GIS Data

Page 12: Building GIS Workflow Mgmt Sys Electric Utility

GIS Based Workflow Management GIS-based workflow supports automation of

daily business operations of utilities

– Planning

– Engineering

– Operations

– Accounting applications

Automate reporting tools as a virtual dashboard of the GIS system

– Identify locations of new customers or networks

– Synchronized editing and approval process for updating GIS data

– Load analysis

Crew dispatch Job scheduling Survey & Asset data collection Service inspection

Asset data management Outage response Service Connections

Work order value Meter Billing & invoice Payments & Receipts Energy audit

Work Order Design Load demand & Analysis Support Permits & Approvals

Planning

Accounting Operations

Engineering

Page 13: Building GIS Workflow Mgmt Sys Electric Utility

Workflow Management System

WFMSGIS

CUSTOMER SERVICE DEPARTMENT

SURVEY

Location is surveyed and field data is collected and updated

Page 14: Building GIS Workflow Mgmt Sys Electric Utility

Workflow Management Customer Service

– New Connection case– Selecting the New Connection functionality– GIS user logs into the system

User selects New Connection case Log in screen for departmental user

Page 15: Building GIS Workflow Mgmt Sys Electric Utility

Workflow Management New connections case

– Initiation of customer case with details– Submission of the New Connection case to Distribution Planning Department

Enter the details of New Connection case Details generated from Customer Service department

Page 16: Building GIS Workflow Mgmt Sys Electric Utility

Workflow Management

Distribution Planning– Receives and accepts request

– Initiates work order

– Creates design

– Provides details to Network Planning• Requests for survey of proposed line

• Request Survey of Sub station area

– Schedules work

View Cases

Page 17: Building GIS Workflow Mgmt Sys Electric Utility

Workflow Management Network Planning

Analyzing the network to search the nearest electrical equipment

– Checks details about nearest substation

– Match with network planned area

– Generates markup area

– Confirms and sends to distributionAnalyze

Network

Page 18: Building GIS Workflow Mgmt Sys Electric Utility

Workflow Management Engineering Analysis

– Track and check the stage of the case and the user to whom it is assigned– Analyze and provide required permits and approvals– Generates BoM

Case tracking through step by step history logging

Page 19: Building GIS Workflow Mgmt Sys Electric Utility

Workflow Management Operations

– Perform edits to the network

– Updates information back to dashboard

– Field updates integrated to the system

Page 20: Building GIS Workflow Mgmt Sys Electric Utility

Workflow Management Billing & Accounting

– Visualize customer billing trends & analyze usage areas

– Integrate with finance system

– Meter reading system provides customer consumption history

– Release invoice as per billing cycle

Page 21: Building GIS Workflow Mgmt Sys Electric Utility

Workflow Management Outage Management

– Monitor Network emergencies– Visual access to track events– Locate outages– Assign and dispatch crews– Monitor repair crew locations– Create reports

Benefits:

– Minimize response and restoration time

– Improve network and crew management – Track history and reports– Improve service reliability

Zoomed area with feature

Highlighted

Page 22: Building GIS Workflow Mgmt Sys Electric Utility

Conclusion Building GIS data through field design and integrated work order process

increases accuracy.

Regular updating the GIS and adding geographic context into designs, from sketching to close out, provides the opportunity for advanced analysis on how a utility’s  infrastructure  is  developed  and  maintained.  

GIS helps in decision making by this fully automated process provides a high level of data quality, making it possible for utilities to document the network precisely and consistently.

A workflow management system built on GIS helps streamline business functionalities through visualization of mapped assets making use of a single integrated environment.